ARMY MIL-DTL-9401 C-2003 CANOPY PARACHUTE RING SLOT GENERAL SPECIFICATION FOR CONSTRUCTION OF《遮篷 降伞和环槽的建造常规》.pdf
《ARMY MIL-DTL-9401 C-2003 CANOPY PARACHUTE RING SLOT GENERAL SPECIFICATION FOR CONSTRUCTION OF《遮篷 降伞和环槽的建造常规》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-9401 C-2003 CANOPY PARACHUTE RING SLOT GENERAL SPECIFICATION FOR CONSTRUCTION OF《遮篷 降伞和环槽的建造常规》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 Beneficial comments (recommendations, additions, deletions) and any pertinent data that may be of use in improving this document should be addressed to: Natick Soldier Center ATTN: AMSSB-RAD-AD(N), Natick, MA 01760-5017, using the Standardization Document Improvement Proposal (DD Form 1426) appeari
2、ng at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. INCH-POUND MIL-DTL-9401C 12 May 2003 SUPERSEDING MIL-C-9401B 9 January 1968 DETAIL SPECIFICATION CANOPY, PARACHUTE, RING SLOT, GENERAL SPECIFICATION FOR CO
3、NSTRUCTION OF This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the general construction requirements of a parachute canopy which is characterized by concentric rings of cloth separated from each other b
4、y slots and designated as the ring slot parachute canopy. 1.2 Classification. The classification of parachute assemblies are defined as part numbers as specified in the acquisition requirements (see 6.2). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are cited in sections
5、 3 and 4 of this specification. These lists do not include documents cited in other sections of this specification or those recommended for additional information or as examples. While every effort has been made to ensure the completeness of these lists, document users are cautioned that they must m
6、eet all specified requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications and standards. The following specifications and standards form a part of this document to the extent herein. Unless otherwise speci
7、fied, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation (see 6.2). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
8、-MIL-DTL-9401C 2 SPECIFICATIONS FEDERAL A-A-59291 - Ink, Marking (For Parachutes and Other Textile Items) V-T-295 - Thread, Nylon STANDARDS DEPARTMENT OF DEFENSE MIL-STD-849 - Inspection Requirements, Definitions and Classification of Defects in Parachutes (Unless otherwise indicated, copies of the
9、above specifications, standards, and handbooks are available from the Standardization Document Order Desk, 700 Robbins Avenue, Building 40, Philadelphia, PA 19111-5094) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherw
10、ise specified, the issues of the documents that are DoD adopted are those listed in the issue of the DoDISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS are the issues of the documents cited in the solicitation. AMERICAN SOCIETY FOR TESTING
11、AND MATERIALS (ASTM) ASTM D 737 Test Method for Air Permeability of Textile Fabrics ASTM D 6193 Standard Practice for Stitches and Seams (Application for copies should be addressed to the American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) 2.4 Order
12、of precedence. In the event of a conflict between the text of this document and the references cited herein (except for related associated specifications or specification sheets), the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation
13、s unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to a first article inspection in accordance with 4.2. 3.2 Materials. Materials shall conform to the requirements of the applicable Technical Data Package (TDP), t
14、o subsidiary specifications and standards applicable thereto and as specified herein. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-9401C 3 3.2.1 Thread. Unless otherwise specified, the thread used in the construction of the canopy shall co
15、nform to types I, II or III, class A of V-T-295. The color and size of the thread shall be as specified in the TDP. 3.2.2 Color. The color of webbing and tapes in fully concealed seams shall be optional except the color red shall not be used. 3.2.3 Recycled, recovered, or environmentally preferable
16、materials. Recycled, recovered, or environmentally preferable materials should be used to the maximum extent possible provided the materials meet or exceed the operational requirements, and promote economically advantageous life cycle costs. 3.3 Construction. Details of construction shall be in acco
17、rdance with the TDP and the additional requirements as specified herein. 3.3.1 Assembly aids. Drilling, notches, stapling, basting or any other such techniques used as aids in the manufacturing process shall be kept to a minimum and the use thereof shall be restricted to the same limitations as mark
18、ings (see 3.3.1.2). All assembly aids, such as staples, shall be removed during or after assembly. For Navy procurements, hot glues are not authorized as an assembly aid. 3.3.1.1 Basting. Basting requirements shall be as specified in the TDP or be in accordance with common industry practices. Bastin
19、g stitches shall not be seen in the finished seam or assembly. Contractors unfamiliar with commercial practices shall contact the contracting officer for specified details prior to assembly of the item. 3.3.1.2 Assembly markings. Markings on the canopy, riser and other components as an aid to assemb
20、ly and to indicate stitching patterns shall be accomplished in a manner that will not adversely affect the utility, strength, or appearance of the parachute. 3.3.2 Warp direction. The warp direction of the canopy material shall be parallel to the skirt reinforcement band (seams) unless otherwise spe
21、cified in the TDP. 3.3.3 Reinforcement bands. The ends of the reinforcement band shall overlap a minimum of 4 inches unless otherwise specified in the TDP. The rows of stitching shall be continuous across the overlap. 3.3.4 Skirt reinforcement. The ends of the skirt reinforcement shall overlap a min
22、imum of 6 inches unless otherwise specified in the TDP. The rows of stitching shall be continuous across the overlap. When more than one piece is used, the shortest length shall cross a minimum of four gores. 3.3.5 Vent reinforcement. The ends of the vent reinforcement shall overlap a minimum of 4 i
23、nches unless otherwise specified in the TDP. The rows of stitching shall be continuous across the overlap. The lap joint shall be located so that the ends of the overlap will be secured by the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-9
24、401C 4 stitching of at least two consecutive vent lines. The material for the vent reinforcement shall be one continuous piece. 3.3.5.1 Vent lines. Unless otherwise specified in the TDP, the vent lines shall be of the same material as the suspension lines. 3.3.6 Stitching. Stitching shall conform to
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL9401C2003CANOPYPARACHUTERINGSLOTGENERALSPECIFICATIONFORCONSTRUCTIONOF 遮篷降伞 建造 常规 PDF

链接地址:http://www.mydoc123.com/p-444459.html