ARMY MIL-P-63448 A-1984 PROJECTILE 105MM HEAT-T-MP M456A2 SPIKE AND CAP ASSEMBLY《M456A2式105 mm曳光多用途破甲弹(HEAT-T-MP)用长钉和火帽组合件》.pdf
《ARMY MIL-P-63448 A-1984 PROJECTILE 105MM HEAT-T-MP M456A2 SPIKE AND CAP ASSEMBLY《M456A2式105 mm曳光多用途破甲弹(HEAT-T-MP)用长钉和火帽组合件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63448 A-1984 PROJECTILE 105MM HEAT-T-MP M456A2 SPIKE AND CAP ASSEMBLY《M456A2式105 mm曳光多用途破甲弹(HEAT-T-MP)用长钉和火帽组合件》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-P-63Lt4A 13 7779706 0350737 1 H s-37-ots n MIL-P-6 3448A (AR) 29 Februars 1984 SUPERSEDING MIL-P-63448 (AR) 26 May 1981 1 MILITARY SPECIFICATION PROJECTILE, 105MMf HEAT-T-MP, M456A2 SPIKE AND CAP ASSEMBLY This specification is approved for use by the US Army Armament, Munitions and Chemical Co
2、mmand, and is available for use by al1 Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification contains requirements and provides quality assurance provisions for the fabrication and packing of the spike and cap assembly for HEAT-T-MP, M456A2 Projectile. 2. APPLICABLE
3、DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards, Unless otherwise specified, the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of t
4、his specification to the extent specified herein. SPEC1 FICATIONS MI LI TARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for FEDERAL TT-C- 4 9 O - Cleaning Methods and Pretreatment of Surf aces For Organic Coatings FSC 1315 I 1 Beneficial comments (recommen
5、dations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New J%rsey 07801 by using the self-addressed Standardization Document Improvement Proposal (
6、DD Form 1426) appearing at the end of this document or by letter. THIS DOCUMENT CONTAINS -.ZL PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-6344A L3 b 0350740 W MIL-P-6 3448A (AR) STANDARDS c: MILITARY MIL-STD-105 - Sampling Procedures
7、 and Tables For Inspections By Attributes MIL-STD-1169 - Packaging, Packing and Marking For Shipment of Inert Ammunitions Components 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to
8、 the extent specified herein. DRAWINGS U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 9327312 - Packing and Marking for Box, Fiberboard, 9323913 - Spike 9335940 - Spike and Cap Assembly For Spike and Cap Assembly or Spike Assembly M456A2 (Copies of specifications, standards, handbooks, dr
9、awings, and publica ions required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the Contracting Officer.) 2.2 Other publications. The following documents form a part of this specification to the extent specified
10、herein. Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposal shall apply. ANSI-B46.1 - Surface Texture. (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, New York, NY 10018. ) ASTM Methods
11、 - American Society for Testing and Materials E8 - Tension Testing of Metallic Materials E10 - Brinell Hardness of Metallic Materials, B117 Salt Spray (Fog) Testing Test for 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-6344A 33 W 9949906 0
12、350743 T W - MIL-P-63 4 48A (AR) (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Phila., PA 19103. ) O 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text
13、 of this specification shall take precedence. 3. REQUIREMENTS 3.1 General. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings, referenced specifications and the following: 3.2 Heat treatment or stress relief. The heat treatment or stress relief ap
14、plied shall be uniform throughout each lot of components and shall be so conducted as to produce in each component the mechanical properties specified on the applicable component drawing, 3.2.1 Cold chapinq (if applicable). Cold shaping shall be so accomplished as to produce the required mechanical
15、properties in the metal parts. After cold work, the metal parts shall be stress relieved at the time and temperature specified on the applicable drawing to achieve stress relief and still meet the required mechanical properties. 3.3 Protective coatinq. Protective coating shall be in accordance with
16、the applicable drawings and specifications. When protective coating is required by component details, finish requirements will apply to all indicated surfaces of the component regardless of contour configuration. Salt spray testing shall be in accordance with the applicable drawings. 3.4 Painting. P
17、ainting shall comply with the requirements on the applicable drawings. All paint and marking shall be dry to the touch before testing and packing for shipment. 3.5 Process description and controls. The contractor in accordance with the contract provisions-shall make available a written description o
18、f the specified production process and process controls, determined by the Government as crucial that are to be used in the production of the first-article sample (see paragraph 4.3.4) 3.6 Structural integrity. There shall be no breakup or deformation of the spike during any proving ground test cond
19、ucted. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-6344BA II3 7777906 0350742 II 9 MIL-P-63448A (AR) 3.7 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submiss
20、ion of the first article samples by the contractor shall be as specified in the contract. 3.8 Workmanship. The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.8.1 Metal defects 3.8.1.1 Components. All components, and component
21、cavities I shall be free from cracks, splits, cold shuts, inclusions, pipes, , porosity, bursts, folds, seams, and other metal defects. 3.8.1.2 Component cavities. In addition to 3.8.1.1 all component cavities shall be free of scale, fins, burrs, draw marks, laminations, imbedded foreign matter, pit
22、s, craters, and I sharp edges. 3.8.2 - Burr. No component shall have a burr. 3.8.3 Foreign matter. All parts and assemblies shall be free of dirt, chips, oil, grease, rust, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for inspection and standard quality assura
23、nce provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspections shall be conducted on this item: a. First Article Inspection
24、b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article sample designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the following sample quantities a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP63448A1984PROJECTILE105MMHEATTMPM456A2SPIKEANDCAPASSEMBLYM456A2 105 MM 曳光 多用途 破甲弹 HEATTMP 长钉

链接地址:http://www.mydoc123.com/p-446831.html