ARMY MIL-D-46253 B-1974 DETONATOR ELECTRIC T20E1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《电雷管的T20E1零件和加载 组装和包装》.pdf
《ARMY MIL-D-46253 B-1974 DETONATOR ELECTRIC T20E1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《电雷管的T20E1零件和加载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-46253 B-1974 DETONATOR ELECTRIC T20E1 PARTS FOR AND LOADING ASSEMBLING AND PACKING《电雷管的T20E1零件和加载 组装和包装》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、 - - MIL-D-462538 13 9999906 03BOL11B 1 y - _- - MILD-46253B (PA) 11 February i974 SUPERSEDING MIL-D-46253A (MU) 15 May 1970 MILITARY SPECIFICATION DETONATOR, ELECTRIC, T20E1 PARTS FOR, AND LOADING, ASSEMBLING AND PACKING This specification Agencies of the Department of Defense. is approved for use
2、by all Departments and 1. SCOPE 1,l This specification covers the inspection of the parts and the loading, assembling and packing for one type of electric detonator designated as Detonator, Electric, T20E1. 2, APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date ( I of inv
3、itation for bids, or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-148 - Aluminum Foil MIL-A-2550 - Ammunition, General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attribu
4、tes (ABC-STD-105) MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance Tests For mL-STD-650 - Explosive: Testing . Sampling, Inspection and FSC: 1336 Provided by IHSNot for ResaleNo reproduction or networking permitted without li
5、cense from IHS-,-,-I I - %SL-STbii68- Lot Numbering of Ammunition .- . Procedures and Tables for Inspection by At tributes . XIL-STD-1235- Single and Multilevel Continuous Sampling . -. DRAWINGS U,S. ARMY ARMAMENT COMMAND PRODUCT AND PACKING DRAWINGS 8826740 - Detonator, Electric, T20E1, Assembly 87
6、96522 - Marking Diagram and Sealing far Wood Packing Boxes . INSPECTION EQUIPMENT DRAWINGS 8816368 - Disc, Lead -8871907 - Assembly, Holder 8873526 - Disc, Centering 9200355 - Instruction, Operating 9200356 - Set-up, Functioning 9200602 - Bushing (Copies of specifications, standards, drawings requir
7、ed by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer) . part of this specification to the extent specified herein. Vnless otherwise Indicated, the issue in effect on date of invitation for bids or r
8、equest for proposals shall apply. 2,2 Other publications. - The following document forms a CODE OF FEDERAL REGULATIONS TITLE 49 -TRANSPORATION, PARTS 0-190 The Code of Federal Regulatims is available from the Superintendent of Documents, Government Printing Office, Washington, D.C. 20402. Orders sha
9、ll specify 49 CFR 0-190 (latest revision). sel- Materials and Parts. - The materials and parts shall be in accordance with applicable drawings and specifications Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(- MIL-D-46253B (PA) . 3.2 Detonators. -
10、 The detonators shall comply with all require- ments specifled in Drawing (Dwg.) 8826740 and with all requirements apecfied in applicable specifications. 3.3 Moisture Content 3.3.1 Lead Azide. - The moisture content of the lead azide at the loading station at the time of loading the detonators shall
11、 not exceed 0.50 percent when tested as specified. 3.3.2 Pentaerythrite Tetranitrate (PETN). - The moisture content of the PETN at the loading statlon at the time of loading the detonators shall not exceed 0.50 percent when tested as speci- fied. 3.4 Functioning. - The detonators shall comply with t
12、he 3.4.1 3.4-2 following: Time. - The detonators shall fire on the first attempt within ten (10) microseconds. Output. - The detonators shall fire on the first attempt and shall make a 3/16 minimum (min.) diameter perforation in a 0.1345 inch thick lead disc. 3.4.3 Functioning duds.- Detonators that
13、 fail to fire on the 3.5 Waterproofness. - The detonators shall comply with the 3.6 Environmental 3.6.1 Temperature and Humidity. - The detonators shall comply with 3.4.1 after testing 3.6.2 Lead circuit resistance, thermal shock, and vibration. - The detonators shall comply with the lead circuit re
14、sistance require- ment of dwg. 8826740 and with 3.4.1, first attempt are duds. The detonators shall not dud. requirements of 3.4.2 and 3.4,3. as specified in MIL-STD-331, Test 105.1. 3.6.3 with 3.4.3. Cold Temperature. - The detonator assembly shall comply 3.6.4 with 3.4.3. Hot Temperature.- The det
15、onator assembly shall comply 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.7 .Workmanship, - All parts and assemblies shall be fabricated and loaded in a thorough, workmanlike manner They shall be free of burrs chips , sharp edges cracks surfac
16、e defects, dirt , grease, rust, Wrrosion products and Other foreign matter. The cleaning method used *hall not be injurious to any part nor shall the parts he contaminated ba the cleaning agent. All required markings shall be neat and sharply defined . technical provisions for first article inspecti
17、on. Requirements for the submission of -first article samples shall be as specified In the contract. . porosity as. indicated by air bubbles. 3.8 First Article Inspection. - This spectfication contains, - - 3.9 The plug assembly (dwg. 9280965) shall show no evieence of 4 . QUALITY ASSURANCE PROVISIO
18、NS 4.1 Besponsibiltp for fnspection. - Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may usehis own or any other fa
19、cilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspec- tions are deemed necessary to assure supplics and service
20、s conform to prescribed requirements . Reference shall be made to MIL-STD-109 to define terms used herein. The pravisions of MIL-A-2550 shall apply. Submission of Product. - At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the cont
21、ractor shall supply the following information accompanied by a certificate which attests that the information pro- vided is correct and applicable to the product being submitted. assurance provisions specified in this specification. identification and date of. changes thereto. meets requirements, wh
22、en such material is controlled by Government or commercial specifications referenced in any of the contractual docu- ments, and that certificates of conformance are on file and available for review. 4.1.1 a. A statement that tie lot complies with all of the quality 1 b. Drawlng and specification num
23、ber and date, together with ! : C. A statement that all material purchased by the contractor d. Number of items in the lot. e. Date submitted. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46253B (PA) The certificate shall be signed by a re
24、sponsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority Will not be required with subsequent certificates unless, during the course of the contract, this
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD46253B1974DETONATORELECTRICT20E1PARTSFORANDLOADINGASSEMBLINGANDPACKING 雷管 T20E1 零件 加载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442395.html