ARMY UFGS-22 33 30 00 10-2008 SOLAR WATER HEATING EQUIPMENT《太阳能热水器设备》.pdf
《ARMY UFGS-22 33 30 00 10-2008 SOLAR WATER HEATING EQUIPMENT《太阳能热水器设备》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-22 33 30 00 10-2008 SOLAR WATER HEATING EQUIPMENT《太阳能热水器设备》.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-22 33 30.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-22 33 30.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 22 - PLUMBINGSECTION 22 33 30.00 10S
2、OLAR WATER HEATING EQUIPMENT04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 WELDER QUALIFICATIONS1.5 DELIVERY, STORAGE, AND HANDLING1.6 WARRANTY1.7 SPARE PARTSPART 2 PRODUCTS2.1 GENERAL EQUIPMENT REQUIREMENTS2.1.1 Standard Products2.1.2 Nameplates2.1.3 Identical Items2.1.4 E
3、quipment Guards and Access2.1.5 Special Tools2.2 PIPING SYSTEM2.2.1 Copper Tubing2.2.2 Solder2.2.3 Joints and Fittings for Copper Tubing2.2.4 Flanges2.2.5 Dielectric Waterways and Flanges2.2.6 Bronze Gate, Globe, Angle, and Check Valves2.2.7 Ball Valves2.2.8 Relief Valves, Pressure and Temperature2.
4、2.9 Calibrating Balancing Valves2.2.10 Air Vents2.2.11 Strainers2.2.12 Pressure Gauges2.2.13 Thermometers2.2.14 Pipe Threads2.2.15 Pipe Supports2.2.16 Aluminum Sheets2.2.17 Copper Sheets Copper Alloy 110SECTION 22 33 30.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted
5、 without license from IHS-,-,-2.3 ELECTRICAL WORK2.4 COLLECTOR SUBSYSTEM2.4.1 Solar Collector Construction2.4.2 Absorber Plate and Flow Tubes2.4.3 Cover Glazing2.4.4 Insulation2.4.5 Casing2.4.6 Mounting and Assembly Hardware2.4.7 Solar Collector Performance2.5 Solar Collector Array2.5.1 Net Absorber
6、 Area and Array Layout2.5.2 Piping2.5.3 Supports for Solar Collector Array2.6 STORAGE TANK2.7 TRANSPORT SUBSYSTEM2.7.1 Heat Exchanger2.7.1.1 Plate Heat Exchanger2.7.1.2 Tube-in-Shell Heat Exchanger2.7.2 Pumps2.7.3 Pipe Insulation2.7.4 Expansion Tank2.7.5 Heat Transfer Fluid2.8 CONTROL AND INSTRUMENT
7、ATION SUBSYSTEM2.8.1 Differential Temperature Control Equipment2.8.2 Thermistor Temperature Sensors2.8.3 Sensor and Control Wiring2.8.4 Flowmeters2.8.5 Sight Flow Indicators2.9 PAINTING AND FINISHINGPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Collector Subsystem3.2.1.1 Collector Array3.2.1.
8、2 Array Piping3.2.1.3 Array Support3.2.2 Storage Subsystem3.2.3 Transport Subsystem3.2.3.1 Flow Rates3.2.3.2 Pumps3.2.3.3 Expansion Tank3.2.3.4 Piping, Valves, and Accessories3.2.3.5 Pipe Expansion3.2.3.6 Valves3.2.3.7 Foundations3.2.3.8 Grooved Mechanical Joints3.2.4 Control Subsystem3.2.4.1 Differ
9、ential Temperature Controller3.2.4.2 Sequence of Operation3.3 INSPECTION AND TESTING3.3.1 Inspection3.3.2 Testing Prior to Concealment3.3.2.1 Hydrostatic Test3.3.2.2 Cleaning of Piping3.3.3 Posting Framed Instructions3.3.4 Acceptance Testing and Final Inspection3.3.4.1 As-Built DrawingsSECTION 22 33
10、 30.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.4.2 Final Hydrostatic Test3.3.4.3 System Flushing3.3.4.4 System Filling3.3.4.5 Operational Test3.3.4.6 Control Logic3.3.4.7 Temperature Sensor Diagnostics3.3.4.8 Overall System Opera
11、tions3.4 FIELD TRAINING- End of Section Table of Contents -SECTION 22 33 30.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-22 33 30.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-22 33 3
12、0.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 22 33 30.00 10SOLAR WATER HEATING EQUIPMENT04/08*NOTE: This guide specification covers the requirements for solar domestic and service water heating equipment.Edit this guide s
13、pecification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions
14、 on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change
15、 Request (CCR).*PART 1 GENERAL*NOTE: In accordance with the design guidance presented in UFC 3-440-01, the system is designed around the properties of a particular collector. The designer should indicate the design methodology used on the drawings. This ensures that equipment shown on detail drawing
16、s (if different from the equipment assumed by the designer) is properly sized. It is particularly important for the designer to indicate on the drawings the collector parameters used in the design. Detail drawings returned should also be so noted, particularly if the collector chosen has properties
17、different from those used in the original design. UFC 3-440-01 provides the designer, project manager, and quality SECTION 22 33 30.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-assurance personnel a checklist of required drawings and i
18、nformation called out by this guide specification to appear on the drawings.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organ
19、ization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.Referen
20、ces not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to withi
21、n the text by the basic designation only.AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE 93 (2003; Errata 2003) Methods of Testing to Determine the Thermal Performance of Solar CollectorsAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C606 (2006) Grooved and Shou
22、ldered JointsAMERICAN WELDING SOCIETY (AWS)AWS B2.1 (2005; Errata 2006; Errata 2006) Welding Procedure and Performance QualificationAWS D1.2/D1.2M (2003; Errata 2004) Structural Welding Code - AluminumASME INTERNATIONAL (ASME)ASME B1.20.1 (1983; R 2006) Pipe Threads, General Purpose (Inch)ASME B16.1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS22333000102008SOLARWATERHEATINGEQUIPMENT 太阳能热水器 设备 PDF

链接地址:http://www.mydoc123.com/p-449643.html