ASTM E2813-2012e1 Standard Practice for Building Enclosure Commissioning《建筑围护结构试运行的标准实践规程》.pdf
《ASTM E2813-2012e1 Standard Practice for Building Enclosure Commissioning《建筑围护结构试运行的标准实践规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2813-2012e1 Standard Practice for Building Enclosure Commissioning《建筑围护结构试运行的标准实践规程》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2813 121Standard Practice forBuilding Enclosure Commissioning1This standard is issued under the fixed designation E2813; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parenthes
2、es indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEEditorial changes were made throughout in April 2015.INTRODUCTIONBuilding Enclosure Commissioning (BECx) is a process that begins with the establishment of theOw
3、ners Project Requirements (OPR) and endeavors to ensure that the exterior enclosure and thoseelements intended to provide environmental separation within a building or structure meet or exceedthe expectations of the Owner as defined in the OPR.Afundamental understanding of the most currentpublished
4、edition of ASHRAE Standard 202, Commissioning Process for Buildings and Systems andASTM E2947, Standard Guide for Building Enclosure Commissioning is recommended for optimaluse and application of this practice.1. Scope1.1 This practice is intended to serve as a concise,authoritative, and technically
5、 sound practice for BuildingEnclosure Commissioning (BECx) that establishes two levelsof BECx: Fundamental and Enhanced (refer also to Section 4).1.2 The BECx process as defined in this practice includesthe following phases and sub-phases:1.2.1 Pre-design,1.2.2 Design,1.2.2.1 Schematic Design,1.2.2.
6、2 Design Development,1.2.2.3 Construction Documentation,1.2.3 Pre-Construction,21.2.4 Construction, and1.2.5 Occupancy and Operations.1.3 This practice includes a mandatory OPR DevelopmentGuideline (AnnexA1) and requires the development of an OPRfor both Fundamental and Enhanced BECx that addresses,
7、 at aminimum, the performance attributes and metrics included inAnnex A1 of this practice.1.4 This practice includes mandatory BECx PerformanceTesting Requirements (Annex A2) approved for use with thispractice to evaluate the performance and durability of enclo-sure materials, components, systems, a
8、nd assemblies.1.5 This practice mandates independent, third-party designpeer review during the Design Phase of both Fundamental andEnhanced BECx.1.6 This practice recognizes that the OPR for exteriorenclosure performance and environmental separation mayexceed the baseline requirements of applicable
9、building codesand standards and provides guidance for the development of anOPR based on the following attributes as defined in Annex A1of this practice:1.6.1 Energy,1.6.2 Environment,1.6.3 Safety,1.6.4 Security,1.6.5 Durability,1.6.6 Sustainability, and1.6.7 Operation.1.7 The terms “building enclosu
10、re” and “enclosure” as theyappear in this practice refer collectively to all materials,components, systems, and assemblies intended to provideshelter and environmental separation between interior andexterior, or between two or more environmentally distinctinterior spaces in a building or structure.1
11、.8 This practice establishes that the Building EnclosureCommissioning Provider (BECxP) refers specifically to theindividual retained by the Owner to develop, manage, and be inresponsible charge of the BECx process, including individualmembers and technical specialists that may comprise the BECxteam
12、(see 4.2).1This practice is under the jurisdiction of ASTM Committee E06 on Perfor-mance of Buildings and is the direct responsibility of Subcommittee E06.55 onPerformance of Building Enclosures.Current edition approved Feb. 1, 2012. Published April 2015. Originallyapproved in 2012. Last previous ed
13、ition approved in 2012 as E281312. DOI:10.1520/E2813-12E01.2See 5.1.3, Pre-Construction Phase, which includes BECx activities that occurprior to contract award and the start of construction, and is included in ASHRAEStandard 202 and Guide E2947 as a sub-phase under the “Construction Phase” ofthe BEC
14、x process.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States11.9 The role and responsibilities of the BECxP as defined bythis practice are not intended to supersede or otherwise replacethe contractual obligations reserved specifically fo
15、r the partiesresponsible for the design and construction of a building orstructure, nor the duties that may otherwise be assigned tothose parties by applicable regulatory or statutory law.1.10 This practice is not intended to warrant or otherwiseguarantee the as-built or in-service durability, or bo
16、th, andperformance of enclosure materials, components, systems, andassemblies.1.11 The values stated in SI units are to be regarded asstandard. The values given in parentheses are mathematicalconversions to inch-pound units that are provided for informa-tion only and are not considered standard.1.12
17、 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Docu
18、ments2.1 ASTM Standards:3C423 Test Method for SoundAbsorption and SoundAbsorp-tion Coefficients by the Reverberation Room MethodC510 Test Method for Staining and Color Change of Single-or Multicomponent Joint SealantsC522 Test Method for Airflow Resistance of AcousticalMaterialsC724 Test Method for
19、Acid Resistance of Ceramic Decora-tions on Architectural-Type GlassC732 Test Method forAging Effects ofArtificial Weatheringon Latex SealantsC794 Test Method forAdhesion-in-Peel of Elastomeric JointSealantsC1060 Practice for Thermographic Inspection of InsulationInstallations in Envelope Cavities of
20、 Frame BuildingsC1087 Test Method for Determining Compatibility ofLiquid-Applied Sealants with Accessories Used in Struc-tural Glazing SystemsC1153 Practice for Location of Wet Insulation in RoofingSystems Using Infrared ImagingC1193 Guide for Use of Joint SealantsC1246 Test Method for Effects of He
21、at Aging on WeightLoss, Cracking, and Chalking of Elastomeric SealantsAfter CureC1258 Test Method for Elevated Temperature and HumidityResistance of Vapor Retarders for InsulationC1279 Test Method for Non-Destructive Photoelastic Mea-surement of Edge and Surface Stresses in Annealed,Heat-Strengthene
22、d, and Fully Tempered Flat GlassC1294 Test Method for Compatibility of Insulating GlassEdge Sealants with Liquid-Applied Glazing MaterialsC1371 Test Method for Determination of Emittance ofMaterials Near Room Temperature Using Portable Emis-sometersC1522 Test Method for Extensibility After Heat Agin
23、g ofCold Liquid-Applied Elastomeric Waterproofing Mem-branesC1549 Test Method for Determination of Solar ReflectanceNearAmbient Temperature Using a Portable Solar Reflec-tometerC1601 Test Method for Field Determination of Water Pen-etration of Masonry Wall SurfacesC1651 Test Method for Measurement o
24、f Roll Wave OpticalDistortion in Heat-Treated Flat GlassC1652 Test Method for Measuring Optical Distortion in FlatGlass Products Using Digital Photography of GridsD2203 Test Method for Staining from SealantsD4541 Test Method for Pull-Off Strength of Coatings UsingPortable Adhesion TestersD5957 Guide
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME28132012E1STANDARDPRACTICEFORBUILDINGENCLOSURECOMMISSIONING 建筑 围护结构 试运行 标准 实践 规程 PDF

链接地址:http://www.mydoc123.com/p-531931.html