ETSI TS 129 213-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Policy and charging control signalling flows g.pdf
《ETSI TS 129 213-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Policy and charging control signalling flows g.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 129 213-2018 Digital cellular telecommunications system (Phase 2+) (GSM) Universal Mobile Telecommunications System (UMTS) LTE Policy and charging control signalling flows g.pdf(236页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 129 213 V15.3.0 (2018-07) Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Policy and charging control signalling flows and Quality of Service (QoS) parameter mapping (3GPP TS 29.213 version 15.3.0 Release 15) TECHNICAL SPE
2、CIFICATION ETSI ETSI TS 129 213 V15.3.0 (2018-07)13GPP TS 29.213 version 15.3.0 Release 15Reference RTS/TSGC-0329213vf30 Keywords GSM,LTE,UMTS ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Asso
3、ciation but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or pri
4、nt versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept o
5、n a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx
6、If you find errors in the present document, please send your comment to one of the following services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying an
7、d microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTM
8、and the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSMand the GSM logo are trademarks re
9、gistered and owned by the GSM Association. ETSI ETSI TS 129 213 V15.3.0 (2018-07)23GPP TS 29.213 version 15.3.0 Release 15Intellectual Property Rights Essential patents IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information pertaining to the
10、se essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest
11、 updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
12、 server) which are, or may be, or may become, essential to the present document. Trademarks The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI claims no ownership of these except for any which are indicated as being the property o
13、f ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks. Foreword This Technical Specification (TS) has been
14、 produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables. The cross referen
15、ce between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in cla
16、use 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 129 213 V15.3.0 (2018-07)33GPP TS 29.213 version 15.3.0 Release 15Contents Intellectual Property Rights 2g3
17、Foreword . 2g3Modal verbs terminology 2g3Foreword . 9g31 Scope 10g32 References 10g33 Definitions and abbreviations . 12g33.1 Definitions 12g33.2 Abbreviations . 13g33a Reference architecture 14g34 Signalling Flows over Gx, Gxx, Rx, Sd, Sy, Np, Nt, St and S9 . 17g34.0 General . 17g34.1 IP-CAN Sessio
18、n Establishment 18g34.2 IP-CAN Session Termination . 22g34.2.1 UE-Initiated 22g34.2.1.1 AF located in the HPLMN 22g34.2.1.2 AF located in the VPLMN 25g34.2.2 PCEF-Initiated 27g34.2.2.1 AF located in the HPLMN 27g34.2.2.2 AF located in the VPLMN 29g34.2.3 PCRF-Initiated 30g34.2.3.1 AF located in the
19、HPLMN 30g34.2.3.2 AF located in the VPLMN 32g34.3 IP-CAN Session Modification 34g34.3.1 Network-Initiated IP-CAN Session Modification . 34g34.3.1.1 Interactions between BBERF, PCEF, TDF, OCS, TSSF and PCRF(PCC/QoS/ADC Rule Provisioning in PUSH mode) 34g34.3.1.2 Interactions between PCRF, AF and SPR
20、. 39g34.3.1.2.1 AF Session Establishment . 39g34.3.1.2.2 AF session modification 42g34.3.1.2.2.1 AF located in the HPLMN . 42g34.3.1.2.2.2 AF located in the VPLMN . 44g34.3.1.2.3 AF session termination 45g34.3.1.2.3.1 AF located in the HPLMN . 45g34.3.2 PCEF Initiated IP-CAN Session Modification (PC
21、C Rule Provisioning in PULL Mode) . 47g34.3.2.1 PCEF-initiated IP-CAN Session Modification. AF located in HPLMN. 47g34.3.2.2 PCEF-initiated IP-CAN Session Modification, AF located in the VPLMN . 52g34.4 Gateway Control Session Procedures . 53g34.4.1 Gateway Control Session Establishment 54g34.4.2 Ga
22、teway Control and QoS Rules Request 58g34.4.2.1 Non-Roaming and Home Routed cases . 58g34.4.2.2 Visited access cases. 60g34.4.3 Gateway Control and QoS Rules Provision 61g34.4.4 Gateway Control Session Termination . 62g34.4.4.1 BBERF-Initiated Gateway Control Session Termination . 62g34.4.4.2 PCRF-I
23、nitiated Gateway Control Session Termination 64g34.5 Multiple BBERF Signalling Flows 65g34.5.1 Non-Roaming and Home Routed cases 65g34.5.1.1 New Gateway Control Session Establishment 65g34.5.1.2 PCEF IP-CAN session modification Handover . 67g34.5.1.3 PCEF IP-CAN session modification S2c-based IP flo
24、w mobility . 69g34.5.1.4 Gateway Control Session Establishment and PCEF IP-CAN session modification S2c-based IP flow mobility . 71g34.5.2 Visited access case 72g3ETSI ETSI TS 129 213 V15.3.0 (2018-07)43GPP TS 29.213 version 15.3.0 Release 154.5.2.1 New Gateway Control Session Establishment 72g34.5.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS1292132018DIGITALCELLULARTELECOMMUNICATIONSSYSTEMPHASE2GSMUNIVERSALMOBILETELECOMMUNICATIONSSYSTEMUMTSLTEPOLICYANDCHARGINGCONTROLSIGNALLINGFLOWSGPDF

链接地址:http://www.mydoc123.com/p-742544.html