1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 53 13 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 53 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 53 13REMEDIATION
2、OF CONTAMINATED SOILS AND SLUDGES BY INCINERATION05/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.1.1 Metering1.1.2 Utilities1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Design Requirements1.3.2 Performance Requirements1.3.3 Site Specific Treatability Studies1.3.4 Auxiliary Fuel System1.3.4.1 Capacity1.
3、3.4.2 Feed Capability1.3.4.3 Secondary Containment1.4 SEQUENCING AND SCHEDULING1.4.1 Mobilization1.4.2 Startup Operations1.4.3 Trial Burn and Interim Operations1.4.4 Production Operations1.4.5 Demobilization1.5 SUBMITTALS REQUIREMENTS1.6 SUBMITTALS1.7 QUALITY ASSURANCE1.7.1 Emission Criteria1.7.2 Sl
4、agging Control1.7.3 Air Supply and Pollution Control systems1.7.3.1 Combustion Air1.7.3.2 Induced Draft Fan1.7.3.3 Fugitive Emissions Control1.7.3.4 Quench1.7.3.5 Stack Emissions Control1.7.3.6 Water and Liquid Waste1.7.4 Process Residuals1.7.4.1 Liquid Wastes1.7.4.2 Solids1.8 ENVIRONMENTAL REQUIREM
5、ENTSSECTION 02 53 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.8.1 Existing Conditions1.8.2 ErectionPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Source of Material2.1.2 Equipment2.1.3 Instrumentation and Controls2.1.4 Control Room2.1
6、.5 Redundancies and Safety Procedures2.1.6 Data2.1.6.1 Copies2.1.6.2 Software Packages2.1.7 Instrumentation, Sensors, Recorders, and Sampling2.1.7.1 Instrumentation2.1.7.2 Stack Emissions Monitoring2.1.7.3 Stack Sampling2.2 ALARM EQUIPMENT2.2.1 Interlocks and Alarms2.2.1.1 Interlocks2.2.1.2 Visible
7、Alarms2.2.1.3 Audible Alarms2.2.1.4 Remote Alarms2.3 CONTAMINATED MATERIAL FEED SYSTEM2.3.1 Support Equipment2.3.2 Capacity2.3.3 Metering2.3.4 Conveyors2.4 TREATED MATERIAL AND ASH SYSTEMS2.4.1 Capacity2.4.2 Segregation of Materials2.4.3 RehydrationPART 3 EXECUTION3.1 LAYOUT3.1.1 Excavation and Stoc
8、kpiling3.1.2 Fuel System3.2 INSTALLATION/ERECTION/REMOVAL3.3 SAMPLING, MONITORING AND INSPECTIONS3.3.1 Additional Sampling3.3.2 Minimum Sampling Frequency3.3.2.1 Contaminated Material3.3.2.2 Treated Material3.3.2.3 Fly Ash3.3.3 Contaminated Material Sampling3.3.4 Treated Material and Fly Ash Samplin
9、g3.3.5 Stack Sampling3.3.6 Monitoring3.3.7 Visual Inspections3.3.8 Interlocks, Automatic Cut-Offs and Alarms3.4 DATA3.5 STARTUP OPERATIONS3.6 UNCONTAMINATED MATERIAL OPERATION3.6.1 Material Handling Demonstration3.6.2 Instrumentation Calibration3.6.3 Control Interlock Demonstration3.6.4 Hot CheckSEC
10、TION 02 53 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6.5 24-Hour Continuous Operation3.7 CONTAMINATED MATERIAL OPERATION3.7.1 Shakedown3.7.2 72 Consecutive Hours of Operation3.7.3 Reporting3.8 MINI-BURN3.8.1 Operating Conditions3.8.2
11、 Reporting3.9 PRETRIAL BURN3.9.1 Pretrial Burn Results3.9.2 Pretrial Burn Operations3.9.3 Initial Trial Burn Attempt3.9.4 Time Extension3.10 TRIAL BURN3.10.1 Schedule3.10.2 Operating Conditions3.10.3 Trial Burn Report3.10.3.1 Quantitative Analysis of the Materials3.10.3.2 Quantitative Analysis of th
12、e Stack Gases3.10.3.3 Material and Energy Balances3.10.3.4 Fugitive Emissions3.10.3.5 Continuous Measurement and Recording3.10.3.6 Other Requirements3.11 TRIAL BURN APPROVAL3.11.1 Failure3.11.2 Second and Third Trial Burns3.11.3 Successful Trial Burns3.11.4 Default3.11.5 Multiple Incineration Units3
13、.12 INTERIM OPERATIONS3.12.1 Mass Feed Rate3.12.2 Primary Chamber3.12.3 Secondary Combustion Chamber3.12.4 Air Pollution Control System3.12.5 Sampling and Analysis3.13 PRODUCTION OPERATIONS3.13.1 Schedule3.13.2 Requirements3.13.2.1 Startup and Shutdown3.13.2.2 Changes3.13.2.3 Performance3.14 DEMOBIL
14、IZATION- End of Section Table of Contents -SECTION 02 53 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 53 13 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 53 13 (April 2006)UNIFIED FACILITI
15、ES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 53 13REMEDIATION OF CONTAMINATED SOILS AND SLUDGES BY INCINERATION05/10*NOTE: This guide specification covers the requirements for onsite incineration of non-radioactive materials contaminated by hazardous or to
16、xic organic wastes.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets
17、are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS shou
18、ld be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This performance specification does not specify the capacity of the incinerator. The Contractor determines the capacity of a transportable incineration system (TIS) required to meet the schedule. The Contractor should be allowe
19、d to use an existing, proven incinerator that has a permit for similar wastes.Disposal of process residuals is not included in this section. Additional treatment of the treated material and/or the fly ash is frequently required to satisfy the toxicity characteristic leachate procedure (TCLP) for met
20、als.SECTION 02 53 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Management of project records is not included in this section. Refer to the appropriate section.*1.1 MEASUREMENT AND PAYMENT*NOTE: The unit price for incineration should be ba
21、sed on site surveys before and after excavation/removal for in-situ volume when soils are being treated. For liquids and sludges, the unit of measure should be weight or volume, depending on the characteristics of the material. Materials requiring retreatment shall be segregated from treated materia
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0253132010REMEDIATIONOFCONTAMINATEDSOILSANDSLUDGESBYINCINERATION 通过 焚化 修复 污染 土壤 淤泥 PDF

链接地址:http://www.mydoc123.com/p-449521.html