DIN EN 16601-60-2014 Space project management - Part 60 Cost and schedule management German version EN 16601-60 2014《航天项目管理 第60部分 成本和进度管理 德文版本EN 16601-60-2014》.pdf
《DIN EN 16601-60-2014 Space project management - Part 60 Cost and schedule management German version EN 16601-60 2014《航天项目管理 第60部分 成本和进度管理 德文版本EN 16601-60-2014》.pdf》由会员分享,可在线阅读,更多相关《DIN EN 16601-60-2014 Space project management - Part 60 Cost and schedule management German version EN 16601-60 2014《航天项目管理 第60部分 成本和进度管理 德文版本EN 16601-60-2014》.pdf(86页珍藏版)》请在麦多课文档分享上搜索。
1、December 2014 Translation by DIN-Sprachendienst.English price group 27No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).I
2、CS 49.140!%“2278898www.din.deDDIN EN 16601-60Space project management Part 60: Cost and schedule management;English version EN 16601-60:2014,English translation of DIN EN 16601-60:2014-12Raumfahrt-Projektmanagement Teil 60: Kosten- und Zeitplanmanagement;Englische Fassung EN 16601-60:2014,Englische
3、bersetzung von DIN EN 16601-60:2014-12Management des projets spatiaux Partie 60: Matrise des cots et des dlais;Version anglaise EN 16601-60:2014,Traduction anglaise de DIN EN 16601-60:2014-12SupersedesDIN EN 13290-7:2002-12www.beuth.deDocument comprises 86 pagesIn case of doubt, the German-language
4、original shall be considered authoritative.12.14 DIN EN 16601-60:2014-12 2 A comma is used as the decimal marker. National foreword This document (EN 16601-60:2014) has been prepared by Technical Committee CEN/CLC/TC 5 “Space” (Secretariat: DIN, Germany). The responsible German body involved in its
5、preparation was the DIN-Normenausschuss Luft- und Raumfahrt (DIN Standards Committee Aerospace), Working Committee NA 131-10-01 AA Interoperabilitt von Informations-, Kommunikations- und Navigationssystemen. This document supersedes DIN EN 13290-7:2002-12. This document has been developed to cover s
6、pecifically space systems and has therefore precedence over any European Standard covering the same scope but with a wider domain of applicability (e.g. aerospace). Amendments This standard differs from DIN EN 13290-7:2002-12 as follows: a) the number of the standard has been changed; b) the standar
7、d has been editorially revised. Previous editions DIN EN 13290-7: 2002-12 EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 16601-60 August 2014 ICS 49.140 Supersedes EN 13290-7:2001 English version Space project management - Part 60: Cost and schedule management Management des projets spatiaux -
8、 Partie 60: Matrise des cots et des dlais Raumfahrt-Projektmanagement - Teil 60: Kosten- und Zeitplanmanagement This European Standard was approved by CEN on 14 December 2013. CEN and CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giv
9、ing this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN and CENELEC member. This European Standard exists
10、in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN and CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN and CENELEC members
11、 are the national standards bodies and national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malt
12、a, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2014 CEN/CENELEC All rights of exploitation in any form and by any means reserved worldwide for CEN national
13、Members and for CENELEC Members. Ref. No. EN 16601-60:2014 ETable of contents Foreword 6 Introduction 7 1 Scope . 8 2 Normative references . 9 3 Terms, definitions and abbreviated terms 10 3.1 Terms from other standards 10 3.2 Terms specific to the present standard . 10 3.3 Abbreviated terms . 11 4
14、Cost and schedule management common principles . 12 4.1 Objectives and relationships . 12 4.2 Project structure . 13 4.2.1 Work breakdown structure 13 4.2.2 Cost breakdown structure . 14 4.2.3 Business agreement Structure 14 4.2.4 Country/Company structure 15 4.3 Business agreement types 16 4.3.1 Ge
15、neral 16 4.3.2 Fixed price contracts . 16 4.3.3 Cost reimbursement contracts 16 4.3.4 Ceiling price to be converted into fixed price . 17 4.4 Risk management . 17 4.4.1 General description . 17 4.4.2 Risk register 18 4.4.3 Lessons learned . 18 5 Schedule management principles . 19 5.1 Schedule defin
16、ition . 19 5.1.1 General 19 5.1.2 Activities definition / Activities sequencing 19 5.1.3 Key milestones . 20 DIN EN 16601-60:2014-12 EN 16601-60:2014 (E) 2 5.1.4 Resource allocation 20 5.2 Schedule control . 20 5.2.1 Baseline schedule. 20 5.2.2 Current working schedule . 21 5.2.3 Performance evaluat
17、ion 22 5.3 Schedule reporting 24 5.3.1 General 24 5.3.2 Schedule progress information . 24 5.3.3 Reporting system and tools 24 6 Cost management principles . 26 6.1 General . 26 6.2 Contractual and financial interfaces 26 6.2.1 Audited rates and cost structure . 26 6.2.2 Currency and exchange rates
18、. 26 6.2.3 Contract change notice (CCN) 27 6.3 Cost estimating and planning 27 6.3.1 Cost estimating . 27 6.3.2 Development cost plan (DCP) 29 6.3.3 Payment plans 30 6.3.4 Price variation mechanism 30 6.3.5 Geographical distribution 31 6.3.6 Inventory control plan . 31 6.4 Cost control 31 6.4.1 Base
19、line cost plan. 31 6.4.2 Estimate at completion (EAC) and estimate to completion (ETC) . 32 6.4.3 Price variation . 32 6.4.4 Geographical distribution control . 33 6.4.5 Inventory control . 33 6.4.6 Financial audits . 33 6.4.7 Payment milestone achievement 33 6.5 Cost reporting . 34 6.5.1 Reports ap
20、plicable to all contract types . 34 6.5.2 Reports specific to cost reimbursement contracts . 34 7 Cost and schedule management common requirements . 35 7.1 Project structure . 35 7.1.1 Cost breakdown structure . 35 7.1.2 Business agreement structure 35 DIN EN 16601-60:2014-12 EN 16601-60:2014 (E) 3
21、7.1.3 Country/Company structure (CCS) . 35 7.2 Risk management . 35 8 Schedule management requirements . 36 8.1 Schedule definition . 36 8.2 Schedule control . 36 8.3 Schedule reporting 37 9 Cost management requirements . 38 9.1 Contractual and financial interfaces 38 9.1.1 Audited rates and cost st
22、ructure . 38 9.1.2 Economic conditions . 38 9.1.3 Currency and exchange rates . 38 9.1.4 Contract change procedure 38 9.2 Cost estimating and planning 38 9.2.1 Cost estimating . 38 9.2.2 Project financial information 39 9.2.3 Development cost plan (DCP) . 39 9.2.4 Milestone payment plans 39 9.2.5 Pr
23、ice variation mechanism 39 9.2.6 Geographical distribution 39 9.3 Cost control 40 9.3.1 Original baseline cost plan 40 9.3.2 Current baseline cost plan 40 9.3.3 Estimate at completion (EAC) and estimate to completion (ETC) . 40 9.3.4 Price variation mechanism 41 9.3.5 Geographical distribution contr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DINEN16601602014SPACEPROJECTMANAGEMENTPART60COSTANDSCHEDULEMANAGEMENTGERMANVERSIONEN16601602014 航天 项目

链接地址:http://www.mydoc123.com/p-673001.html