ARMY UFGS-23 25 00-2008 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS《水和机械系统的化学处理》.pdf
《ARMY UFGS-23 25 00-2008 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS《水和机械系统的化学处理》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-23 25 00-2008 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS《水和机械系统的化学处理》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 25 00 (November 2008)-Preparing Activity: USACE SupersedingUFGS-23 25 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONI
2、NGSECTION 23 25 00CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS11/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Safety1.4.2 Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 MAINTENANCEPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 NAMEPLATES2.3 ELECTRICAL W
3、ORK2.4 GAUGES2.5 WATER ANALYSIS2.6 CONDENSER WATER TREATMENT SYSTEMS2.6.1 Condenser Water Limits2.6.2 Glycol Solution2.6.3 Chemical Treatment for Small Systems2.6.4 Chemical Treatment for Large Systems2.6.4.1 General Requirements2.6.4.2 Chemical Feed Pumps and Tanks2.6.4.3 Chemical Injection Assembl
4、y2.6.4.4 Water Meter2.6.4.5 Timers2.6.4.6 Bleed (Blowdown) Line2.6.4.7 Control Panel2.6.4.8 Chemical Piping2.6.4.9 Sequence of Operation2.6.4.10 Test Kits2.7 CHILLED WATER SYSTEM2.7.1 Requirements for Glycol Solution2.7.2 Chilled Water TreatmentSECTION 23 25 00 Page 1Provided by IHSNot for ResaleNo
5、reproduction or networking permitted without license from IHS-,-,-2.7.3 Dual Temperature Systems2.7.4 Chilled Water Test Kits2.8 LOW AND MEDIUM TEMPERATURE HOT WATER BOILERS AND HEAT EXCHANGERS2.8.1 Chemical Feeder2.8.2 Water Softening System2.8.3 Low and Medium Temperature Hot Water Treatment2.8.4
6、Dual Temperature Systems2.8.5 Test Kit Requirements2.9 HIGH TEMPERATURE HOT WATER BOILERS2.9.1 Chemical Feeder Unit2.9.2 Pumps and Tanks2.9.3 Water Softening System2.9.4 Treated Water Limits2.10 Test Kit2.11 STEAM BOILER WATER TREATMENT2.11.1 Boiler Water Limits2.11.2 Water Softening System2.11.3 Bo
7、iler Water Treatment System2.11.4 Steam Boiler Chemical Feed Pumps and Tanks2.11.5 Steam Boiler Chemical Injection Assemblies2.11.6 Steam Boiler Water Meter2.11.7 Steam Boiler Timers2.11.8 Steam Boiler Control Panel2.11.9 Boiler Blowdown2.11.10 Boiler Chemical Piping2.11.11 Boiler Test Kits2.12 SUPP
8、LEMENTAL COMPONENTS/SERVICESPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 PIPING3.4 TRAINING COURSE3.5 TESTS3.5.1 Condenser Water Quality Tests3.5.1.1 Small Systems (weekly)3.5.1.2 Tests for Large Systems (daily)3.5.2 Chilled Water Testing (monthly)3.5.3 Hot Water Boiler Water Quality Testing3.
9、5.3.1 Low and Medium Temperature Systems (monthly)3.5.3.2 High Temperature Hot Water Systems (daily)3.5.4 Steam Boiler Water Testing3.5.4.1 Small Steam Systems3.5.4.2 Medium Steam Systems (twice weekly)3.5.4.3 Large Steam Systems (daily)3.5.5 Quality Assurance Testing3.5.5.1 Condenser Water Quality
10、Assurance Tests3.5.5.2 Chilled Water Quality Assurance Testing (quarterly)3.5.5.3 Hot Water Boiler Water Quality Assurance Testing3.5.5.4 Steam Boiler Water Quality Assurance Tests3.5.6 Corrosion Testers3.6 INSPECTIONS3.6.1 Inspection General Requirements3.6.2 Boiler/Piping Test- End of Section Tabl
11、e of Contents -SECTION 23 25 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 25 00 (November 2008)-Preparing Activity: USACE SupersedingUFGS-23 25 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS
12、References are in agreement with UMRL dated October 2008*SECTION 23 25 00CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS11/08*NOTE: This guide specification covers the requirements for chemical treatment of water for mechanical systems.Edit this guide specification for project specific requiremen
13、ts by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and
14、 should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES
15、*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature whe
16、n you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 23 25 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
17、HS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publ
18、ications are referred to within the text by the basic designation only.ASME INTERNATIONAL (ASME)ASME B40.100 (2005) Pressure Gauges and Gauge AttachmentsASTM INTERNATIONAL (ASTM)ASTM D 1384 (2005e1) Corrosion Test for Engine Coolants in GlasswareASTM D 2688 (2005) Corrosivity of Water in the Absence
19、 of Heat Transfer (Weight Loss Methods)ASTM D 596 (2001; R 2006) Reporting Results of Analysis of WaterNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2003) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA MG 1 (2007) Standard for Motors and GeneratorsU.S. ARMY CORPS OF ENG
20、INEERS (USACE)PWTB 420-49-5 (1998) Industrial Water Treatment ProceduresU.S. DEPARTMENT OF DEFENSE (DOD)UFC 3-230-08A (2004) Water Supply: Water Treatment1.2 SYSTEM DESCRIPTIONThis section covers the provisions and installation procedures necessary for a complete and totally functional water system(
21、s) chemical treatment. Provide and install the system with all necessary System Components, Accessories, Piping Components, and Supplemental Components/Services.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to
22、reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.SECTION 23 25 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A “G” following a submittal item indicates tha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2325002008CHEMICALTREATMENTOFWATERFORMECHANICALSYSTEMS 机械 系统 化学 处理 PDF

链接地址:http://www.mydoc123.com/p-449649.html