ASTM E2942-2015 Standard Guide for Security of Tank Farm Installations for Compliance with Spill Prevention Control and Countermeasure Plan (SPCC) Regulations《为使与泄露预防 控制和对策方案 (SPCC.pdf
《ASTM E2942-2015 Standard Guide for Security of Tank Farm Installations for Compliance with Spill Prevention Control and Countermeasure Plan (SPCC) Regulations《为使与泄露预防 控制和对策方案 (SPCC.pdf》由会员分享,可在线阅读,更多相关《ASTM E2942-2015 Standard Guide for Security of Tank Farm Installations for Compliance with Spill Prevention Control and Countermeasure Plan (SPCC) Regulations《为使与泄露预防 控制和对策方案 (SPCC.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2942 15Standard Guide forSecurity of Tank Farm Installations for Compliance withSpill Prevention, Control and Countermeasure Plan (SPCC)Regulations1This standard is issued under the fixed designation E2942; the number immediately following the designation indicates the year oforiginal
2、adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.INTRODUCTIONFederal Regulation 40 CFR 112.3 requires an owner or operator of cer
3、tain onshore or offshorefacilities that have tanks used for storing oil to prepare a written Spill Prevention Control andCountermeasure Plan (SPCC Plan). The SPCC Plan must include a description of the securitymeasures that are implemented at the facility to prevent unauthorized access to oil handli
4、ng,processing, and storage areas. Such security measures may involve fencing, lighting and other moresophisticated systems.The SPCC rule defines Tier I and Tier II facilities. The owner/operator of Tier I and certain Tier IIfacilities may prepare and self-certify the SPCC Plan. Refer to United State
5、s Environmental ProtectionAgency - Office of Solid Waste and Emergency Response Spill Prevention, Control and Countermea-sure (SPCC) Rule - Stream-lined Requirements for Tier I and Tier II Qualified Facilities for aid indetermining if a particular facility is a qualified Tier I or Tier II facility.
6、If the requirements forself-certification are not met then the SPCC Plan must be certified by a Professional Engineer (P.E.)Some states do not permit self-certification of SPCC Plans and thus requires that all SPCC Plans becertified by a Professional Engineer (P.E.) The owner/operator should check w
7、ith the state engineeringlicensing board to find out if it prohibits SPCC Plan self-certification.1. Scope1.1 This guide covers fencing and lighting only. Moresophisticated security systems may be appropriate for thefacility but discussion of these types of systems is beyond thescope of this documen
8、t.1.2 The information included in this guide is intended forpetroleum bulk storage facilities. It is not intended for use withretail fueling and other motor fueling facilities, refineries,chemical plants, docks, oil production facilities, or electricpower generation, transmission, distribution and s
9、ervice centerfacilities. Fencing, lighting or other security measures designedto prevent unauthorized access to the bulk storage facility maybe components of Best Management Practices (BMPs) that thefacility uses to prevent releases of petroleum to storm waterdischarges. There are several different
10、types of fencing andlighting that can be effective. The intent of this document is tooutline a method for providing security fencing and lightingthat has been effectively used. There are other fencing andlighting methods that may be adequately effective. Somefacilities may be considered adequately s
11、ecure without fencingor lighting. An analysis of the threat level should be made todetermine the type of security system to employ.1.3 Any facilities must meet local, state, and federalbuilding, architectural, hazardous material handling andstorage, and fire protection codes.1.4 The values stated in
12、 inch-pound units are to be regardedas standard. No other units of measurement are included in thisstandard.2. Referenced Documents2.1 ASTM Standards:2A121 Specification for Metallic-Coated Carbon SteelBarbed WireA123 Specification for Zinc (Hot-Dip Galvanized) Coatingson Iron and Steel Products1Thi
13、s test method is under the jurisdiction of ASTM Committee E50 onEnvironmental Assessment, Risk Management and Corrective Action and is thedirect responsibility of Subcommittee E50.01 on Storage Tanks.Current edition approved Oct. 15, 2015. Published December 2015. DOI:10.1520/E29422For referenced AS
14、TM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshoho
15、cken, PA 19428-2959. United States1A392 Specification for Zinc-Coated Steel Chain-Link FenceFabricA567/A567M Specification for Castings, Iron, Cobalt, andNickel-Base Alloy, for High Strength at Elevated Tem-peratures (Withdrawn 1987)3A817 Specification for Metallic-Coated Steel Wire forChain-Link Fe
16、nce Fabric and Marcelled Tension WireF626 Specification for Fence FittingsF900 Specification for Industrial and Commercial SteelSwing GatesF1043 Specification for Strength and Protective Coatings onSteel Industrial Fence FrameworkF1083 Specification for Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanize
17、d) Welded, for Fence StructuresF1184 Specification for Industrial and Commercial Horizon-tal Slide Gates2.2 Chain Link Fence Manufacturers Institute:4CLF SFR0111 Security Fencing Recommendations TheTested and Proven Performance of Security Grade ChainLink Fencing SystemsCLF-WLG 0110 Chain Link Fence
18、 Wind Load Guide forSelection of Line Post and Line Post SpacingCLF-PM0610 Product Manual2.3 United States Department of Transportation:5AC150/5370 10FItem F-161 Wire fence With Steel Posts (Class C and DFence)Item F-162 Chain Link Fence ItemF-163 Wildlife Deterrent Fence2.4 United States Environmen
19、tal Protection Agency:Federal Regulation 40 CFR 112 Oil Prevention PollutionOffice of Solid Waste and Emergency Response SpillPrevention, Control, and Countermeasure (SPCC) Rule Streamlined Requirements for Tier I and Tier II QualifiedFacilities2.5 Federal Standards:6Federal Specification RR-F-191K/
20、GEN Fencing, Wire andPost Metal (And Gates, Chain Link Fence Fabric, andAccessories-(General Specification)RR-F-191/1 Fencing, Wire and Post, Metal (Chain-LinkFence Fabric)RR-F-191/2 Fencing, Wire and Post, Metal (Chain- LinkFence Gates)RR-F-191/3 Fencing, Wire and Post, Metal (Chain-LinkFence Posts
21、, Top Rails, and Braces)RR-F-191/4 Fencing, Wire and Post, Metal (Chain-LinkFence Accessories)2.6 Lighting:NFPA 70 National Electric Code Introduction, Chapter 1,Chapter 2, Chapter 3, Chapter 4, Article 410 International Building Code Section 1205Illumination Society of North AmericaUnited States En
22、vironmental Protection Agency 40 FR112 Oil Pollution Prevention3. Terminology3.1 Definitions:3.1.1 foot candleis a non-SI unit of illuminance or lightintensity, abbreviated fc, lm/ft2, ft-c.3.1.1.1 DiscussionThe SI unit is lux. One foot candle isapproximately equal to 10.764 lux.4. Threat Level4.1 T
23、he first step is for the owner to investigate anddetermine the perceived threat level. From that determination ajudgment on the type and extent of fencing and the type andextent of lighting can be made. Helpful references are detailedin Section 2 above. Contacting the Department of HomelandSecurity
24、(DHS) to obtain a security analysis and a vulnerabilitystudy may be helpful. Further contacting the local policedepartment or sheriff for guidance on security strategies in thelocal area based on familiarity with the threat characteristics ofthe area will be helpful.5. Fencing Systems5.1 The referen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME29422015STANDARDGUIDEFORSECURITYOFTANKFARMINSTALLATIONSFORCOMPLIANCEWITHSPILLPREVENTIONCONTROLANDCOUNTERMEASUREPLANSPCCREGULATIONS

链接地址:http://www.mydoc123.com/p-532144.html