ARMY MIL-S-70685-1987 SLIP RING ASSEMBLY《滑动环组装》.pdf
《ARMY MIL-S-70685-1987 SLIP RING ASSEMBLY《滑动环组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-70685-1987 SLIP RING ASSEMBLY《滑动环组装》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-S-70685 LO W 7777706 0356757 O W MIL-S-70685 (AR) 10 February 1987 MILITARY SPECIFICATION SLIP RING ASSEMBLY This Specification is approved for use within the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. 1
2、. SCOPE Beneficial comments (recommendations, additions, deletions) and any pertinent data which-may be of use in improv- ing this document should be addressed to: Commander, U.S. Army Armament, Munitions and Chemical Command, Attn: AMSMC-QA, Douer, New Jersey 07801-5001 by using the self-addressed
3、Standardization Document Improve- ment Proposal (DD Form 1426) appearing at the end of this document or by letter. 1.1 Purpose. This specification establishes performance, test, manufacture, design and acceptance for the slip ring assembly for use in the Vulcan Air Defense System (VADS). 1.2 Item de
4、scription. The slip ring assembly transfers electrical energy from a stationary structure to a rotating structure. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified, the following specifications and standards of the issue listed in that
5、issue of the Department of Defense Index of Specifications and Standards (DODISSI specified in the solicitation form a part of this specification to the extent specified herein. STANDARDS MILITARY MIL-STD-454 - Standard General Requirements for Electronic Equipment AMSC N/A FSC 1005 DISTRIBUTION STA
6、TEMENT A. Approved for public release; distribution is unlimited. - THIS DOCUMENT CONTAINS 9 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-70b85 LO 777790b 035b758 2 R 2.1.2 Other Government documents, drawings and publications. The fo
7、llowing other Government documents, drawings and publications form a part of this specification to the extent specified herein. DRAWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT AND PACKAGING DRAWINGS P8437092 - Packaging Data Sheet 8437092 - Slip Ring Assembly (
8、Copies of specifications, standards and drawings required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specif
9、ication and the referenced specifications cited herein (except for associated detail specifications, specification sheets or MS standards) the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific e
10、xemption has been obtained. 3. REQUIREMENTS 3.1 Physical characteristics. 3.1.1 Weight. The weight of the slip ring assembly shall be no greater than 16 pounds. 3.2 Performance requirements. 3.2.1 Circuit description. 28 circuits shall be provided as follows: a. 24 circuits - 1 ampere, 28V DC. b. 2
11、circuits - 100 amperes resistive load,28V DC. c. 2 circuits - RF. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-70685 LO m 7779706 0356757 Li m MIL-S-70685(AR) 3.2.2 Rotational speed. The slip ring assembly shall be capable of operation at
12、speeds up to 20 RPM. 3.2.3 Breakaway torque. The torque required to initiate movement of the rotor relative to the stator shall not exceed 30 inch-pounds. 3.2.4 Noise. Slip ring noise shall not exceed 400 microvolts at a test current of 50 milliamps during rotation at 20 RPM for each ring pair. with
13、stand a voltage of 500V DC for 10 seconds between each circuit and all other circuits and case ground with no evidence of arcing or breakdown. 3.2.6 Insulation resistance. Insulation resistance between each circuit and all other circuits and case ground shall be not less than 50 megohms at 250V DC.
14、3.2.5 Dielectric strength. The slip ring assembly shall 3.2.7 Circuit resistance. The circuits shall not exceed the following resistances: 1 ampere signal circuits, 110 milliohms; 100 ampere power circuits, 5 milliohms; and RF circuits, 50 milliohms. 3.2.8 Voltage standing wave ratio. The voltage st
15、anding wave ratio of the RF rings shall be 1.40 maximum at frequencies of 30 to 76 megahertz (MHz), slip rings shall be 50db minimum at 30 to 76 MHz. 3.2.9 Crosstalk. Crosstalk drop between channels of RF 3.2.10 Waterproofness. The slip ring assembly shall show no signs of leakage when pressurized i
16、nternally to 3 PSI and submerged in water to a depth of 12 inches from the top of the unit for a period of 5 minutes. 3.3 Design and construction. The slip ring assembly shall be fabricated and assembled in accordance with dwg. 8437092 and associated drawings. 3.3.1 Materials. Materials used in cons
17、truction of the slip ring assembly shall be in accordance with dwg. 8437092 and associated drawings. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-70685 LO 777970b 0356760 O E 3.3.2 Protective coatinq. Protective coating used in constructio
18、n of the slip ring assembly-shall be in accordance with dwg. 8437092 and associated drawings. 3.3.3 Product marking. The slip ring assembly shall be marked in accordance with Dwg. 8437092. Connector designations shall be marked in accordance with dwg. F8437092. 3.3.4 Workmanship. Workmanship shall b
19、e in accordance with MIL-STD-454. 3.5 First article inspection. When specified in the contract or purchase order, a sample shall be subjected to a first article inspection in accordance with the technical provisions herein (see 4.3). 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.
20、 Unless otherwise specified, in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the cohtractor may use his own or any other facilities suitable for t
21、he performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed r
22、equirements. 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspections set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specifica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS706851987SLIPRINGASSEMBLY 滑动 组装 PDF
