ASME OM-2012 Operation and Maintenance of Nuclear Power Plants (OM - 2012)《核电厂操作和维护规程》.pdf
《ASME OM-2012 Operation and Maintenance of Nuclear Power Plants (OM - 2012)《核电厂操作和维护规程》.pdf》由会员分享,可在线阅读,更多相关《ASME OM-2012 Operation and Maintenance of Nuclear Power Plants (OM - 2012)《核电厂操作和维护规程》.pdf(524页珍藏版)》请在麦多课文档分享上搜索。
1、Operation and Maintenance of Nuclear Power PlantsAN AMERICAN NATIONAL STANDARDASME OM-2012(Revision of ASME OM-2009)ASME OM-2012(Revision of ASME OM-2009)Operation andMaintenance ofNuclear PowerPlantsAN AMERICAN NATIONAL STANDARDTwo Park Avenue New York, NY 10016 USADate of Issuance: April 8, 2013Th
2、e next edition of this Code is scheduled for publication in 2015.ASME issues written replies to inquiries concerning interpretations of technical aspects of this Code.Periodically certain actions of the ASME OM Committee may be published as Code Cases. CodeCases and interpretations are published on
3、the ASME Web site under the Committee Pages athttp:/cstools.asme.org/ as they are issued.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and stan
4、dards. Such errata shall be used on the date posted.The Committee Pages can be found at http:/cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee P
5、age after selecting “Errata” in the “PublicationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that a
6、pproved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, aca
7、demia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document,
8、and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement
9、 of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this docum
10、ent issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The Am
11、erican Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990Copyright 2013 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTS(A Detailed Contents Precedes Each Division)Foreword ivPreparation of Technical Inquiries vCommittee Roster . viiPref
12、ace ixSummary of Changes xiDivision 1 OM Code: Section IST . 1Division 2 OM Standards 109Division 3 OM Guides . 309iiiFOREWORDThis document was developed and is maintained by the ASME Committee on Operation andMaintenance (OM Committee) of Nuclear Power Plants. The Committee operates under proce-dur
13、esaccreditedbytheAmericanNationalStandardsInstituteasmeetingthecriteriaofconsensusprocedures for American National Standards.Due to the additional time required to consolidate the OM Code and OM-S/G documents, the2009 edition encompasses all material that would have been included in the 2007 edition
14、, 2008addenda, and 2009 addenda.The 2012 edition of Operation and Maintenance of Nuclear Power Plants includes revisions tovarious sections of Division 1, along with the addition of Mandatory Appendix V. Approvedcode cases and interpretations have also been added.The OM Committee develops, revises,
15、and maintains Codes, Standards, and Guides applicableto the safe and reliable operation and maintenance of nuclear power plants.This publication, the 2012 edition of Operation and Maintenance of Nuclear Power Plants, wasapproved by the ASME Board on Nuclear Codes and Standards. ASME OM-2012 was appr
16、ovedby the American National Standards Institute on December 21, 2012.ivPREPARATION OF TECHNICAL INQUIRIESTO THE COMMITTEE ON OPERATIONAND MAINTENANCE OF NUCLEAR POWER PLANTSINTRODUCTIONThe ASME Committee on Operation and Maintenance of Nuclear Power Plants meets regularlyto conduct standards develo
17、pment business. This includes consideration of written requests forinterpretations, Code Cases, and revisions to Operation and Maintenance Code and developmentof new requirements as dictated by technological development. This supplement provides guid-ancetoCodeusersforsubmittingtechnicalinquiriestot
18、heCommittee.TechnicalinquiriesincluderequestsforrevisionsoradditionstotheCoderequirements,requestsforCodeCases,andrequestsfor Code interpretations.Code Cases may be issued by the Committee when the need is urgent. Code Cases clarify theintent of existing Code requirements or provide alternative requ
19、irements. Code Cases are writtenas a question and a reply and are usually intended to be incorporated into the Code at a laterdate. Code interpretations provide the meaning of or the intent of existing requirements in theCode and are also presented as a question and reply. Both Code Cases and Code i
20、nterpretationsare published by the Committee.The Code requirements, Code Cases, and Code interpretations established by the Committeeare not to be considered as approving, recommending, certifying, or endorsing any proprietaryor specific design or as limiting in any way the freedom of manufacturers
21、or constructors tochoose any method of design or any form of construction that conforms to the Code requirements.Moreover, ASME does not act as a consultant on specific engineering problems or on thegeneral application or understanding of the Code requirements. If, based on the inquiry informa-tion
22、submitted, it is the opinion of the Committee that the inquirer should seek assistance, theinquiry will be returned with the recommendation that such assistance be obtained.As an alternate to the requirements of this Supplement, members of the Committee and itssubcommittees, subgroups, and working g
23、roups may introduce requests for Code revisions oradditions, Code Cases, and Code interpretations at their respective Committee meetings or maysubmit such requests to the secretary of a subcommittee, subgroup, or working group.AllinquiriesthatdonotprovidetheinformationneededfortheCommitteesfullunder
24、standingwill be returned.INQUIRY FORMATSubmittals to the Committee shall include:(a) Purpose. Specify one of the following:(1) revision of present Code requirement(s)(2) new or additional Code requirement(s)(3) Code Case(4) Code interpretation(b) Background. Provide the information needed for the Co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEOM2012OPERATIONANDMAINTENANCEOFNUCLEARPOWERPLANTSOM2012 核电厂 操作 维护 规程 PDF

链接地址:http://www.mydoc123.com/p-456758.html