BS 6187-2011 Code of practice for full and partial demolition《全部和部分拆除的实施规程》.pdf
《BS 6187-2011 Code of practice for full and partial demolition《全部和部分拆除的实施规程》.pdf》由会员分享,可在线阅读,更多相关《BS 6187-2011 Code of practice for full and partial demolition《全部和部分拆除的实施规程》.pdf(168页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS 6187:2011Code of practice for full andpartial demolitionPublishing and copyright informationThe BSI copyright notice displayed in this document indicates when the documentwas
2、last issued. BSI 2011ISBN 978 0 580 65566 1ICS 91.200The following BSI references relate to the work on this standard:Committee reference B/513Draft for comment 11/30153572 DCPublication historyFirst published as CP 94 in 1971First published as BS 6187 in 1982Second edition published September 2000T
3、hird (present) edition, December 2011Amendments issued since publicationDate Text affectedBS 6187:2011 BRITISH STANDARDContentsForeword iiiIntroduction v1 Scope 12 Normative references 13 Terms and definitions 24 Approaches to demolition 85 Planning and managing projects (see Figure 3) 146 Procureme
4、nt 267 Knowledge of the site (see Figure 5) 298 Decommissioning procedures (see Figure 6) 389 Identifying structural hazards (see Figure 7) 4210 Health hazards (see Figure 8) 4611 Health and safety of people on or off site (see Figure 9) 5212 Protection of people and the environment (see Figure 10)
5、6513 Safe working spaces and exclusion zones (see Figure 11) 7514 Structural demolition: Principles, mechanisms and hazards (seeFigure 20) 8815 Avoidance of unplanned structural collapses (see Figure 21) 9416 Temporary structures for stability, support and access (see Figure 22) 9817 Demolition tech
6、niques (see Figure 23) 10318 Materials handling and processing 11619 Typical demolition methods for various types of structure (see Figure25) 12120 Completion of the works 134AnnexesAnnex A (informative) Training and competencies 136Annex B (informative) Legislation, statutory regulations, codes of
7、practice andguidance relevant to demolition 137Annex C (informative) Useful contacts for demolition work 139Annex D (informative) Heritage 142Annex E (informative) Demolition waste protocols 144Annex F (normative) Hazards associated with prestressed materials 146Bibliography 152List of figuresFigure
8、 1 Outline route map viFigure 2 Base machine, equipment and attachments 3Figure 3 Route map for Clause 5 13Figure 4 Flowchart for maintaining structural stability 18Figure 5 Route map for Clause 7 29Figure 6 Route map for Clause 8 38Figure 7 Route map for Clause 9 42Figure 8 Route map for Clause 10
9、46Figure 9 Route map for Clause 11 52Figure 10 Route map for Clause 12 65Figure 11 Route map for Clause 13 75Figure 12 Terminology of designed exclusion zone and its constituent parts(typical for controlled explosive demolition) 77Figure 13 Example of designed exclusion zone showing practical applic
10、ation(typical for controlled explosive demolition) 78Figure 14 Example of designed exclusion zone showing phased and partialdemolition (typical for controlled explosive demolition) 79Figure 15 Example of reduced exclusion zone by the use of containment(typical for floor-by-floor or top-down demoliti
11、on) 80BRITISH STANDARD BS 6187:2011 BSI 2011 iFigure 16 Example of safe working space within an exclusion zone (typical formechanical reduction or top-down demolition employing mechanical plant,etc.) 81Figure 17 Plan of typical progressive demolition sequence, column-to-columnmaintaining a “square”
12、to provide lateral support 82Figure 18 Elevation: typical multistorey structure demolition sequence working“top down” outwards towards the shear walls (strong points), i.e. lift shafts andstairwells 82Figure 19 Plan of demolition sequence working inwards and outwards towardsthe structural elements p
13、roviding stability, such as shear walls 83Figure 20 Route map for Clause 14 87Figure 21 Route map for Clause 15 94Figure 22 Route map for Clause 16 98Figure 23 Route map for Clause 17 102Figure 24 Route map of 17.11 109Figure 25 Route map for Clause 19 119Figure 25 Route map for Clause 19 (continued
14、) 120Figure E.1 The 2008 ICE Demolition Protocol 17 146List of tablesTable 1 Determining the significance of demolition activities on structuralstability 8Table2Types of structural refurbishment 12Table3Types of survey and levels and information that might be revealed bysurveys 30Table 4 Examples of
15、 types and purposes of building and structureinvestigation 35Table 5 Key features to be sampled for potential hazards 36Table 6 Areas of an exclusion zone 76Table 7 Examples of hazards related to the areas of an exclusion zone 85Table C.1 Useful contacts for demolition work 139Summary of pagesThis d
16、ocument comprises a front cover, an inside front cover, pages i to vi,pages 1 to 158, an inside back cover and a back cover.BRITISH STANDARDBS 6187:2011ii BSI 2011ForewordPublishing informationThis British Standard is published by BSI and came into effect on31 December 2011. It was prepared by BSI P
17、anel B/513/-/9, under the authorityof Technical Committee B/513, Construction equipment and plant and site safety.A list of organizations represented on this committee can be obtained onrequest to its secretary.SupersessionBS 6187:2011 supersedes BS 6187:2000, which is withdrawn.Information about th
18、is documentThis standard has been revised to reflect advances in technology and equipmentin the demolition industry, and to give recommendations on the followingprincipal areas.a) Project development and management, site assessments, risk assessments,decommissioning procedures, environmental provisi
19、ons and facaderetention.b) Deconstruction techniques, including activities for reuse and recycling.c) Exclusion zones and safe working spaces, including their design andapplication.Recommendations for methods of, and techniques for, demolition and partialdemolition, including for structural refurbis
20、hment, have been retained, withconsideration of specific types of structure, but the text has been significantlyupdated to reflect current and developing good practices. By being lessprescriptive, this edition also allows for innovative techniques and methods tobe employed.Use of this documentAs a c
21、ode of practice, this British Standard takes the form of guidance andrecommendations. It should not be quoted as if it were a specification andparticular care should be taken to ensure that claims of compliance are notmisleading.Any user claiming compliance with this British Standard is expected to
22、be able tojustify any course of action that deviates from its recommendations.It has been assumed in the preparation of this British Standard that theexecution of its provisions will be entrusted to appropriately qualified andexperienced people, for whose use it has been produced.Presentational conv
23、entionsThe provisions in this standard are presented in roman (i.e. upright) type. Itsrecommendations are expressed in sentences in which the principal auxiliaryverb is “should”.Commentary, explanation and general informative material is presented insmaller italic type, and does not constitute a nor
24、mative element.Contractual and legal considerationsThis publication does not purport to include all the necessary provisions of acontract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legalobligations.BRITISH STANDARD BS 6187:2011 B
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS61872011CODEOFPRACTICEFORFULLANDPARTIALDEMOLITION 全部 部分 拆除 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-545797.html