1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 07 00 (February 2013)-Preparing Activity: USACE SupersedingUFGS-23 07 00 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITION
2、INGSECTION 23 07 00THERMAL INSULATION FOR MECHANICAL SYSTEMS02/13PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 General1.2.2 Recycled Materials1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Installer Qualification1.4.2 Sustainable Design Certification1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PROD
3、UCTS2.1 STANDARD PRODUCTS2.1.1 Insulation System2.1.2 Surface Burning Characteristics2.2 MATERIALS2.2.1 Adhesives2.2.1.1 Acoustical Lining Insulation Adhesive2.2.1.2 Mineral Fiber Insulation Cement2.2.1.3 Lagging Adhesive2.2.1.4 Contact Adhesive2.2.2 Caulking2.2.3 Corner Angles2.2.4 Fittings2.2.5 Fi
4、nishing Cement2.2.6 Fibrous Glass Cloth and Glass Tape2.2.7 Staples2.2.8 Jackets2.2.8.1 Aluminum Jackets2.2.8.2 Polyvinyl Chloride (PVC) Jackets2.2.8.3 Vapor Barrier/Weatherproofing Jacket2.2.8.4 Vapor Barrier/Vapor Retarder2.2.9 Vapor Retarder Required2.2.9.1 White Vapor Retarder All Service Jacket
5、 (ASJ)SECTION 23 07 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.9.2 Vapor Retarder/Vapor Barrier Mastic Coatings2.2.9.3 Laminated Film Vapor Retarder2.2.9.4 Polyvinylidene Chloride (PVDC) Film Vapor Retarder2.2.9.5 Polyvinylidene Chl
6、oride Vapor Retarder Adhesive Tape2.2.9.6 Vapor Barrier/Weather Barrier2.2.10 Vapor Retarder Not Required2.2.11 Wire2.2.12 Insulation Bands2.2.13 Sealants2.3 PIPE INSULATION SYSTEMS2.3.1 Aboveground Cold Pipeline (-34 to 16 deg. C -30 to 60 deg. F)2.3.2 Aboveground Hot Pipeline (Above 16 deg. C 60 d
7、eg. F)2.3.3 Aboveground Dual Temperature Pipeline2.3.4 Below-ground Pipeline Insulation2.4 DUCT INSULATION SYSTEMS2.4.1 Factory Applied Insulation2.4.1.1 Rigid Insulation2.4.1.2 Blanket Insulation2.4.2 Kitchen Exhaust Ductwork Insulation2.4.3 Acoustical Duct Lining2.4.3.1 General2.4.3.2 Duct Liner2.
8、4.4 Duct Insulation Jackets2.4.4.1 All-Purpose Jacket2.4.4.2 Metal Jackets2.4.4.3 Vapor Barrier/Weatherproofing Jacket2.4.5 Weatherproof Duct Insulation2.5 EQUIPMENT INSULATION SYSTEMSPART 3 EXECUTION3.1 APPLICATION - GENERAL3.1.1 Display Samples3.1.1.1 Pipe Insulation Display Sections3.1.1.2 Duct I
9、nsulation Display Sections3.1.2 Installation3.1.3 Firestopping3.1.4 Painting and Finishing3.1.5 Installation of Flexible Elastomeric Cellular Insulation3.1.5.1 Adhesive Application3.1.5.2 Adhesive Safety Precautions3.1.6 Welding3.1.7 Pipes/Ducts/Equipment That Require Insulation3.2 PIPE INSULATION S
10、YSTEMS INSTALLATION3.2.1 Pipe Insulation3.2.1.1 General3.2.1.2 Pipes Passing Through Walls, Roofs, and Floors3.2.1.3 Pipes Passing Through Hangers3.2.1.4 Flexible Elastomeric Cellular Pipe Insulation3.2.1.5 Pipes in high abuse areas.3.2.1.6 Pipe Insulation Material and Thickness3.2.2 Aboveground Col
11、d Pipelines3.2.2.1 Insulation Material and Thickness3.2.2.2 Factory or Field applied Jacket3.2.2.3 Installing Insulation for Straight Runs Hot and Cold Pipe3.2.2.4 Insulation for Fittings and Accessories3.2.2.5 Optional PVC Fitting Covers3.2.3 Aboveground Hot Pipelines3.2.3.1 General RequirementsSEC
12、TION 23 07 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.3.2 Insulation for Fittings and Accessories3.2.4 Piping Exposed to Weather3.2.4.1 Aluminum Jacket3.2.4.2 Insulation for Fittings3.2.4.3 PVC Jacket3.2.5 Below Ground Pipe Insulati
13、on3.2.5.1 Type of Insulation3.2.5.2 Installation of Below ground Pipe Insulation3.3 DUCT INSULATION SYSTEMS INSTALLATION3.3.1 Duct Insulation Thickness3.3.2 Insulation and Vapor Retarder/Vapor Barrier for Cold Air Duct3.3.2.1 Installation on Concealed Duct3.3.2.2 Installation on Exposed Duct Work3.3
14、.3 Insulation for Warm Air Duct3.3.3.1 Installation on Concealed Duct3.3.3.2 Installation on Exposed Duct3.3.4 Ducts Handling Air for Dual Purpose3.3.5 Insulation for Evaporative Cooling Duct3.3.6 Duct Test Holes3.3.7 Duct Exposed to Weather3.3.7.1 Installation3.3.7.2 Round Duct3.3.7.3 Fittings3.3.7
15、.4 Rectangular Ducts3.3.8 Kitchen Exhaust Duct Insulation3.4 EQUIPMENT INSULATION SYSTEMS INSTALLATION3.4.1 General3.4.2 Insulation for Cold Equipment3.4.2.1 Insulation Type3.4.2.2 Pump Insulation3.4.2.3 Other Equipment3.4.2.4 Vapor Retarder/Vapor Barrier3.4.3 Insulation for Hot Equipment3.4.3.1 Ins
16、ulation3.4.3.2 Insulation of Boiler Stack and Diesel Engine Exhaust Pipe3.4.3.3 Insulation of Pumps3.4.3.4 Other Equipment3.4.4 Equipment Handling Dual Temperature Media3.4.5 Equipment Exposed to Weather3.4.5.1 Installation3.4.5.2 Optional Panels- End of Section Table of Contents -SECTION 23 07 00 P
17、age 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 07 00 (February 2013)-Preparing Activity: USACE SupersedingUFGS-23 07 00 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with
18、 UMRL dated January 2013*SECTION 23 07 00THERMAL INSULATION FOR MECHANICAL SYSTEMS02/13*NOTE: This guide specification covers the requirements for field applied thermal insulation on HVAC and plumbing systems located within, on, under, and adjacent to buildings; above and below ground.Adhere to UFC
19、1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable
20、 items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*P
21、ART 1 GENERAL*NOTE: Show the following information on project drawings:1. Areas where pipe insulation differs from the “Typical;“2. Areas where ductwork is to be internally insulated;3. Areas where metal jackets or 8-ply vapor barrier jacket are to be used on interior piping;4. Pumps to be insulated
22、 and encased in 20 gauge boxes; andSECTION 23 07 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5. Heat exchange temperatures.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2307002013THERMALINSULATIONFORMECHANICALSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-449646.html