1、ASHRAE GUIDELINEASHRAE Guideline 1.1-2007(Supersedes ASHRAE Guideline 1-1996)Approved by the ASHRAE Standards Committee on June 23, 2007, and by the ASHRAE Board of Directorson June 27, 2007. ASHRAE Guidelines are updated on a five-year cycle; the date following the Guideline is the year of approval
2、.The latest edition of an ASHRAE Guideline may be purchased from ASHRAE Customer Service, 1791 TullieCircle, NE, Atlanta, GA 30329-2305. E-mail: ordersashrae.org. Fax: 404-321-5478. Telephone: 404-636-8400 (worldwide) or toll free 1-800-527-4723 (for orders in US and Canada).Copyright 2007 ASHRAE, I
3、nc.ISSN 1049-894XAmerican Society of Heating, Refrigeratingand Air-Conditioning Engineers, Inc.1791 Tullie Circle NE, Atlanta, GA 30329www.ashrae.orgHVAC while other committee members may or may not be ASHRAE members, allmust be technically qualified in the subject area of the Guideline.Development
4、of ASHRAE Guidelines follows procedures similar to those for ASHRAE Standards except that (a) committee balance isdesired but not required, (b) an effort is made to achieve consensus but consensus is not required, (c) Guidelines are not appealable, and(d) Guidelines are not submitted to ANSI for app
5、roval.The Assistant Director of Technology for Standards and Special Projects of ASHRAE should be contacted for:a. interpretation of the contents of this Guideline,b. participation in the next review of the Guideline,c. offering constructive criticism for improving the Guideline, ord. permission to
6、reprint portions of the Guideline.DISCLAIMERASHRAE uses its best efforts to promulgate Standards and Guidelines for the benefit of the public in light of available information andaccepted industry practices. However, ASHRAE does not guarantee, certify, or assure the safety or performance of any prod
7、ucts, components,or systems tested, installed, or operated in accordance with ASHRAEs Standards or Guidelines or that any tests conducted under its Stan-dards or Guidelines will be nonhazardous or free from risk.or Guidelines will be nonhazardous or free from risk.ASHRAE INDUSTRIAL ADVERTISING POLIC
8、Y ON STANDARDSASHRAE Standards and Guidelines are established to assist industry and the public by offering a uniform method of testing for ratingpurposes, by suggesting safe practices in designing and installing equipment, by providing proper definitions of this equipment, and by providingother inf
9、ormation that may serve to guide the industry. The creation of ASHRAE Standards and Guidelines is determined by the need for them,and conformance to them is completely voluntary.In referring to this Standard or Guideline and in marking of equipment and in advertising, no claim shall be made, either
10、stated or implied,that the product has been approved by ASHRAE.ASHRAE Guideline Project Committee 1.1Cognizant TC: TC 7.9, Building CommissioningSPLS Liaison: Robert G. Doerr*Denotes members of voting status when the document was approved for publication.Charles E. Dorgan, Chair* Chad B. DorganJeff
11、J. Traylor, Vice-Chair* Kenneth L. Gillespie, Jr.Walter T. Grondzik, Secretary* Steven F. Hayne*Joseph R. Anderson, Jr.* Earle KennettDavid E. Bornside* Gerald J. Kettler*Thomas E. Cappellin* Michael J. King*Richard B. Casault* Carl N. LawsonJohn P. Castelvecchi* Keshwar B. Ramjattan*Timothy F. Corb
12、ett* Stephen M. UrickCONTENTSASHRAE Guideline 1.1-2007HVAC it is not intended to be a stand-alone document. 3.2 This guideline describes specific details required toproperly implement the commissioning process relative toHVAC gas supply; coalsupply; steam, hot water, and chilled water supply; solaro
13、r wind energy; and similar systems),b. Heat generation (including boilers, furnaces, fuel-firedheaters, auxiliaries, and similar equipment),c. Refrigeration (including chillers, cooling towers, refriger-ant compressors and condensers, heat pumps, and similarequipment),d. HVAC these usuallyinclude (b
14、ut are not limited to):a. Energy supply (including the oil supply; gas supply; coalsupply; steam, hot water, chilled water supply solar orwind energy, and similar systems),b. Heat generation (including boilers, furnaces, fuel-firedheaters, auxiliaries, and similar equipment), c. Refrigeration (inclu
15、ding chillers, cooling towers, refriger-ant compressors and condensers, heat pumps, and similarequipment), 10 ASHRAE Guideline 1.1-2007d. HVAC special exhaust; and similar systems), e. Terminal and package units (including unitary air-condi-tioning, air coils, humidifiers, dehumidifiers, terminalhea
16、t transfer units, energy recovery units, and similarequipment), f. HVAC or that other systems donot interfere with access to the HVAC this could be comfort,energy efficiency, indoor air quality or any of a number ofproject requirements as defined during the Pre-DesignPhase. This can be one or more q
17、uestions.8.2.8 Complete Final Commissioning Process Report.Requirements for the final Commissioning Process Reportare detailed in Guideline 0-2005, Section 8.2.5.8.3 Occupancy and Operations Phase AcceptanceRequirements. The Occupancy and Operations Phase accep-tance requirements are detailed in Gui
18、deline 0-2005, Section8.3.8.4 Occupancy and Operations Phase DocumentationRequirements. The Occupancy and Operations Phase docu-mentation requirements are detailed in Guideline 0-2005,Section 8.4.8.5 Occupancy and Operations Phase Training Require-ments. The commissioning process training requiremen
19、ts forthe Occupancy and Operations Phase are detailed in Guide-line 0-2005, Section 8.5. ASHRAE Guideline 1.1-2007 19INDEX TO ANNEXES Annex AGuide for DevelopingSupplementary Technical Guidelines for the Commissioning Process. Annex A is part of ASHRAE Guideline 0. It is a normativeannex to Guidelin
20、e 0-2005, but is not applicable to any Supple-mentary Technical Guidelines. The purpose of Annex A is toprovide the recommended format and content for the TotalBuilding Commissioning Process supporting technical guide-lines. Annex A in Guideline 0 describes a uniform sequence ofAnnexes for all Suppo
21、rting and Technical CommissioningProcess Guidelines. In general, when a specific Annex topic does not requireadditional information to support Guideline 0, it will be leftblank and it will be noted either that the annex is non-appli-cable, that the Guideline 0 Annex is also applicable to thisguideli
22、ne, or that additional information is not required. Auniform labeling of all Annexes in all Guidelines is requiredwhen complying with Guideline 0-2005, Annex A. This is thereason for labeling some annexes as not applying. For exam-ple, this will assure that Annex G always contains informationon the
23、Commissioning Plan. Annex BCommissioning Process Flowchart Refer to ASHRAE Guideline 0. Annex B is an informativeannex to Guideline 0, and additional information is notrequired for this guideline. The purpose of Annex B(ASHRAE Guideline 0) is to provide an illustration of thegeneral flow of the comm
24、issioning process. Annex CCost and Benefits of theCommissioning Process Refer to ASHRAE Guideline 0-2005. Annex C is an infor-mative annex to Guideline 0, and is also applicable to thisguideline. The purpose of Annex C is to provide a context forthe application of the commissioning process.Annex DCo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEGUIDELINE112007HVACRTECHNICALREQUIREMENTSFORTHECOMMISSIONINGPROCESSHVACR 试车 程序 技术 要求 PDF

链接地址:http://www.mydoc123.com/p-454863.html