ASTM F2688-2008 Standard Guide for System-Based Customer-Centered Quality Plan for Manufacturers《系统为基础、以客户为中心的制造质量计划的标准指南》.pdf
《ASTM F2688-2008 Standard Guide for System-Based Customer-Centered Quality Plan for Manufacturers《系统为基础、以客户为中心的制造质量计划的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2688-2008 Standard Guide for System-Based Customer-Centered Quality Plan for Manufacturers《系统为基础、以客户为中心的制造质量计划的标准指南》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2688 08Standard Guide forSystem-Based, Customer-Centered Quality Plan forManufacturers1This standard is issued under the fixed designation F 2688; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revi
2、sion. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide establishes recommended system-based pro-cedures to assist fastener manufacturers and alteration distribu-tors in t
3、he development of process controls which are intendedto produce quality products in a cost effective manner. Theserecommended system-based procedures allow an organizationto continually improve operational effectiveness.2. Referenced Documents2.1 ASTM Standards:2F 1469 Guide for Conducting a Repeata
4、bility and Repro-ducibility Study on Test Equipment for NondestructiveTestingF 1470 Guide for Fastener Sampling for Specified Mechani-cal Properties and Performance InspectionF 1503 Practice for Machine/Process Capability Study Pro-cedureF 1789 Terminology for F16 Mechanical FastenersF 2282 Specific
5、ation for Quality Assurance Requirementsfor Carbon and Alloy Steel Wire, Rods, and Bars forMechanical Fasteners2.2 ASTM Manual:Manual 22 Total Quality Management-Guiding Principlesfor Application22.3 IFI Standard:IFI-139 Quality Assurance Requirements for Fastener Test-ing Laboratories2.4 ASME Stand
6、ards:B18.18.1 Inspection and Quality Assurance for GeneralPurpose Fasteners3B18.18.2 Inspection and Quality Assurance for High-Volume Machine Assembly Fasteners32.5 NIST Program:Malcolm Baldrige Criteria for Excellence (www.nist.gov)2.6 ISO Standard:ISO 16426 FastenersQuality Assurance System4NOTE 1
7、There is no direct relationship of this standard to an ISOcounterpart. However, several elements of this guide may be found inISO 16426.3. Terminology3.1 Terms shall be defined in accordance with TerminologyF 1789.4. Significance and Use4.1 A need exists for a Quality Systems Guide that may bedeploy
8、ed by small to larger manufacturers that give directionon development of process-based systems that drive qualityand continuous improvement. This guide does not require thirdparty regulation, thus making it attractive to those manufactur-ers who are not required to have such certification.5. Managem
9、ents Role5.1 Executive management shall be responsible for commit-ment to a company-wide quality policy. The Quality Policyshall be published, maintained, understood and implementedby all company operation groups.5.2 Quality ManualThe management commitment shallbe fully supported by a quality manual
10、 which shall be underperiodic review.5.3 Personnel TrainingManagement shall assume respon-sibility for providing appropriate training for all companypersonnel.Appropriate training shall include, but not be limitedto, job skills, process knowledge, quality training, environmen-tal issues, and safety
11、skills for all organizational processstreams.6. Inquiries and Quotation6.1 Review of Drawings and SpecificationsAll drawingsand specifications that are applicable to a given inquiry shall be1This guide is under the jurisdiction of ASTM Committee F16 on Fasteners andis the direct responsibility of Su
12、bcommittee F16.93 on QualityAssurance Provisionsfor Fasteners.Current edition approved Jan. 1, 2008. Published January 2008.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, r
13、efer to the standards Document Summary page onthe ASTM website.3Available from American Society of Mechanical Engineers (ASME), ASMEInternational Headquarters, Three Park Ave., New York, NY 10016-5990, http:/www.asme.org.4Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4t
14、h Floor, New York, NY 10036, http:/www.ansi.org.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.reviewed prior to issuance of a quotation. This review shallinclude engineering, manufacturing, production materials, pro-cesses, quality
15、 assurance, cost accounting and outside sourcingas applicable to ensure that all of the customers requirementscan be met.6.2 Ongoing ReviewThe activity specified in 6.1 shall besubject to a periodic internal audit/review which will evaluateits ability to respond to the purchaser in a timely and accu
16、ratemanner. Frequency of the internal audit/review shall be deter-mined on past audit/reviews, but shall be conducted at leastonce a year. The results of the review shall be reported to andreviewed by management.7. Engineering7.1 Specification RequirementsFor products defined byrecognized standards,
17、 there shall be evidence that the appli-cable specifications for material, configuration, processing,finishing, inspection testing and packaging, were based uponestablished requirements specified in these standards and arerelated to fit, form, and function. Unless otherwise specified inthe contract
18、or purchase order, the latest revision of any citedor applicable specification shall be used.7.2 Drawing RequirementsDrawings shall define all fea-tures and characteristics of the fastener. The use of informalsketches, uncontrolled drawings, and red lined changes todrawings, specifications, and proc
19、ess documents shall not bepermitted in the purchasing, fabrication, process, test, orinspection operations.7.3 Design Change/Configuration ControlA documentedprocedure shall exist for controlling and authorizing thedevelopment, release, change, use, and control of designdocuments. The procedure shal
20、l be adequate to prevent the useof obsolete design documents.8. Procurement8.1 Responsibilities of ProcurementThe system and pro-cess for procurement of fastener materials, services, compo-nents, and assemblies shall be formally planned, documented,and controlled. The authority and responsibility of
21、 the organi-zations involved in interaction with the control of suppliersshall be established by management and documented. Thefastener manufacturer and alteration distributor shall have anactive documented system to verify the performance of sup-pliers.8.2 Supplier EvaluationThe appropriate represe
22、ntativesfrom all segments of the organization shall participate, asneeded, for approval of sources of materials and services.8.3 Source Approvals and ControlsThe organization shallformally audit on-site the suppliers or sources capability tofurnish conforming materials and/or services relevant to su
23、p-ply, manufacture, processing, or alteration of fasteners. Thisaudit shall be documented with procedures that include input asrequired, from quality assurance, engineering, materials, pro-cessing, and procurement. Subsequently, the suppliers orsources shall be evaluated on the basis of on-site surv
24、eys,physical audits, or current quality history. Such evaluationsshall be conducted on an ongoing basis, but no less thanannually. Evidence of evaluations shall be current and on-siteaudits shall be conducted at least once every four years.8.4 Technical RequirementsSpecifications, drawings, andpurch
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF26882008STANDARDGUIDEFORSYSTEMBASEDCUSTOMERCENTEREDQUALITYPLANFORMANUFACTURERS 系统 基础 客户 中心 制造 质量

链接地址:http://www.mydoc123.com/p-539275.html