ASTM D6725-2004 Standard Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers《未固结含水土层里预制的滤网式监测井的直推式安装的标准实施规程》.pdf
《ASTM D6725-2004 Standard Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers《未固结含水土层里预制的滤网式监测井的直推式安装的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6725-2004 Standard Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers《未固结含水土层里预制的滤网式监测井的直推式安装的标准实施规程》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 6725 04Standard Practice forDirect Push Installation of Prepacked Screen MonitoringWells in Unconsolidated Aquifers1This standard is issued under the fixed designation D 6725; the number immediately following the designation indicates the year oforiginal adoption or, in the case of re
2、vision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice is based on recognized methods by whichdirect push monitoring wells may be designed
3、 and installed forthe purpose of detecting the presence or absence of a contami-nant, and collecting representative ground water quality data.The design standards and installation procedures herein areapplicable to both detection and assessment monitoring pro-grams for facilities.1.2 The recommended
4、 monitoring well design, as presentedin this practice, is based on the assumption that the objective ofthe program is to obtain representative ground water informa-tion and water quality samples from aquifers. Monitoring wellsconstructed following this practice should produce relativelyturbidity-fre
5、e samples for granular aquifer materials rangingfrom gravels to silty sand. Strata having grain sizes smallerthan the recommended design for the smallest diameter filterpack materials should be monitored by alternative monitoringwell designs which are not addressed in this practice.1.3 Direct push p
6、rocedures are not applicable for monitor-ing well installation under all geologic and soil conditions (forexample, installation in bedrock). Other rotary drilling proce-dures are available for penetration of these consolidatedmaterials for well construction purposes (Guide D 5092).Additionally, unde
7、r some geologic conditions it may be appro-priate to install monitoring wells without a filter pack (EPA1991). Guide D 6724 may be referred to for additional infor-mation on these and other methods for the direct pushinstallation of ground water monitoring wells.1.4 The values stated in inch-pound u
8、nits are to be regardedas standard. The values in parentheses are for information only.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices
9、and determine the applica-bility of regulatory limitations prior to use.1.6 This practice offers a set of instructions for performingone or more specific operations. This document cannot replaceeducation or experience and should be used in conjunctionwith professional judgement. Not all aspects of t
10、his practicemay be applicable in all circumstances. This ASTM standard isnot intended to represent or replace the standard of care bywhich the adequacy of a given professional service must bejudged, nor should this document be applied without consid-eration of the projects many unique aspects. The w
11、ord“Standard” in the title of this document means only that thedocument has been approved through the ASTM consensusprocess.2. Referenced Documents2.1 ASTM Standards:2D 1452 Practice for Soil Investigation and Sampling byAuger BoringsD 1587 Practice for Thin-Walled Tube Sampling of Soilsfor Geotechn
12、ical PurposesD 2488 Practice for Description and Identification of SoilsVisual-Manual ProcedureD 3694 Practice for Preparation of Sample Containers andfor Preservation of Organic ConstituentsD 4043 Guide for Selection of Aquifer-Test Method inDetermining of Hydraulic Properties by Well TechniquesD 4
13、044 Test Method for (Field Procedure) for InstantaneousChange in Head (Slug Tests) for Determining HydraulicProperties of AquifersD 4104 Test Method for (Analytical Procedure) for Deter-mining Transmissivity of Nonleakey confined aquifers byOver-damped Well Response to Instantaneous Change inHead (S
14、lug Test)D 4448 Guide for Sampling Ground Water MonitoringWellsD 4700 Guide for Soil Sampling from the Vadose ZoneD 5088 Practice for Decontamination of Field EquipmentUsed at Nonradioactive Waste SitesD 5092 Practice for Design and Installation of GroundWater Monitoring Wells in Aquifers1This pract
15、ice is under the jurisdiction of ASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.21 on Ground Water.Current edition approved July 1, 2004. Published July 2004. Originally approvedin 2001. Last previous edition approved in 2001 as D 672501.2For referenced ASTM
16、standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohock
17、en, PA 19428-2959, United States.D 5314 Guide for Soil Gas Monitoring in the Vadose ZoneD 5521 Practice for Development of Ground-Water Moni-toring Wells in Granular AquifersD 5778 Test Method for Performing Electronic FrictionCone and Piezocone Penetration Testing of SoilsD 5781 Guide for Use of Du
18、al-Wall Reverse-CirculationDrilling for Geoenvironmental Exploration and the Instal-lation of Subsurface Water-Quality Monitoring DevicesD 5782 Guide for Use of Direct Air-Rotary Drilling forGeoenvironmental Exploration and the Installation ofSubsurface Water-Quality Monitoring DevicesD 5783 Guide f
19、or Use of Direct Rotary Drilling with WaterBased Drilling Fluid for Geoenvironmental Explorationand the Installation of Subsurface Water-Quality Monitor-ing DevicesD 5784 Guide for Use of Hollow-Stem Augers for Geoen-vironmental Exploration and the Installation of SubsurfaceWater-Quality Monitoring
20、DevicesD 5785 Test Method for (Analytical Procedure) for Deter-mining Transmissivity of Confined NonleakeyAquifers byUnderdamped Well Response to Instantaneous Change inHead (Slug Test)D 5786 Practice for (Field Procedure) for Constant Draw-down Tests in Flowing Wells for Determining HydraulicProper
21、ties of Aquifer SystemsD 5787 Practice for Monitoring Well ProtectionD 5881 Test Method for (Analytical Procedure) Determin-ing Transmissivity of Confined Nonleakey Aquifers byCritically Damped Well Response to InstantaneousChange in Head (Slug)D 5912 Test Method for (Analytical Procedure) Determin-
22、ing Hydraulic Conductivity of an Unconfined Aquifer byOverdamped Well Response to Instantaneous Change inHead (Slug)D 6001 Guide for Direct-Push Water Sampling for Geoen-vironmental InvestigationsD 6282 Guide for Direct Push Soil Sampling for Environ-mental Site CharacterizationsD 6285 Guide for Loc
23、ating Abandoned WellsD 6634 Guide for Selection of Purging and SamplingEquipment for Ground Water Monitoring WellsD 6724 Guide for Installation of Direct Push MonitoringWellsD 6771 Practice for Low-Flow Purging and Sampling forWells and Devices Used for Ground-Water Quality Inves-tigations3. Termino
24、logy3.1 DefinitionsRefer toTerminology D 653 for definitionsof terminology.3.2 Definitions of Terms Specific to This Standard:3.2.1 prepacked screena manufactured well screen that isassembled with a slotted inner casing and an external filtermedia support. The external filter media support may becon
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD67252004STANDARDPRACTICEFORDIRECTPUSHINSTALLATIONOFPREPACKEDSCREENMONITORINGWELLSINUNCONSOLIDATEDAQUIFERS

链接地址:http://www.mydoc123.com/p-523358.html