ETSI TS 102 709-1-2014 Core Network and Interoperability Testing (INT) Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks _1.pdf
《ETSI TS 102 709-1-2014 Core Network and Interoperability Testing (INT) Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks _1.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 102 709-1-2014 Core Network and Interoperability Testing (INT) Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks _1.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 102 709-1 V3.2.1 (2014-10) Core Network and Interoperability Testing (INT); Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and external SIP-I networks; (3GPP Release 8); Part 1: Protocol Implementation Conformance Statement (PICS) TECHNICAL SPECIFICATION ET
2、SI ETSI TS 102 709-1 V3.2.1 (2014-10)2Reference RTS/INT-00116-1 Keywords BICC, interworking, ISUP, PICS, SIP-I, testing ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucrati
3、f enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shal
4、l not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI S
5、ecretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please
6、 send your comment to one of the following services: http:/portal.etsi.org/chaircor/ETSI_support.asp Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of
7、ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2014. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI lo
8、go are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association. ETSI ETSI TS 102 709-1 V3.
9、2.1 (2014-10)3Contents Intellectual Property Rights 4g3Foreword . 4g3Modal verbs terminology 4g31 Scope 5g32 References 5g32.1 Normative references . 5g32.2 Informative references 6g33 Definitions and abbreviations . 6g33.1 Definitions 6g33.2 Abbreviations . 7g34 Scenarios 8g34.1 SIP Profile A and B
10、 for interworking between SIP and BICC/ISUP . 8g34.2 SIP Profile C for Interworking Between SIP with MIME Encoding of ISUP and BICC/ISUP . 9g35 PICS proforma 11g35.1 Instructions for completing the PICS proforma 11g35.1.1 Other information . 11g35.1.2 Purposes and structure 11g35.1.3 Conventions 11g
11、35.2 Identification of the implementation 13g35.2.1 Date of the statement 13g35.2.2 Implementation Under Test (IUT) identification 13g35.2.3 System Under Test (SUT) identification 13g35.2.4 Product supplier 13g35.2.5 Client 13g35.2.6 PICS contact person 13g35.3 PICS proforma tables . 14g35.3.1 Globa
12、l statement of conformance . 14g35.3.2 Roles . 14g35.3.3 Connection types 14g35.3.4 Forward address signalling . 15g35.3.5 Role independent capabilities . 15g35.3.6 Supplementary Services Major Capabilities . 16g35.3.7 Timers . 19g35.4 Additional information for PICS 19g3Annex A (informative): Bibli
13、ography . 20g3History 22g3ETSI ETSI TS 102 709-1 V3.2.1 (2014-10)4Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-me
14、mbers, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant
15、 to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present documen
16、t. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Core Network and Interoperability Testing (INT). The present document is part 1 of a multi-part deliverable covering the Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol and ex
17、ternal SIP-I networks , as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS)“; Part 2: “Test Suite Structure and Test Purposes (TSS Universal Mobile Telecommunications System (UMTS); LTE; Interworking between the 3GPP Cs domain with BICC or ISUP as signalling protocol a
18、nd external SIP-I networks (3GPP TS 29.164 version 8.0.0 Release 8)“. 2.2 Informative references The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject area. Not applicable. 3 Definitions and abbre
19、viations 3.1 Definitions For the purposes of the present document, the following terms and definitions apply: Abstract Test Case (ATC): complete and independent specification of the actions required to achieve a specific test purpose, defined at the level of abstraction of a particular Abstract Test
20、 Method, starting in a stable testing state and ending in a stable testing state Abstract Test Method (ATM): description of how an SUT is to be tested, given at an appropriate level of abstraction to make the description independent of any particular realization of a Means of Testing, but with enoug
21、h detail to enable abstract test cases to be specified for this method Abstract Test Suite (ATS): test suite composed of abstract test cases Implementation Under Test (IUT): implementation of one or more OSI protocols in an adjacent user/provider relationship, being part of a real open system which
22、is to be studied by testing Means Of Testing (MOT): combination of equipment and procedures that can perform the derivation, selection, parameterization and execution of test cases, in conformance with a reference standardized ATS, and can produce a conformance log PICS proforma: document, in the fo
23、rm of a questionnaire, which when completed for an implementation or system becomes the PICS PIXIT proforma: document, in the form of a questionnaire, which when completed for the SUT becomes the PIXIT Point of Control and Observation (PCO): point within a testing environment where the occurrence of
24、 test events is to be controlled and observed, as defined in an Abstract Test Method pre-test condition: setting or state in the SUT which cannot be achieved by providing stimulus from the test environment Protocol Implementation Conformance Statement (PICS): statement made by the supplier of a prot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS10270912014CORENETWORKANDINTEROPERABILITYTESTINGINTINTERWORKINGBETWEENTHE3GPPCSDOMAINWITHBICCORISUPASSIGNALLINGPROTOCOLANDEXTERNALSIPINETWORKS_1PDF

链接地址:http://www.mydoc123.com/p-739404.html