ASTM E1049-1985(2011)e1 4375 Standard Practices for Cycle Counting in Fatigue Analysis《疲劳分析周期计算的标准操作规程》.pdf
《ASTM E1049-1985(2011)e1 4375 Standard Practices for Cycle Counting in Fatigue Analysis《疲劳分析周期计算的标准操作规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E1049-1985(2011)e1 4375 Standard Practices for Cycle Counting in Fatigue Analysis《疲劳分析周期计算的标准操作规程》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E1049 85 (Reapproved 2011)1Standard Practices forCycle Counting in Fatigue Analysis1This standard is issued under the fixed designation E1049; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEReference (12) was editorially corrected in October 2011.1. Scope1.1 These practices are a compilation of acceptable proce-dures for cycle-c
3、ounting methods employed in fatigue analysis.This standard does not intend to recommend a particularmethod.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety a
4、nd health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E912 Definitions of Terms Relating to Fatigue Loading33. Terminology3.1 Definitions:3.1.1 constant amplitude loadingin fatigue loading,aloading in which all of the p
5、eak loads are equal and all of thevalley loads are equal.3.1.2 cyclein fatigue loading, under constant amplitudeloading, the load variation from the minimum to the maximumand then to the minimum load.NOTE 1In spectrum loading, definition of cycle varies with thecounting method used.3.1.3 mean crossi
6、ngsin fatigue loading, the number oftimes that the load-time history crosses the mean-load levelwith a positive slope (or a negative slope, or both, as specified)during a given length of the history (see Fig. 1).3.1.3.1 DiscussionFor purposes related to cycle counting,a mean crossing may be defined
7、as a crossing of the referenceload level.3.1.4 mean load, Pmin fatigue loading, the algebraicaverage of the maximum and minimum loads in constantamplitude loading, or of individual cycles in spectrum loading,Pm5 Pmax1 Pmin!/2 (1)or the integral average of the instantaneous load values or thealgebrai
8、c average of the peak and valley loads of a spectrumloading history.3.1.5 peakin fatigue loading, the point at which the firstderivative of the load-time history changes from a positive toa negative sign; the point of maximum load in constantamplitude loading (see Fig. 1).3.1.6 rangein fatigue loadi
9、ng, the algebraic differencebetween successive valley and peak loads (positive range orincreasing load range), or between successive peak and valleyloads (negative range or decreasing load range); see Fig. 1.NOTE 2In spectrum loading, range may have a different definition,depending on the counting m
10、ethod used; for example, “overall range” isdefined by the algebraic difference between the largest peak and thesmallest valley of a given load-time history.3.1.6.1 DiscussionIn cycle counting by various methods,it is common to employ ranges between valley and peak loads,or between peak and valley lo
11、ads, which are not necessarilysuccessive events. In these practices, the definition of the word“range” is broadened so that events of this type are alsoincluded.3.1.7 reversalin fatigue loading, the point at which thefirst derivative of the load-time history changes sign (see Fig.1).1These practices
12、 are under the jurisdiction of ASTM Committee E08 on Fatigueand Fracture and are the direct responsibility of Subcommittee E08.04 on StructuralApplications.Current edition approved Oct. 1, 2011. Published October 2011. Originallyapproved in 1985. Last previous edition approved in 2005 as E104985(200
13、5). DOI:10.1520/E1049-85R11E01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn. The last previous
14、edition of this historical standard is referenced onwww.astm.org.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.NOTE 3In constant amplitude loading, a cycle is equal to tworeversals.3.1.8 spectrum loadingin fatigue loading, a loadin
15、g inwhich all of the peak loads are not equal or all of the valleyloads are not equal, or both. (Also known as variable amplitudeloading or irregular loading.)3.1.9 valleyin fatigue loading, the point at which the firstderivative of the load-time history changes from a negative toa positive sign (al
16、so known as trough); the point of minimumload in constant amplitude loading (see Fig. 1).3.2 Definitions of Terms Specific to This Standard:3.2.1 loadused in these practices to denote force, stress,strain, torque, acceleration, deflection, or other parameters ofinterest.3.2.2 reference loadfor spect
17、rum loading, used in thesepractices to denote the loading level that represents a steady-state condition upon which load variations are superimposed.The reference load may be identical to the mean load of thehistory, but this is not required.3.3 For other definitions of terms used in these practices
18、refer to Definitions E912.4. Significance and Use4.1 Cycle counting is used to summarize (often lengthy)irregular load-versus-time histories by providing the number oftimes cycles of various sizes occur. The definition of a cyclevaries with the method of cycle counting. These practices coverthe proc
19、edures used to obtain cycle counts by various methods,including level-crossing counting, peak counting, simple-rangecounting, range-pair counting, and rainflow counting. Cyclecounts can be made for time histories of force, stress, strain,torque, acceleration, deflection, or other loading parameters
20、ofinterest.5. Procedures for Cycle Counting5.1 Level-Crossing Counting:5.1.1 Results of a level-crossing count are shown in Fig.2(a). One count is recorded each time the positive slopedportion of the load exceeds a preset level above the referenceload, and each time the negative sloped portion of th
21、e loadexceeds a preset level below the reference load. Reference loadcrossings are counted on the positive sloped portion of theloading history. It makes no difference whether positive ornegative slope crossings are counted. The distinction is madeonly to reduce the total number of events by a facto
22、r of two.5.1.2 In practice, restrictions on the level-crossing countsare often specified to eliminate small amplitude variationswhich can give rise to a large number of counts. This may beaccomplished by filtering small load excursions prior to cyclecounting. A second method is to make no counts at
23、thereference load and to specify that only one count be madebetween successive crossings of a secondary lower levelassociated with each level above the reference load, or asecondary higher level associated with each level below thereference load. Fig. 2(b) illustrates this second method. Avariation
24、of the second method is to use the same secondarylevel for all counting levels above the reference load, andanother for all levels below the reference load. In this case thelevels are generally not evenly spaced.5.1.3 The most damaging cycle count for fatigue analysis isderived from the level-crossi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME104919852011E14375STANDARDPRACTICESFORCYCLECOUNTINGINFATIGUEANALYSIS 疲劳 分析 周期 计算 标准 操作规程 PDF

链接地址:http://www.mydoc123.com/p-527818.html