ARMY UFGS-02 51 13-2010 PRECIPITATION COAGULATION FLOCCULATION WATER TREATMENT《水处理的沉淀 凝结和絮凝》.pdf
《ARMY UFGS-02 51 13-2010 PRECIPITATION COAGULATION FLOCCULATION WATER TREATMENT《水处理的沉淀 凝结和絮凝》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 51 13-2010 PRECIPITATION COAGULATION FLOCCULATION WATER TREATMENT《水处理的沉淀 凝结和絮凝》.pdf(41页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 51 13 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 51 13 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 51 13PRECIPITAT
2、ION/COAGULATION/FLOCCULATION WATER TREATMENT05/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.2 REFERENCES1.3 P/C/F SYSTEM DESCRIPTION1.3.1 Equalization Unit1.3.2 Oxidation/Reduction Unit1.3.3 Precipitation Unit1.3.4 Coagulation Unit1.3.5 Flocculation Unit1.3.6 Clarification Unit1.3.7 Post-pH Adjustme
3、nt Unit1.3.8 Effluent Holding Unit1.4 PERFORMANCE REQUIREMENTS1.5 RESULTS OF PREVIOUSLY CONDUCTED TREATABILITY STUDIES1.6 UTILITIES1.7 SUBMITTAL REQUIREMENTiS1.8 SUBMITTALS1.9 QUALITY ASSURANCE1.9.1 Regulatory Requirements1.9.2 Qualifications1.10 DELIVERY, STORAGE, AND HANDLING1.11 SITE CONDITIONS1.
4、11.1 Ambient Conditions1.11.2 Existing ConditionsPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 TANKS2.2.1 General Requirements2.2.2 Tank Construction Materials2.2.2.1 Carbon Steel2.2.2.2 Polyethylene2.2.2.3 Stainless Steel2.2.2.4 Structural SteelSECTION 02 51 13 Page 1Provided by IHSNot for ResaleNo repro
5、duction or networking permitted without license from IHS-,-,-2.2.2.5 Fiberglass2.2.3 Corrosion Allowance2.2.4 Shop Fabrication2.2.5 Bolts2.2.6 Gaskets2.2.7 Accessories2.2.7.1 Manholes and Pipe Connections2.2.7.2 Baffles, Weirs, and Overflow Pipes2.2.7.3 Vents2.2.7.4 Ladders and Safety Devices2.2.7.5
6、 Scaffold and Cable Support2.2.7.6 Miscellaneous Tank Accessories2.3 CHEMICAL FEED SYSTEMS2.4 MIXERS2.4.1 Equalization Unit Mixer2.4.2 Precipitation Unit Mixer2.4.3 Coagulation Unit Mixer2.4.4 Flocculation Unit Mixer2.4.5 Effluent Holding Unit Mixer2.5 CLARIFIERS2.5.1 Clarifier Vessel2.5.2 Influent
7、Distribution and Effluent Collection Systems2.5.3 Separator Module2.5.4 Skimmer and Sludge Collection/Thickening Devices2.5.5 Miscellaneous2.6 PIPING/VALVES2.7 PUMPS2.7.1 Water Pumps2.7.2 Chemical Metering Pumps2.7.3 Sludge Pumps2.8 ELECTRICAL WORK2.8.1 General2.8.2 Electric Motors2.9 INSTRUMENTATIO
8、N AND CONTROL2.9.1 pH Monitoring/Control2.9.2 ORP Monitoring/Control2.9.3 Flow Monitoring/Control2.9.4 Level Monitoring/Control2.9.5 Control System2.9.6 Control Panel Enclosures2.10 STRUCTURAL SKIDS2.11 PAINT/COATINGS2.12 INSULATION/HEATING/VENTILATION2.13 NAMEPLATES2.14 SPECIAL TOOLSPART 3 EXECUTIO
9、N3.1 EXAMINATION3.2 INSTALLATION3.2.1 Foundations3.2.2 Excavating, Filling, and Grading3.2.3 Cathodic Protection3.2.4 Welding3.2.5 Erection3.2.6 Field Painting3.2.7 Inspections and Testing3.2.8 Radiographic Inspection and Testing3.3 FIELD QUALITY CONTROLSECTION 02 51 13 Page 2Provided by IHSNot for
10、ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.1 Inspection3.3.2 Tests3.3.3 Manufacturers Service3.4 STARTUP AND OPERATION3.4.1 Hydrostatic Tests3.4.2 Pre-startup Checkout3.4.3 Pre-startup Testing3.4.4 Startup Performance Testing3.4.5 Field Training3.4.6 Operation and
11、 Maintenance Manual Updates3.4.7 System Operation by Contractor3.5 SPARE PARTS- End of Section Table of Contents -SECTION 02 51 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 51 13 (May 2010)-Preparin
12、g Activity: USACE SupersedingUFGS-02 51 13 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 51 13PRECIPITATION/COAGULATION/FLOCCULATION WATER TREATMENT05/10*NOTE: This guide specification covers the requirements for precipitation/
13、coagulation /flocculation (P/C/F) systems with flow rates ranging from 4 to 940 liters (1 to 250 gallons) per minute.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate informatio
14、n.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their or
15、ganization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This Section is intended for specification of PCF unit processes and is specifically applicable for remediation of ground water a
16、nd landfill leachate containing dissolved heavy metals. This guide specification should not be used until thorough, site specific treatability studies (jar testing) have been performed, clearly demonstrating that P/C/F is an appropriate treatment technique that can meet the performance criteria set
17、forth in this Section.*SECTION 02 51 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 MEASUREMENT AND PAYMENTMeasurement and payment requirements shall be as identified in the Payment Schedule of the Bid Form.1.2 REFERENCES*NOTE: This par
18、agraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID
19、 outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when
20、 you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN PETROLEUM INSTITUTE (API)API Std 650 (2008; Addendum 200
21、9) Welded Tanks for Oil StorageAMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)ASCE/SEI 7-05 (2005; R 2006) Minimum Design Loads for Buildings and Other StructuresAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA 10084 (2005) Standard Methods for the Examination of Water and WastewaterAWWA D100 (2005) Welded St
22、eel Tanks for Water StorageAWWA D103 (2009) Factory-Coated Bolted Steel Tanks for Water StorageAMERICAN WELDING SOCIETY (AWS)AWS A2.4 (2007) Standard Symbols for Welding, Brazing and Nondestructive ExaminationSECTION 02 51 13 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0251132010PRECIPITATIONCOAGULATIONFLOCCULATIONWATERTREATMENT 水处理 沉淀 凝结 絮凝 PDF

链接地址:http://www.mydoc123.com/p-449520.html