1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 11 25 (November 2008)-Preparing Activity: USACE SupersedingUFGS-23 11 23.00 10 (October 2007)UFGS-23 11 23.00 40 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 23 -
2、 HEATING, VENTILATING, AND AIR CONDITIONINGSECTION 23 11 25FACILITY GAS PIPING11/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Gas Facility System and Equipment Operation1.2.2 Gas Facility System Maintenance1.2.3 Gas Facility Equipment Maintenance1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1
3、Welding Qualifications1.4.2 Jointing Thermoplastic and Fiberglass Piping1.4.3 Shop Drawings1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.2 GAS PIPING SYSTEM AND FITTINGS2.2.1 Steel Pipe, Joints, and Fittings2.2.2 Aluminum Alloy Pipe and Tubing, Joints, and Fittings2.
4、2.3 Copper Tubing, Joints and Fittings2.2.4 Steel Tubing, Joints and Fittings2.2.5 Thermoplastic Pipe, Tubing, Joints, and Fittings2.2.6 Fiberglass Pipe, Joints, and Fittings2.2.7 Sealants for Steel Pipe Threaded Joints2.2.8 Warning and Identification2.2.9 Flange Gaskets2.2.10 Pipe Threads2.2.11 Esc
5、utcheons2.2.12 Gas Transition Fittings2.2.13 Insulating Pipe Joints2.2.13.1 Insulating Joint Material2.2.13.2 Threaded Pipe Joints2.2.13.3 Flanged Pipe Joints2.2.14 Flexible ConnectorsSECTION 23 11 25 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
6、-,-,-2.3 VALVES2.3.1 Valves 50 mm 2 Inches and Smaller2.3.2 Valves 65 mm 2-1/2 Inches and Larger2.4 RISERS2.5 PIPE HANGERS AND SUPPORTS2.6 METERING, REGULATORS AND SHUTOFF VALVES2.7 SEISMIC PROVISIONS2.8 LIQUIFIED PETROLEUM GAS - (LPG), LPG CONTAINERS AND ACCESSORIESPART 3 EXECUTION3.1 EXAMINATION3.
7、2 EXCAVATION AND BACKFILLING3.3 GAS PIPING SYSTEM3.3.1 Protection and Cleaning of Materials and Components3.3.2 Workmanship and Defects3.4 PROTECTIVE COVERING3.4.1 Underground Metallic Pipe3.4.2 Aboveground Metallic Piping Systems3.4.2.1 Ferrous Surfaces3.4.2.2 Nonferrous Surfaces3.5 INSTALLATION3.5
8、.1 Metallic Piping Installation3.5.2 Metallic Tubing Installation3.5.3 Thermoplastic and Fiberglass Piping, Tubing, and Fittings3.5.4 Connections Between Metallic and Plastic Piping3.5.5 Piping Buried Under Buildings3.5.6 Concealed Piping in Buildings3.5.6.1 Piping in Partitions3.5.6.2 Piping in Flo
9、ors3.5.7 Aboveground Piping3.5.8 Final Gas Connections3.5.9 Seismic Requirements3.6 PIPE JOINTS3.6.1 Threaded Metallic Joints3.6.2 Welded Metallic Joints3.6.3 Thermoplastic and Fiberglass Joints3.6.4 Flared Metallic Tubing Joints3.6.5 Solder or Brazed Joints3.6.6 Joining Thermoplastic or Fiberglass
10、to Metallic Piping or Tubing3.6.7 Press Connections3.7 PIPE SLEEVES3.8 PIPES PENETRATING WATERPROOFING MEMBRANES3.9 FIRE SEAL3.10 ESCUTCHEONS3.11 SPECIAL REQUIREMENTS3.12 BUILDING STRUCTURE3.13 PIPING SYSTEM SUPPORTS3.14 ELECTRICAL BONDING AND GROUNDING3.15 SHUTOFF VALVE3.16 CATHODIC PROTECTION3.17
11、TESTING3.17.1 Pressure Tests3.17.2 Pressure Tests for Liquified Petroleum Gas3.17.3 Test With Gas3.17.4 Purging3.17.5 Labor, Materials and Equipment3.18 PIPE COLOR CODE MARKINGSECTION 23 11 25 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- En
12、d of Section Table of Contents -SECTION 23 11 25 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 11 25 (November 2008)-Preparing Activity: USACE SupersedingUFGS-23 11 23.00 10 (October 2007)UFGS-23 11 23.
13、00 40 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 23 11 25FACILITY GAS PIPING11/08*NOTE: This guide specification covers the requirements for low pressure facility gas piping systems conforming to NFPA 54/ANSI Z223.14 NFPA 58 f
14、or non-industrial uses.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brack
15、ets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS
16、should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for Natural Gas (NG) and Liquid Petroleum Gas (LPG) facility piping systems. Selection or deselection of a tailoring option (select view-tailoring options) will include or exclude that option i
17、n the section. Specific project editing is still required for the resulting section.*PART 1 GENERAL*NOTE: This guide specification is intended for use when specifying the following facility gas distribution systems:SECTION 23 11 25 Page 4Provided by IHSNot for ResaleNo reproduction or networking per
18、mitted without license from IHS-,-,-low pressure natural gas systems, 34 kPa (5 psi) maximum, except for gas-air mixtures within the flammable range are limited to 69 kPa (10 psi) maximum,low pressure undiluted LPG systems, 140 kPa (20psi) maximum,aboveground steel piping both outside (up to 1.50 me
19、ters (5 feet) beyond exterior walls) and within buildings in compliance with NFPA 54/ANSI Z223.14 NFPA 58, “Fuel Gas Piping“,thermoplastic gas pressure pipe, tubing, and fittings,aluminum and aluminum-alloy drawn seamless tubes,reinforced epoxy resin gas pressure pipe and fittings,for non-industrial
20、 uses.Use Section 33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION for external utility (beyond 1.50 meters (5 feet) from exterior walls) natural gas distribution liquid petroleum gas (LPG)(includes tailoring for LPG systems).Use Section 33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTI
21、ON contains tailoring for utility metering systems. (The Energy Independence and Security Act (EISA 2007) requires equivalent metering of natural gas and steam in accordance with the guidelines established under the act prior to October 1, 2016.)As a minimum, show the following information on the pr
22、oject drawings:1. Layout and location of piping,2. Location of appurtenances, valves, etc,3. Details of method of mounting piping,4. Capacity of pressure regulators5. Meter location and emergency shut-offs.6. Location and capacity of LP gas containers.*1.1 REFERENCES*NOTE: This paragraph is used to
23、list the publications cited in the text of the guide specification. The publications are referred to in SECTION 23 11 25 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the text by basic designation only and listed in this paragraph by organiza
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2311252008FACILITYGASPIPING 煤气管道 设施 PDF

链接地址:http://www.mydoc123.com/p-449648.html