ARMY MIL-S-63383-1980 SAFE AND ARMING (NON-HAZARDOUS) ASSEMBLY M718 M741《M718 M741型(无危险)安全和武装装配》.pdf
《ARMY MIL-S-63383-1980 SAFE AND ARMING (NON-HAZARDOUS) ASSEMBLY M718 M741《M718 M741型(无危险)安全和武装装配》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-63383-1980 SAFE AND ARMING (NON-HAZARDOUS) ASSEMBLY M718 M741《M718 M741型(无危险)安全和武装装配》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、- I_ I NIL-S-63383 13 W 7777706 0349411 6 I I MIL+-63383 (AR) 23 June 1980 MILITARY SPECIFICATION . CAFE AND ARMING (CLEARING CHARGE TRAIN) ASSEMBLY FOR MINES, M718/M741 SYSTEM This Specification is approved for use by the U.S. Army Armament Research and Developnent Command, and is available for use
2、 by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 covered by the drawings, and provides Quality Assurance provisions for the assembly of a safe and arming device for mines used in the M718jM741 System ballistic testing. This Specification contains requirements not normally
3、2. APPLICABLE DOCUMENTS 2.1 Issue of documents. The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. f SPECIFICATIONS I FEDERAL . MIL-A-48078 - Ammunition, Standard Quality Assurance
4、MIL-D-48120 - Detonator, Electric: XMlOO; Parts for and MIL-D-63197 - Detonator Delay Electric: PA506; Parts MIL-L-63246 - Lead Assemblies for S Parts for, and Loading, Assembling and Packing. FSC: 1345 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be o
5、f um in improving this document should be addresaed to: Commander, US Amy Armament Research and Development Command, Attn. DRDARQA, Dover, New Jeruey 07801 by wing the 8eIf;addressed Standardization Document Improvement h.oposal (DD Form 1426) appearing at the end of this document or by letter. - c
6、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. I flIL-S-6333 13 a 7797906 0347412 B MIL-S-63383 (AR) STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) MIL-STD-129 - Marking for Shipment and
7、Storage MIL-STD-453 - Inspection, Radiographic DRAWINGS (See 6.7) U.S. ARMY ARMAMENT RESEARCH AND DJZVEZOPMENT COMMAND 9317620 - Safe and Arming (Clearing Charge Train) Assembly 2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless o
8、therwise indicated, the issue in effect on the date of invitation for bids or request for proposal shall apply. CODE OF FEDERAL RM;ULATIONS Title 49 - Transportation, Parts 100-199 I (The Code of Federal Regulations if available from the Superintendent of Documents, U.S. Government Printing Officer,
9、 Washington, DC 20402. Orders should specify ”49 CER 0-190 (lastest revision)”). (Copies of specifications, standards, drawings, and Publications listed above, or in the item detail specification, required by suppliers in connection with specification pYocurement functions, should be obtained from t
10、he procuring activity or as directed by the Contracting Officer). 3. REQUIREMENTS 3.1 Materials. Materials shall be in accordance with the applicable drawings and specifications. 3.2 Parts and assemblies The parts and assemblies shall comply with all requirements specified on drawings listed in para
11、graph 2.1, and associated drawings, and with all requirements specified in applicable specifications and standards. 3.3 examined Radiographic examination. The safe and arming device shall be for a fully non-armed condition in accordance with MIL-STD-453 and 4.5.4 and in accordance to Dwg. 9317620. F
12、urther radiographic requirements shall include clear definition of all explosive components as well as flexible cable assembly and slider lock. Proper explosive loading shall be verified. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-S-63383 1
13、3 m 7779706 0349433 T m 3 MIL-S-63383 (AR) 3.4 Explosive train function. The two (2) detonators, transfer lead and aft ejection charge assembly shall all function high order when the detonators are initiated in accordance with the procedure specified in 4.5.6. 3.4.1 Aft ejection charge assembly (Dwg
14、. 9277858). The aft ejection charge explosive elements shall function causing the propellant to ignite, resulting in a minimum of one hundred and sixty thousandths (0.160) inch deformation in the aluminum test plate at temperatures between minus forty degrees centigrade (-4OOC) to plus sixty degrees
15、 centigrade (+6OoC). 3.5 Detonator short circuit resistance. The resistance of the short circuit across the detonators on the flexible cable shall be less than fifteen thousandth (0.015) ohms when tested in accordance with 4.5.5.2. 3.6 Data requirements. The contractor shall forward copies of the re
16、sults of any of his examinations or tests to the designated address, as required by the contract (See 6.5). 3.7 First article inspection. This specification contains technical provisions for first article inspection. first article samples by the contractor shall be as specified in the contract. Requ
17、irements for the submission of 3.8 Workmanship - parts and assemblies. Parts and assemblies shall be devoid of burrs, chips, dirt, grease, and other foreign matter that may impair proper functioning. The cleaning method used shall not be injurious to any of the parts, nor shall the parts be contamin
18、ated. Exterior surface coatings shall be continuous, except for a few light scratches not exposing base material. (- All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for inspection and standard quality assurance provisions. Unless otherwise s
19、pecified herein, or in the contract, the provisions of MIL-A-48078 shall apply, and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item. i a. First Article Inspection b. Quality Conformane Inspectio
20、n 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article as designated by the Contracting Officer, for evaluation in accordance with the provisions of 4.3.2. items- in sample quantities as indicated: The first article sample shall consist of the following 3 Provid
21、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-63383 13 W 7777906 0347434 1 m/ 7 MIL-S-6 3383 (AR). Part Description guant i ty Drawinq Slider Assembly 9317618 Safe and Arming (Clearing Charge Train) Subassembly 9317620 Cable and Detonator Assembly
22、3277868 Safe and Arming (Clearing Charge Train) Assembly 93176 20 Chamber Assembly 9 27 7986 Aft Ejection Charge Assembly 9277858 Setback Pin Assembly 9317617 10 10 10 35 10 25 10 . I 4.3.2 Inspection to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. See MIL-A-48078. 4
23、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-63383 13 7797706 03q7915 3 9 I . . -. hl b t 4 Y c) I ,_._. 8 _._. _. O ri o O00 r( us-#? O 4 !iqzm O ri .- .-._ . ._. . _- e B t 5 Provided by IHSNot for ResaleNo reproduction or networking permi
24、tted without license from IHS-,-,-? .- O0 O00 O O0 O00 dd rldd ri CI QI C -4 W a B a C a .rl c u) Y 6 8 3 i! a W O QI O 5 ti -LG 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-63383 13 M 9799906 0347437 O A i al u V) a P 3 cn 8 Y c u A JJ ii
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS633831980SAFEANDARMINGNONHAZARDOUSASSEMBLYM718M741M718M741 危险 安全 武装 装配 PDF

链接地址:http://www.mydoc123.com/p-448223.html