《ASTM F1216-2007b Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube《通过树脂浸渍管的倒置和硫化修复现有管线和管道的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F1216-2007b Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube《通过树脂浸渍管的倒置和硫化修复现有管线和管道的标准实施规程》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 1216 07bAn American National StandardStandard Practice forRehabilitation of Existing Pipelines and Conduits by theInversion and Curing of a Resin-Impregnated Tube1, 2This standard is issued under the fixed designation F 1216; the number immediately following the designation indicates
2、the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice describes the procedures for the
3、recon-struction of pipelines and conduits (4 to 108-in. diameter) bythe installation of a resin-impregnated, flexible tube which isinverted into the existing conduit by use of a hydrostatic heador air pressure. The resin is cured by circulating hot water orintroducing controlled steam within the tub
4、e. When cured, thefinished pipe will be continuous and tight-fitting. This recon-struction process can be used in a variety of gravity andpressure applications such as sanitary sewers, storm sewers,process piping, electrical conduits, and ventilation systems.1.2 The values stated in inch-pound units
5、 are to be regardedas the standard. The values given in parentheses are forinformation only.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health pract
6、ices and determine the applica-bility of regulatory limitations prior to use. For specificprecautionary statements, see 7.4.2.2. Referenced Documents2.1 ASTM Standards:3D 543 Practices for Evaluating the Resistance of Plastics toChemical ReagentsD 638 Test Method for Tensile Properties of PlasticsD
7、790 Test Methods for Flexural Properties of Unreinforcedand Reinforced Plastics and Electrical Insulating MaterialsD 903 Test Method for Peel or Stripping Strength of Adhe-sive BondsD 1600 Terminology for Abbreviated Terms Relating toPlasticsD 3839 Guide for Underground Installation of “Fiberglass”(
8、Glass-FiberReinforced Thermosetting-Resin) PipeF 412 Terminology Relating to Plastic Piping Systems2.2 AWWA Standard:Manual on Cleaning and Lining Water Mains, M 2842.3 NASSCO Standard:Recommended Specifications for Sewer Collection SystemRehabilitation5NOTE 1An ASTM specification for cured-in-place
9、 pipe materialsappropriate for use in this standard is under preparation and will bereferenced in this practice when published.3. Terminology3.1 Definitions are in accordance with Terminology F 412and abbreviations are in accordance with Terminology D 1600,unless otherwise specified.3.2 Definitions
10、of Terms Specific to This Standard:3.2.1 cured-in-place pipe (CIPP)a hollow cylinder con-taining a nonwoven or a woven material, or a combination ofnonwoven and woven material surrounded by a cured thermo-setting resin. Plastic coatings may be included. This pipe isformed within an existing pipe. Th
11、erefore, it takes the shape ofand fits tightly to the existing pipe.3.2.2 inversionthe process of turning the resin-impregnated tube inside out by the use of water pressure or airpressure.3.2.3 lifta portion of the CIPP that has cured in a positionsuch that it has pulled away from the existing pipe
12、wall.4. Significance and Use4.1 This practice is for use by designers and specifiers,regulatory agencies, owners, and inspection organizations whoare involved in the rehabilitation of conduits through the use ofa resin-impregnated tube inverted through the existing conduit.As for any practice, modif
13、ications may be required for specificjob conditions.1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.67 onTrenchless Plastic Pipeline Technology.Current edition approved June 1, 2007. Published June 2007. Ori
14、ginallyapproved in 1989. Last previous edition approved 2007 as F 1216 07a.2The following report has been published on one of the processes: Driver, F. T.,and Olson, M. R., “Demonstration of Sewer Relining by the Insituform Process,Northbrook, Illinois,” EPA-600/2-83-064, Environmental Protection Ag
15、ency, 1983.Interested parties can obtain copies from the Environmental Protection Agency orfrom a local technical library.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, ref
16、er to the standards Document Summary page onthe ASTM website.4Available from American Water Works Association (AWWA), 6666 W. QuincyAve., Denver, CO 80235, http:/www.awwa.org.5Available from the National Association of Sewer Service Companies, 101Wymore Rd., Suite 501, Altamonte, FL 32714.1Copyright
17、 ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5. Materials5.1 TubeThe tube should consist of one or more layers offlexible needled felt or an equivalent nonwoven or wovenmaterial, or a combination of nonwoven and woven materials,capable of c
18、arrying resin, withstanding installation pressuresand curing temperatures. The tube should be compatible withthe resin system used. The material should be able to stretch tofit irregular pipe sections and negotiate bends. The outsidelayer of the tube should be plastic coated with a material thatis c
19、ompatible with the resin system used. The tube should befabricated to a size that, when installed, will tightly fit theinternal circumference and the length of the original conduit.Allowance should be made for circumferential stretchingduring inversion.5.2 ResinA general purpose, unsaturated, styren
20、e-based,thermoset resin and catalyst system or an epoxy resin andhardener that is compatible with the inversion process shouldbe used. The resin must be able to cure in the presence of waterand the initiation temperature for cure should be less than180F (82.2C). The CIPP system can be expected to ha
21、ve asa minimum the initial structural properties given in Table 1.These physical strength properties should be determined inaccordance with Section 8.6. Design Considerations6.1 General GuidelinesThe design thickness of the CIPPis largely a function of the condition of the existing pipe.Design equat
22、ions and details are given in Appendix X1.7. Installation7.1 Cleaning and Inspection:7.1.1 Prior to entering access areas such as manholes, andperforming inspection or cleaning operations, an evaluation ofthe atmosphere to determine the presence of toxic or flammablevapors or lack of oxygen must be
23、undertaken in accordancewith local, state, or federal safety regulations.7.1.2 Cleaning of PipelineAll internal debris should beremoved from the original pipeline. Gravity pipes should becleaned with hydraulically powered equipment, high-velocityjet cleaners, or mechanically powered equipment (seeNA
24、SSCO Recommended Specifications for Sewer CollectionSystem Rehabilitation). Pressure pipelines should be cleanedwith cable-attached devices or fluid-propelled devices asshown in AWWA Manual on Cleaning and Lining WaterMains, M 28.7.1.3 Inspection of PipelinesInspection of pipelinesshould be performe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF12162007BSTANDARDPRACTICEFORREHABILITATIONOFEXISTINGPIPELINESANDCONDUITSBYTHEINVERSIONANDCURINGOFARESINIMPREGNATEDTUBE

链接地址:http://www.mydoc123.com/p-534431.html