ASTM C359-2008 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《硅酸盐水泥早硬的标准试验方法(灰浆法)》.pdf
《ASTM C359-2008 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《硅酸盐水泥早硬的标准试验方法(灰浆法)》.pdf》由会员分享,可在线阅读,更多相关《ASTM C359-2008 Standard Test Method for Early Stiffening of Hydraulic Cement (Mortar Method)《硅酸盐水泥早硬的标准试验方法(灰浆法)》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 359 08Standard Test Method forEarly Stiffening of Hydraulic Cement (Mortar Method)1This standard is issued under the fixed designation C 359; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、 A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method covers the determination of earlystiffening in hydraulic-cement mortar.1.2 The values stated in SI units are to be
3、 regarded asstandard. The values given in parentheses are mathematicalconversions to inch-pound units that are provided for informa-tion only and are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibil
4、ity of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WarningFreshhydraulic cementitious mixtures are caustic and may causechemical burns to skin and tissue upon prolonged exposure.The use of g
5、loves, protective clothing, and eye protection isrecommended. Wash contact area with copious amounts ofwater after contact. Wash eyes for a minimum of 15 min.Avoidexposure of the body to clothing saturated with the liquid phaseof the unhardened material. Remove contaminated clothingimmediately after
6、 exposure.2)1.4 The text of this standard references notes and footnoteswhich provide explanatory material. These notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.2. Referenced Documents2.1 ASTM Standards:3C 183 Practice for Sampling a
7、nd the Amount of Testing ofHydraulic CementC 185 Test Method for Air Content of Hydraulic CementMortarC 187 Test Method for Normal Consistency of HydraulicCementC 305 Practice for Mechanical Mixing of Hydraulic CementPastes and Mortars of Plastic ConsistencyC 670 Practice for Preparing Precision and
8、 Bias Statementsfor Test Methods for Construction MaterialsC 778 Specification for Standard SandC 1005 Specification for Reference Masses and Devices forDetermining Mass and Volume for Use in the PhysicalTesting of Hydraulic CementsD 1193 Specification for Reagent WaterE 2251 Specification for Liqui
9、d-in-Glass ASTM Thermom-eters with Low-Hazard Precision Liquids3. Terminology3.1 Definitions:3.1.1 early stiffening, nthe early development of stiffnessin the working characteristics of a hydraulic-cement paste,mortar, or concrete; varieties include false set and flash set.3.1.2 false set, nthe earl
10、y development of stiffness in theworking characteristics of a hydraulic-cement paste, mortar, orconcrete without the evolution of much heat, which stiffnesscan be dispelled and plasticity regained by further mixingwithout addition of water; also known as “grab set,” “premature stiffening,” “hesitati
11、on set,” and “rubber set.”3.1.3 flash set, nthe early development of stiffness in theworking characteristics of a hydraulic-cement paste, mortar, orconcrete, usually with the evolution of considerable heat,which stiffness cannot be dispelled nor can the plasticity beregained by further mixing withou
12、t addition of water; alsoknown as “quick set.”4. Summary of Test Method4.1 A mortar is prepared with the cement to be tested, usingspecified quantities of cement, standard sand, and an amount ofwater that will produce a mortar with an initial penetration of46 6 3 mm, using the modified Vicat apparat
13、us. Measurementsof penetration are made at stipulated intervals after the begin-ning of the mixing procedure. Upon completion of the firstseries of penetration measurements, the mortar is returned tothe mixer to be remixed. Following the remix procedure, an1This test method is under the jurisdiction
14、 of ASTM Committee C01 on Cementand is the direct responsibility of Subcommittee C01.30 on Time of Set.Current edition approved June 1, 2008. Published June 2008. Originallyapproved in 1955. Last previous edition approved in 2007 as C 359 07.2Section on Safety, Manual of Cement Testing, Annual Book
15、of ASTMStandards, Vol 04.01.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1*A Summary of Changes section ap
16、pears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.additional penetration, termed the remix penetration, is deter-mined. The report is a tabulation of the penetration measure-ments and the amount of mixi
17、ng water used.5. Significance and Use5.1 The purpose of this test method is to determine thedegree to which a cement mortar develops early stiffening. It isintended for use by those interested in methods for determiningthe potential early stiffening of hydraulic cement.5.2 When used for estimating t
18、he relative tendency of acement to manifest early stiffening, a judgment may be madeby comparing the behavior in the penetration series (see 10.4.1and 10.4.2) and the remix procedure (see 10.4.3) to differen-tiate a relatively less serious and less persistent tendency toearly stiffening (false set)
19、from one that is more persistent and,consequently, more serious (flash set).5.3 Severe false setting in a cement may cause difficultyfrom a placing and handling standpoint, but it is not likely tocause difficulties where concrete is mixed for a longer timethan usual, as usually occurs in transit mix
20、ing, or where it isremixed prior to placing or transporting, in concrete pumpingoperations. It is most likely noticed where concrete is mixedfor a short period of time in stationary mixers and transportedto the forms in non-agitating equipment, as on some pavingjobs, and when concrete is made in an
21、on-site batch plant.5.4 Cements with severe false setting usually requireslightly more mixing water to produce the same consistency,which may result in slightly lower strengths and increaseddrying shrinkage.5.5 Early stiffening resulting from false set is not likely tocause a cement to fail the appl
22、icable time of setting require-ment.5.6 Early stiffening resulting from flash set, depending onseverity, can cause a cement to fail the applicable time ofsetting requirement.6. Apparatus6.1 Vicat Apparatus, conforming to the requirements ofFig. 1 in Test Method C 187, with the following modification
23、s:6.1.1 The 1-mm needle shall be replaced by a mass, suchthat the total mass of the 10-mm plunger, indicator, and addedmass shall be 400 6 0.5 g.6.2 Spoon, conforming to the requirements of Test MethodC 185.6.3 Mixer, Bowl, Paddle, and Scraper, conforming to therequirements of Practice C 305.6.4 Gla
24、ss Graduates, 200 or 250 mL capacity, conformingto the requirements of Specification C 1005.6.5 Masses and Mass Determining Devices, conforming tothe requirements of Specification C 1005. The devices fordetermining mass shall be evaluated for precision and accuracyat a total load of 1000 g.6.6 Therm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC3592008STANDARDTESTMETHODFOREARLYSTIFFENINGOFHYDRAULICCEMENTMORTARMETHOD 硅酸盐水泥 标准 试验 方法 灰浆 PDF

链接地址:http://www.mydoc123.com/p-466360.html