ARMY UFGS-46 73 10-2011 FLOATING COVER FOR SLUDGE-DIGESTION TANKS.pdf
《ARMY UFGS-46 73 10-2011 FLOATING COVER FOR SLUDGE-DIGESTION TANKS.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 73 10-2011 FLOATING COVER FOR SLUDGE-DIGESTION TANKS.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 73 10 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 46 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46 7
2、3 10FLOATING COVER FOR SLUDGE-DIGESTION TANKS02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 General Design Requirements1.2.2 Non-Gasholding Floating Cover1.2.3 Gasholding Floating Cover1.2.4 Coordination1.2.5 Structural Design Requirements1.3 SUBMITTALS1.4 QUALIFICATIONS1.5 DELIVERY, S
3、TORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 GENERAL MATERIAL AND EQUIPMENT REQUIREMENTS2.1.1 Standard Products2.1.2 Nameplates2.1.3 Special Tools2.2 FRAME ASSEMBLY2.3 ROOF DECK, WOOD2.4 ROOF DECK, CAST-IN-PLACE CONCRETE2.5 ROOF DECK, PRECAST CONCRETE2.6 ROOF DECK, STEEL2.7 ROOF INSULAT
4、ION2.8 ROOFING2.9 FLASHING2.10 RIM SKIRT FOR GASHOLDING COVERS2.11 WALL GUIDES AND ROLLERS2.12 APPURTENANCES2.12.1 Gas Dome2.12.2 Gas Pipe Housing2.12.3 Drain Sumps and Access Wells2.12.4 Manhole2.12.5 Entrance HatchSECTION 46 73 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking pe
5、rmitted without license from IHS-,-,-2.12.6 Sampling Well2.12.7 Pressure-Vacuum Relief Unit2.13 FABRICATIONPART 3 EXECUTION3.1 EXAMINATION3.2 WELDING3.3 PAINTING3.3.1 Preparation and Application3.3.2 Coating Testing3.3.3 Coating Repair3.4 FIELD ERECTION3.5 FRAMED INSTRUCTIONS3.6 TESTING3.7 MANUFACTU
6、RERS SERVICES3.8 FIELD TRAINING- End of Section Table of Contents -SECTION 46 73 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 73 10 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 46 20
7、 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 73 10FLOATING COVER FOR SLUDGE-DIGESTION TANKS02/11*NOTE: This guide specification covers the requirements for floating cover for sludge-digestion tank.Adhere to UFC 1-300-02 Unified
8、 Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or ins
9、ert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1
10、 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference
11、feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 46 73 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permi
12、tted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent reference
13、d. The publications are referred to within the text by the basic designation only.AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)AISC 325 (2005) Steel Construction ManualANSI/AISC 360 (2005) Specification for Structural Steel BuildingsAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING E
14、NGINEERS (ASHRAE)ASHRAE FUN IP (2009; Errata 2010) Fundamentals Handbook, I-P EditionASHRAE FUN SI (2009; Errata 2010) Fundamentals Handbook, SI EditionAMERICAN WOOD PROTECTION ASSOCIATION (AWPA)AWPA P5 (2009) Standard for Waterborne PreservativesASME INTERNATIONAL (ASME)ASME B31.1 (2010) Power Pipi
15、ngASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing QualificationsASTM INTERNATIONAL (ASTM)ASTM A167 (1999; R 2009) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and StripASTM A36/A36M (2008) Standard Specification for Carbon Structural SteelAS
16、TM B 209 (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and PlateASTM B 209M (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)ASTM B 370 (2009) Standard Specification for Copper Sheet and Strip for Building ConstructionSECTION 46 73 10 Page 4
17、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning1.2 SYSTEM DESCRIPTION1.2.1 General Design Requirements*NOTE: Include only non-gasholding covers or only g
18、asholding covers, not both.*Floating cover shall conform to the general design requirements specified and as shown.1.2.2 Non-Gasholding Floating Cover*NOTE: A ceiling plate serves two functions: first, it submerges floating scum; second, it protects the structural truss assembly from corrosive diges
19、ter contents and gas. However, the ceiling plate may be deleted if its worth does not exceed the cost. Covers with attic space designs will be seal welded to prevent entrance of digester gas into attic space.*The floating cover shall be a rigid steel structure designed to float on the liquid content
20、s of the digestion tank as indicated. The cover shall consist of structural steel radial truss sections arched radial beams with cover plates welded to trusses beams and to each other to form a gas-tight support system for roof, sidewalls, ceiling and appurtenances required for a complete installati
21、on. The ceiling shall be of welded steel plate and shall float on the liquid surface, keeping floatable scum submerged and in contact with actively digesting sludge. The plate shall slope radially upward from a vertical rim plate at the tank wall to a circular gas dome at the center of the tank. The
22、 installed weight of the digester cover and appurtenances, including any necessary concrete ballast, shall be sufficient to provide a static gas pressure of at least _ Pa inches water column. Additional supports shall be provided as required to maintain the stability of the cover when it is subjecte
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4673102011FLOATINGCOVERFORSLUDGEDIGESTIONTANKSPDF

链接地址:http://www.mydoc123.com/p-449802.html