1、t MIL-F-b30b 13 7797706 03q3325 5 I MIL-F-63068 (PA) 14 July i976 MILITARY SPECIFICATION FUZE, M539, IMPACT SWITCH ASSEMBLY FOR, PARTS FOR, ASSEMBLING AND PACKING This specification is approved for use by Picatinny Arsenal, Department of the Army, and is available for use by all Departments and Agen
2、cies of the Department of Defense. 1. SCOPE 1.1 This Military Specification covers parts for assembling and packing of Fuze, M539, Impact Switch Assembly, 2. APPLICABLE DOCUMENTS .2*1 The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of
3、 this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 MIL-B-117 MIL-B-3106 MI L-A- 4 8 O 7 8 MIL-1-45607 MIL-F-50449 FEDERAL L-P-378 - Preservation - Packaging, Methods Of - Bag, Sleeve and Tubing - Interior Packaging - Board, Composition, Water-resistant, Solid.(For
4、Filler or Cushioning Pads) - Ammunition, Standard Quality Assurance Provisions, General Specification for - Inspection Equipment, Supgly and Maintenance of - Filler, Sheet Form (For Use In Ammunition Containers) - Plastic Sheet and Strip, Thin Gauge, Polyolefin Provided by IHSNot for ResaleNo reprod
5、uction or networking permitted without license from IHS-,-,-MIL-F-63068 13 E 7779706 0343326 7 W MIL-F-6306.8 (PA) PPP-B-601 - Box, Wood, Cleated Plywood PPP-B-636 - Box, Shipping, Fiberboard STANDARDS MILITARY MIL-STD-1169 - Packaging, Packing And Marking for Shipment of Inert Ammunition Components
6、 DRAWINGS PICATINNY ARSENAL PRODUCT AND PACKAGE DRAWINGS 9276238 - Power Supply, Fuze, M539 9276237 - Impact Switch Assembly, Fuze, M539 9 29 32 88 - Projectile, l52MM, HEAT-T-MP, M409A2, Loading Assembly 9294989 - Cartridge, l52MM, HEAT-T-MP, M409A2 - FRANKFORD ARSENAL 10534412 - Windshield 1053441
7、7 - Insulator Assembly 3. REQUIREMENTS 3.1 General. -Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Impact Switch.,-The impact switch shall comply with all requirements specified on dwg. 9276237 and with allre- quirements specified in applicable specifica
8、tions. 3.3 Workmanship.-All parts and assemblies shall be free of chips, dirt, grease, rust, burrs, cracks and other foreign material. The cleaning methods used shall not be injurious to any of the parts, nor shall the parts be contaminated by the cleaning agents. 3.4 Proving Ground.-The applicable
9、loaded projectile shall comply with the following requirements when assembled with an impact switch and tested-as specified in 4.514. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63068 13 m 7797706 03Li3327 7 m MIL-F-63068 3.4.1 Graze Functi
10、oning.-The projectile shall detonate Ihigh-orderll on initial impact with a gravel pad located 1000 - + 200 meters from the gun muzzle. 3.1i.2 Safety.-There shall be no indication of impact switch separation or breakup in the gun bore or in flight prior to impact. 3.5 First Article Inspection.-This
11、specification con- tains technical provisions for first article inspection. Re- quirements for the submission of first article samples by the contractor shall be as specified in the contract. 4, QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection and Standard Quality Assurance Provisions.
12、-Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. of inspection shall be conducted on this item: 4.2 Classification of Inspections.-The following types a. First Article Inspection b. Quality Confo
13、rmance Inspection 4.3 First Article Inspection 4.3;i Submission.-The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of 10 each of every component and every assembly.
14、 (Where a multiple cavity mold is used in the manufacturing process, a minimum of 5 samples shall be sub- mitted from each mold cavity. Each part shall be identified with its mold cavity). Inspections to be Performed.-The First Article parts submitted in accordance with paragraph 4.3.1 will be subje
15、cted by the Government to all examinations and tests specified in 4.4.2 of this specification and to any or all requirements of the applicable drawings. 5 each of the sample assemblies (2 each if multiple cavity mold is used) shall be temperature conditioned at 1.80 + 10F for 24 + 1 hours and then h
16、eld at room ambient temperature for 4 hours minimum prior to inspection. 4.3.2 4.3.3 Bejection.-See MIL-A-48078 (PA). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
17、se from IHS-,-,-Co o O m W di c 8 VI W 6 I- 00 c VI w n o LL W Z O r= k 4 I 4 VI u MIL-F-63068 13 W 7777706 0393329 2 E e * 0000000000000 O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-CU 8 CU wc 3 W MIL-F-b306 13 9797906 0343330 7 M 02 O .$ 8 O 5
18、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-F-b30b 13 7777706 0343331 O d Ir. O d I- W W zi *.e . 0 O00 o O00 O0 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-F-63068 13 7777706,034
19、3332 2 = I ri Lr O ri n In al aJ u2 9 Y . o O00 O0 O0 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63064 13 M 7797706 0393333 M MIL-F-63068 (PA) 4.4.3 Testing 4.4.3.1 Proving Ground 4.4.3.1.1 Graze Functioning.-A sample of twenty (20) impa
20、ct switches shall be randomly selected from each lot for this test. Each sample switch shall be assembled onto a cartridge comprised of components (projectile, fuze, shaped-charge liner, etc.) previ- ously tested and accepted in accordance with applicable specifi- cations. If six (6) or more cartrid
21、ges fail to comply with the applicable requirement, the impact switch lot shall be rejected. If one (1) or more projectiles fail to initially impact the gravel pad, the impact switch lot shall be referred and results of such impacts shall be reported. 4.4.3.1.2 Safety.-All cartridges fired in provin
22、g ground testing shall be observed for impact switch separation or breakup. If any impact switch fails to comply with the applicable requirement, the lot shall be rejected, 4.5 Test Method and Procedures 4.5.1 Materials, Components and Processes.-Compliance with all requirements of Section 3 of this
23、 specification shall be ascertained by current and continuing examination of in- spection and test data to determine that all components (parts, subassemblies, and materials) have been inspected and tested and found to comply with their respective drawing and specifi- cation requirements, and that a
24、ll specified manufacturing processes have been followed. 4.5.1.1 Visual and Mechanical Inspection.-The visual, 1 manual and mechanical insDections and tests shall verifs com- pliance with the requirements of Sections 3 and 5 of this specification in accordance with 4-4.2 herein, 4.5.2 Insulation Res
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF630681976FUZEM539IMPACTSWITCHASSEMBLYFORPARTSFORASSEMBLINGANDPACKINGM539 引信 碰撞 开关 装配 零件 组装 包装

链接地址:http://www.mydoc123.com/p-444803.html