ASTM C1320-2010(2016) Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《安装用于轻型框架结构的矿物纤维棉絮和毛毯保温的标准实施规程》.pdf
《ASTM C1320-2010(2016) Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《安装用于轻型框架结构的矿物纤维棉絮和毛毯保温的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1320-2010(2016) Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction《安装用于轻型框架结构的矿物纤维棉絮和毛毯保温的标准实施规程》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1320 10 (Reapproved 2016)Standard Practice forInstallation of Mineral Fiber Batt and Blanket ThermalInsulation for Light Frame Construction1This standard is issued under the fixed designation C1320; the number immediately following the designation indicates the year oforiginal adoption
2、 or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for the installation ofmineral fiber batt an
3、d blanket thermal insulation in ceilings,attics, floors, and walls of new or existing housing and otherlight frame construction.1.2 This practice covers the installation process from pre-installation inspection through post-installation inspection. Itdoes not cover the production of the insulation m
4、aterials.1.3 This practice is not intended to replace installationinstructions by manufacturers, but it shall be used in conjunc-tion with such instructions. This practice is not intended tosupersede local, state, or federal codes.1.4 This practice assumes that the installer possesses aworking knowl
5、edge of applicable codes and regulations, safetypractices, tools, equipment, and methods necessary for theinstallation of thermal insulation materials. It also assumes thatthe installer understands the fundamentals of construction thataffect the installation of insulation.1.5 The values stated in in
6、ch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is
7、theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C168 Terminology Relating to Thermal InsulationC665 Specification for Mineral-Fiber
8、Blanket Thermal Insu-lation for Light Frame Construction and ManufacturedHousingC755 Practice for Selection of Water Vapor Retarders forThermal InsulationD3833/D3833M Test Method for Water Vapor Transmissionof Pressure-Sensitive TapesE84 Test Method for Surface Burning Characteristics ofBuilding Mat
9、erials2.2 Other Standards:NFPA-31 Standard for the Installation of Oil BurningEquipment3NFPA-54 National Fuel Gas Code3NFPA-70 National Electric Code3NFPA-211 Standard for Chimneys, Fireplaces,Vents andSolid-Fuel Burning Appliances3ICC International Residential Code4CPSC Product Safety Fact Sheet No
10、. 518 “The HomeElectrical System”53. Terminology3.1 DefinitionsDefinitions relating to thermal insulationin Terminology C168 apply to terms used in this practice.3.2 Description of Terms Specific to This Standard:3.2.1 conditioned spacespace in a building that is servedby a heating or cooling system
11、.3.2.2 installerthe person or persons who apply thermalinsulation materials in buildings whether or not such person orpersons have contracted with the owner to perform the work.3.2.3 mineral fiber batt and blanket thermal insulatingmaterialsthose materials that meet the minimum require-ments set for
12、th in Specification C665.3.2.4 ownerthe person, partnership, corporation, agency,or other entity who owns the building to be insulated whethersuch ownership is by virtue of deed, contract, or any other1This practice is under the jurisdiction of ASTM Committee C16 on ThermalInsulation and is the dire
13、ct responsibility of Subcommittee C16.23 on Blanket andLoose Fill Insulation.Current edition approved March 1, 2016. Published March 2016. Originallyapproved in 1995. Last previous edition approved in 2010 as C1320 10. DOI:10.1520/C1320-10R16.2For referenced ASTM standards, visit the ASTM website, w
14、ww.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from National Fire Protection Association (NFPA), 1 BatterymarchPark, Quincy, MA 02169-7471, http:/www.nfpa
15、.org.4Available from International Code Council (ICC), 500 New Jersey Ave., NW,6th Floor, Washington, DC 20001-2070, http:/www.iccsafe.org.5Available from U.S. Consumer Product Safety Commission (CPSC), 4330 EastWest Hwy., Bethesda, MD 20814, http:/www.cpsc.gov.Copyright ASTM International, 100 Barr
16、 Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1instrument for acquiring legal title under the laws of the Statein which the building is located.3.2.5 vapor retardermembrane or tape that has a watervapor permeance (perm) rating of 1 perm (5.7 1011kgPa1s1m2) or less as def
17、ined in Practice C755 or TestMethod D3833/D3833M respectively.4. Significance and Use4.1 This practice recognizes that effectiveness, safety, anddurability of insulation depend not only on the quality of theinsulating materials but also on their proper installation.4.2 This practice provides general
18、 procedures that will helpto ensure installation of insulation in a safe and effectivemanner. It shall be noted that actual conditions in existingbuildings vary greatly and in some cases additional care shallbe taken to ensure effective and safe installation.5. Safety Precautions5.1 The installer sh
19、all wear proper clothing and equipmentas recommended by the insulation manufacturer.5.2 In areas where insulation is to be installed, componentsof the electrical system shall be in good condition. If there isreason to believe the electrical system is faulty, do not installinsulation in such areas un
20、til the owner has been informed andrepair has been accomplished.NOTE 1The CPSC Product Safety Fact Sheet No. 518 has identifiedthe following signs of electrical deficiencies: lights dimming, fusesblowing, circuit breakers tripping frequently, electrical sparks and “glow-ing” from receptacles, light
21、flickering, and coverplates on switches andoutlets that are warm or hot to the touch.6. Pre-installation Inspection and Preparation6.1 Inspect the roof, walls, ceilings, and attic floors toidentify areas where previous or existing moisture problemshave caused paint peeling, warpage, staining, visibl
22、e fungusgrowth, rotting, or other structural damage. Do not installinsulation in such areas until the owner has been informed andhas certified that these conditions have been corrected and theirsource(s) of moisture eliminated.6.2 Provide proper attic ventilation in accordance with localbuilding req
23、uirements or practices, such as the ICC Interna-tional Residential Code.6.3 When the attic has soffit vents at the eaves, makeprovisions to prevent insulation from blocking the vents andrestricting attic ventilation.6.4 Where insulation is to be installed beneath floors overcrawl spaces or on crawl
24、space walls, cover the ground surfacewith a vapor retarder.6.5 Provide proper crawl space ventilation in accordancewith local building requirements or practices, such as the ICCInternational Residential Code.6.6 Inspect attic floors for openings that might permitentrance of air from conditioned spac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC132020102016STANDARDPRACTICEFORINSTALLATIONOFMINERALFIBERBATTANDBLANKETTHERMALINSULATIONFORLIGHTFRAMECONSTRUCTION

链接地址:http://www.mydoc123.com/p-464217.html