1、Page 1 of 4 2012 ASHRAE. All rights reserved. ERRATA SHEET FOR ASHRAE GUIDELINE 1.1-2007 HVAC&R Technical Requirements for the Commissioning Process July 2, 2012 The corrections listed in this errata sheet apply to all copies of ASHRAE Guideline 1.1-2007. The first printing is identified as “86812 P
2、C 6/08” on the outside back cover, the second printing is identified as “Product Code: 86812 8/09”, the third printing is identified as “Product Code: 86812 9/11”. The shaded item has been added since the previously published errata sheet dated November 7, 2011 was distributed. Page Erratum 85 Table
3、 9A. Ductwork: Installation. In Item 1.A.4 of Table 9A change the word “casting” to “casing”. 95 Table 13. Fan Coil Unit, CW & HW: FCU-1. Renumber the items in Item 2.H of Table 13 as follows: H TAB 1 Filters and coils are clean Yes No 2 Motor rotation verified Yes No 3 Motor overloads verified Yes
4、No 4 Motor voltage and amps verified - each phase Yes No 5 Entering and leaving cooling coil air temperature (F) / / 6 Entering and leaving heating coil air temperature (F) / / 7 Entering and leaving chilled water temperature (F) / / 8 Entering and leaving hot water temperature (F) / / 9 Coil flow a
5、nd air/water pressure drops verified - each coil Yes No 98 Table 17. HVAC Piping: Installation. Change Step 3 in the Instructions as follows: (Note: Additions are shown in underline and deletions are shown in strikethrough.) Step 3: Samples of installed piping ductwork will be periodically reviewed
6、to verify compliance. 98 Table 17. HVAC Piping: Installation. In Item 1.A.4 of Table 17 change “close” to “closed. 98 Table 17. HVAC Piping: Installation. Reformat Table 17 with indentation and bolding as shown in the attached. 100 Table 18. VAV Box, Non Fan Powered w/HW Heat: VAV-1. Remove the “Yes
7、” or “No answer in Item 2.F.4 and replace with: 4 Entering and leaving coil water temperatures (F) / / 101 Table 19. Pump, HVAC: P-1. Renumber the items in Item 1.B of Table 19 as follows: B Physical Checks 1 Unit is free from physical damage Yes No 2 All components present Yes No 3 The water openin
8、gs are sealed with plastic plugs Yes No 4 Unit tags affixed Yes No 5 Installation and startup manual provided Yes No 6 Manufacturers ratings readable/accurate Yes No Page 2 of 4 2012 ASHRAE. All rights reserved. 132 Figure S-1 Typical interdisciplinary coordination and ceiling section detail on draw
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEGUIDELINE11ERTA2012HVACRTECHNICALREQUIREMENTSFORTHECOMMISSIONINGPROCESSPDF

链接地址:http://www.mydoc123.com/p-454862.html