ASTM D2399-1983(2005) Standard Practice for Selection of Cutback Asphalts《稀释沥青的选择方法》.pdf
《ASTM D2399-1983(2005) Standard Practice for Selection of Cutback Asphalts《稀释沥青的选择方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D2399-1983(2005) Standard Practice for Selection of Cutback Asphalts《稀释沥青的选择方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 2399 83 (Reapproved 2005)Standard Practice forSelection of Cutback Asphalts1This standard is issued under the fixed designation D 2399; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A num
2、ber in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the selection of cutback asphalts ofthe slow, medium, and rapid curing types for various pavingand allied uses. Slow
3、-curing cutback asphalts are also calledroad oils.1.2 The values stated in SI units are to be regarded as thestandard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-pria
4、te safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 2026 Specification for Cutback Asphalt (Slow-CuringType)D 2027 Specification for Cutback Asphalt (Medium-CuringType)D 2028 Specification for Cutback Asp
5、halt (Rapid-CuringType)3. Terminology3.1 Definitions:3.1.1 bitumen-aggregate applicationsthe spraying of liq-uid bitumen on prepared aggregate or pavement surfaces,which subsequently are covered with graded aggregate.3.1.2 bitumen-aggregate mixturea combination of bitumi-nous material and aggregate
6、that is physically mixed bymechanical and thermal means, spread on the job-site, andcompacted.3.1.3 bitumen applicationsthe uses of sprayed bituminouscoatings not involving the use of aggregates. Uses of liquidbitumen in this group are all classed as treatments. (See surfacetreatments.)3.1.4 cold-la
7、id plant mixa mixture of liquid bitumen andmineral aggregate prepared in a central bituminous mixingplant and spread and compacted at the job-site when themixture is at or near ambient temperature.3.1.5 dense-graded aggregateaggregate that is gradedfrom the maximum size down to filler with the objec
8、t ofobtaining a bituminous mix with a controlled void content andhigh stability.3.1.6 dust binder a light application of bituminous mate-rial for the express purpose of laying and bonding loose dust.3.1.7 mixed-in-place (road mix)a bituminous course pro-duced by mixing mineral aggregate and liquid b
9、itumen at thejob-site by means of travel plants, motor graders, drags, orspecial road-mixing equipment. Pavement base and surfaces,mixed in place, may utilize open-graded aggregates (3.1.10),dense-graded aggregates (3.1.5), sand (3.1.15), or sandy soil(3.1.17).3.1.8 mulch treatmenta spray applicatio
10、n of bituminousmaterial used to temporarily stabilize a recently seeded area.The bitumen can also be applied to straw or hay mulch as atie-down.3.1.9 multiple surface treatmenttwo or more surface treat-ments placed one on the other. The maximum aggregate size ofeach successive treatment is usually o
11、ne half that of theprevious one, and the total thickness is about the same as thenominal maximum size aggregate particles of the first course.3.1.10 open-graded aggregateone containing little or nomineral filler and in which the void spaces in the compactedaggregate are relatively large.3.1.11 patch
12、 mixa mixture of bituminous material andmineral aggregate for patching holes, depressions, and dis-tressed areas in existing pavements. These mixes are suitablefor use in relatively small areas, applied at ambient temperatureusing hand-laying and hand-compaction techniques. Thesemixes may be designe
13、d for immediate use or for stock-pilingfor a period of time prior to use.3.1.12 pavement base and surfacesthe lower or underly-ing pavement course atop the subbase or subgrade and the topor wearing course. Cold-laid mixtures that are bound togetherwith liquid bitumens use either open or dense aggreg
14、ategradations.3.1.13 penetration macadama pavement construction us-ing essentially one-size coarse aggregate, which is penetratedin place by a heavy application of high-viscosity bituminous1This practice is under the jurisdiction of ASTM Committee D04 on Road andPaving Materials and is the direct re
15、sponsibility of Subcommittee D04.40 onAsphalt Specifications.Current edition approved Dec. 1, 2005. Published December 2005. Originallyapproved in 1965. Last previous edition approved in 1999 as D 2399 83 (1999).2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Cus
16、tomer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.material. This application is foll
17、owed by an application of asmaller size coarse aggregate (to reduce the void space) then isrolled thoroughly. This procedure is usually followed anothertime with a still smaller coarse aggregate and roller compac-tion.3.1.14 prime coatan application of a low-viscosity bitu-minous material to an abso
18、rptive surface, designed to pen-etrate, bond, and stabilize the existing surface and to promoteadhesion between it and the construction course that follows.3.1.15 sanda clean, mineral aggregate material passing aNo. 4 (4.75-mm) sieve, but only about 5 % passing the No. 200(75-m) sieve.3.1.16 sand se
19、ala thin layer of spray-applied bitumenuniformly covered with sand (see 3.1.15), which waterproofsand improves the texture of a pavement surface.3.1.17 sandy soila material consisting essentially of fineaggregate particles smaller than No. 10 (2.00-mm) sieve andusually containing up to 20 % passing
20、a No. 200 (75-m) sieve.This material usually exhibits plasticity characteristics.3.1.18 single-surface treatmenta single application of bi-tumen to any kind of road surface followed immediately by asingle layer of aggregate of as uniform a size as practicable.The thickness of the treatment is about
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD239919832005STANDARDPRACTICEFORSELECTIONOFCUTBACKASPHALTS 稀释 沥青 选择 方法 PDF

链接地址:http://www.mydoc123.com/p-512810.html