ASTM C1611 C1611M-2009 Standard Test Method for Slump Flow of Self-Consolidating Concrete.pdf
《ASTM C1611 C1611M-2009 Standard Test Method for Slump Flow of Self-Consolidating Concrete.pdf》由会员分享,可在线阅读,更多相关《ASTM C1611 C1611M-2009 Standard Test Method for Slump Flow of Self-Consolidating Concrete.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1611/C 1611M 09Standard Test Method forSlump Flow of Self-Consolidating Concrete1This standard is issued under the fixed designation C 1611/C 1611M; the number immediately following the designation indicates theyear of original adoption or, in the case of revision, the year of last re
2、vision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method covers the determination of slump flowof self-consolidating concrete.1.2 The values stated in either SI uni
3、ts or inch-pound unitsare to be regarded separately as standard. Within the text, theSI units are shown in brackets. The values stated in eachsystem may not be exact equivalents; therefore, each systemshall be used independently of the other. Combining valuesfrom the two systems may result in non-co
4、nformance with thestandard.1.3 The text of this standard references notes and footnotesthat provide explanatory material. These notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.1.4 This standard does not purport to address all of thesa
5、fety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WARNINGFresh hydraulic cementitious mixtures are caustic and maycause c
6、hemical burns to skin and tissue upon prolongedexposure.2)2. Referenced Documents2.1 ASTM Standards:3C 125 Terminology Relating to Concrete and ConcreteAggregatesC 143/C 143M Test Method for Slump of Hydraulic-Cement ConcreteC 172 Practice for Sampling Freshly Mixed ConcreteC 173/C 173M Test Method
7、for Air Content of FreshlyMixed Concrete by the Volumetric MethodC 670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction Materials3. Terminology3.1 For definitions of terms used in this test method, refer toTerminology C 125.3.2 Definitions of Terms Specific to Th
8、is Standard:3.2.1 halo, nan observed cement paste or mortar ring thathas clearly separated from the coarse aggregate, around theoutside circumference of concrete after flowing from the slumpcone.3.2.2 spread, nthe distance of lateral flow of concreteduring the slump-flow test.3.2.3 stability, nthe a
9、bility of a concrete mixture to resistsegregation of the paste from the aggregates.3.2.4 viscosity, nresistance of a material to flow under anapplied shearing stress.4. Summary of Test Method4.1 A sample of freshly mixed concrete is placed in a moldshaped as the frustum of a cone. The concrete is pl
10、aced in onelift without tamping or vibration. The mold is raised, and theconcrete allowed to spread. After spreading ceases, two diam-eters of the concrete mass are measured in approximatelyorthogonal directions, and slump flow is the average of the twodiameters.5. Significance and Use5.1 This test
11、method provides a procedure to determine theslump flow of self-consolidating concrete in the laboratory orthe field.5.2 This test method is used to monitor the consistency offresh, unhardened self-consolidating concrete and its uncon-fined flow potential.5.3 It is difficult to produce self-consolida
12、ting concrete thatis both flowable and nonsegregating using coarse aggregateslarger than 1 in. 25 mm. Therefore, this test method isconsidered applicable to self-consolidating concrete havingcoarse aggregate up to 1 in. 25 mm in size. Appendix X11This test method is under the jurisdiction of ASTM Co
13、mmittee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.47 on Self-Consolidating Concrete.Current edition approved May 1, 2009. Published June 2009. Originallyapproved in 2005. Last previous edition approved in 2005 as C 1611/C 1611M 05.2Section on Safety P
14、recautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol. 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Documen
15、t Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.provides non-mandatory visual rating criteria that may be usedto classify the ability
16、 of a self-consolidating concrete mixtureto resist segregation (stability).5.4 The rate at which the concrete spreads is related to itsviscosity. Appendix X1 provides a non-mandatory procedurethat may be used to provide an indication of relative viscosityof self-consolidating concrete mixtures.6. Ap
17、paratus6.1 MoldThe mold used in this test method shall conformto that described in Test Method C 143/C 143M.6.2 Base PlateThe base plate on which the mold restsshall be nonabsorbent, smooth, rigid, and have a minimumdiameter of 36 in. 915 mm.NOTE 1Field experience and results from the round robin te
18、stprogram have shown that base plates made from sealed/laminatedplywood, acrylic plastic, or steel are suitable for performing this test.6.3 Strike-off BarAs described in Test Method C 173/C 173M.7. Sample7.1 The sample of concrete from which test specimens aremade shall be representative of the ent
19、ire batch. It shall beobtained in accordance with Practice C 172.8. Procedure8.1 The slump-flow test shall be performed on a flat, level,nonabsorbent surface such as a pre-moistened concrete floor ora base plate. The base plate shall be used in conditions wherea flat, level surface is not available,
20、 such as on a constructionjob site. When the base plate is used, position and shim thebase plate so that it is fully supported, flat, and level. Whenperforming the slump flow test for a given study or project, donot change the base plate surface type for the duration of thestudy or project.8.2 Filli
21、ng the Mold: The user has the option of filling themold by following either Procedure A or Procedure B.8.2.1 Filling Procedure A (Upright Mold): Dampen andplace the mold, with the larger opening of the mold facingdown, in the center of a flat, moistened base plate or concretesurface. Firmly hold the
22、 mold in place during filling by theoperator standing on the two foot pieces. From the sample ofconcrete obtained in accordance with Section 7, immediatelyfill the mold in one lift. Slightly overfill the concrete above thetop of the mold.8.2.2 Filling Procedure B (Inverted Mold): Dampen andplace the
23、 mold, with the smaller opening of the mold facingdown, in the center of a flat, moistened base plate or concretesurface. From the sample of concrete obtained in accordancewith Section 7, immediately fill the mold in one lift. Slightlyoverfill the concrete above the top of the mold.NOTE 2During the
24、development of this test method, it was found thatsome of the users preferred to perform the test with the large opening ofthe mold facing down as is performed in Test Method C 143/C 143M. Theprovision of a collar to the top of the mold is useful to reduce theprobability of concrete spilling over th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1611C1611M2009STANDARDTESTMETHODFORSLUMPFLOWOFSELFCONSOLIDATINGCONCRETEPDF

链接地址:http://www.mydoc123.com/p-465293.html