BS EN 1395-3-2007 Thermal spraying - Acceptance inspection of thermal spraying equipment - Arc spraying《热喷涂 热喷涂设备的验收检验 电弧喷涂》.pdf
《BS EN 1395-3-2007 Thermal spraying - Acceptance inspection of thermal spraying equipment - Arc spraying《热喷涂 热喷涂设备的验收检验 电弧喷涂》.pdf》由会员分享,可在线阅读,更多相关《BS EN 1395-3-2007 Thermal spraying - Acceptance inspection of thermal spraying equipment - Arc spraying《热喷涂 热喷涂设备的验收检验 电弧喷涂》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53g44g42g43g55g3g47g36g58equipment Part 3: Arc sprayingThe European Standard EN 1395-3:2007 has the status of a British Stan
2、dardICS 25.220.20Thermal spraying Acceptance inspection of thermal spraying BRITISH STANDARDBS EN 1395-3:2007BS EN 1395-3:2007This British Standard was published under the authority of the Standards Policy and Strategy Committee on 28 February 2007 BSI 2007ISBN 978 0 580 50279 8Amendments issued sin
3、ce publicationAmd. No. Date Commentssecretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations. National forewordThis British Sta
4、ndard was published by BSI. It is the UK implementation of EN 1395-3:2007. This standard together with BS EN 1395-1, BS EN 1395-2, BS EN 1395-4, BS EN 1395-5, BS EN 1395-6 and BS EN 1395-7 supersedes BS EN 1395:1996.The UK participation in its preparation was entrusted to Technical Committee STI/40,
5、 Thermally sprayed inorganic finishes.A list of organizations represented on STI/40 can be obtained on request to its EUROPEAN STANDARDNORME EUROPENNEEUROPISCHE NORMEN 1395-3January 2007ICS 25.220.20 Supersedes EN 1395:1996 English VersionThermal spraying - Acceptance inspection of thermal sprayinge
6、quipment - Part 3: Arc sprayingProjection thermique - Contrle dacceptation du matrielde projection thermique - Partie 3: Projection larcThermisches Spritzen - Abnahmeprfungen fr Anlagenzum thermischen Spritzen - Teil 3: LichtbogenspritzenThis European Standard was approved by CEN on 23 December 2006
7、.CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this EuropeanStandard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such nationalstandards may be obtained on ap
8、plication to the CEN Management Centre or to any CEN member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a CEN member into its own language and notified to the CEN Management Centre
9、has the same status as theofficial versions.CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland,France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Por
10、tugal,Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMIT EUROPEN DE NORMALISATIONEUROPISCHES KOMITEE FR NORMUNGManagement Centre: rue de Stassart, 36 B-1050 Brussels 2007 CEN All rights of exploitation in any form and by any means r
11、eservedworldwide for CEN national Members.Ref. No. EN 1395-3:2007: EEN 1395-3:2007 (E) 2 Contents Page Foreword3 1 Scope 4 2 Normative references 4 3 Terms and definitions .4 4 Principles of acceptance inspection4 5 Procedure of acceptance inspection.5 6 Designation 5 7 Inspection report5 Annex A (i
12、nformative) Inspection report for arc spraying equipment (initial test/retest)6 Bibliography 8 EN 1395-3:2007 (E) 3 Foreword This document (EN 1395-3:2007) has been prepared by Technical Committee CEN/TC 240 “Thermal spraying and thermally sprayed coatings”, the secretariat of which is held by DIN.
13、This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by July 2007, and conflicting national standards shall be withdrawn at the latest by July 2007. This document together with EN 1395-1, 1395-2, 1395-4,
14、1395-5, 1395-6 and 1395-7 supersedes EN 1395:1996. EN 1395 consists of the following Parts, under the general title Thermal spraying Acceptance inspection of thermal spraying equipment: Part 1: General requirements; Part 2: Flame spraying including HVOF; Part 3: Arc spraying; Part 4: Plasma spraying
15、; Part 5: Plasma spraying in chambers; Part 6: Manipulator systems; Part 7: Powder feed systems. According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Cyprus, Czech
16、 Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. EN 1395-3:2007 (E) 4 1 Scope This European Standar
17、d specifies requirements for the acceptance inspection of thermal spraying equipment, in this case arc spraying, used to produce thermally sprayed coatings of reproducible quality. This part should be used in conjunction with EN 1395-1, which includes general requirements and explanations of procedu
18、res. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 657:2005, Thermal
19、spraying Terminology, classification EN ISO 14919:2001, Thermal spraying Wires, rods and cords for flame and arc spraying Classification Technical supply conditions (ISO 14919:2001) 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 657:2005 apply. 4 Pri
20、nciples of acceptance inspection 4.1 General The following clauses reveal state of the art technology in thermal spraying equipment and the minimum requirements concerning a stable parameter setting and maintenance as given in Annex A. 4.2 Atomising gas The atomising gas hoses and the control device
21、 shall be designed in such a manner that an undisturbed operation is ensured. 4.3 Arc spraying nozzle The nozzle system (contact tubes and air nozzle) shall permit a constant arc to be maintained and provide atomisation without causing deposits that might disturb the operation. 4.4 Spraying wire fee
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN139532007THERMALSPRAYINGACCEPTANCEINSPECTIONOFTHERMALSPRAYINGEQUIPMENTARCSPRAYING 喷涂 设备 验收 检验 电弧

链接地址:http://www.mydoc123.com/p-548966.html