1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 42 91 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 42 91 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 42 91REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIALS05/10PART 1 GENE
2、RAL1.1 PROJECT DESCRIPTION1.1.1 Dust Control1.1.2 Protection1.1.2.1 Protection of Existing Historic Property1.1.2.2 Protection From the Weather1.1.2.3 Environmental Protection1.2 SUBMITTALS1.3 QUALIFICATIONSPART 2 PRODUCTSPART 3 EXECUTION3.1 SALVAGED ITEMS3.1.1 Site Work3.1.2 Concrete3.1.3 Masonry3.
3、1.4 Metals3.1.5 Wood3.1.6 Thermal and Moisture Protection3.1.7 Doors and Windows3.1.8 Finishes3.1.9 Equipment and Specialty Items3.1.10 Mechanical Equipment3.1.11 Electrical Equipment3.2 RECYCLED MATERIALS3.3 DISPOSITION OF MATERIALS3.3.1 Material Salvaged for the Contractor3.3.2 Items Salvaged for
4、the Government3.3.3 Items Salvaged for the Using Service3.4 CLEAN-UP- End of Section Table of Contents -SECTION 02 42 91 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 42 91 (May 2010)-Preparing Activity
5、: USACE SupersedingUFGS-02 42 91 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 02 42 91REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIALS05/10*NOTE: This guide specification covers the requirements for removal and salvage of historic building materials of historic buildings and structu
6、res.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Com
7、ments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted
8、 as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide specification will be coordinated with the appropriate sections and the drawings, and the bracketed choices will be selected or omitted and the bracketed blank spaces filled in or omitted as required.*1.1 PROJECT DESCRIPTIONThe wor
9、k includes removal and salvage of identified historic items and materials, and removal of resulting rubbish and debris. General demolition of non-historic materials and removal of resulting rubbish and debris shall comply with the requirements of Section 02 41 00 DEMOLITION AND DECONSTRUCTION. Mater
10、ials to be salvaged or recycled shall be stored daily in areas and manner specified by the Contracting Officer. In the SECTION 02 42 91 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-interest of conservation, salvage and recycling shall be pur
11、sued to the maximum extent possible. Submit a Work Plan The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged or recycled, dust control, protection of property which
12、 is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations1.1.1 Dust ControlThe amount of dust result
13、ing from removal, salvage and demolition operations shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water to control dust will not be permitted when it will result in, or create, damag
14、e to existing building materials and hazardous or objectionable conditions such as ice, flooding and pollution.1.1.2 Protection1.1.2.1 Protection of Existing Historic PropertyBefore beginning any removal, salvage or demolition work, the Contractor shall survey the site and examine the drawings and s
15、pecifications to determine the extent of the work. The Contractor shall take necessary precautions to avoid damage to existing historic items that are to remain in place, to be reused, or to remain the property of the Government. Items damaged by the Contractor shall be repaired and restored to orig
16、inal condition, or replaced, as approved by the Contracting Officer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing and supports, as required. The Contractor shall ensure that structural elements are not overloaded and s
17、hall provide additional supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.1.1.2.2 Protection From the WeatherThe interior of buildings to remain and salvageable materials shall be protected from the weather at all times. Salvaged histor
18、ic materials shall be stored out of contact with the ground and under weathertight covering.1.1.2.3 Environmental ProtectionThe work shall comply with the requirements of Section 02 82 14.00 10 ASBESTOS ABATEMENT Section 02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET HOUSING “DO“ for Distr
19、ict Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and N
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0242912010REMOVALANDSALVAGEOFHISTORICBUILDINGMATERIALS 清除 打捞 历史 建筑材料 PDF

链接地址:http://www.mydoc123.com/p-449519.html