1、Section 15 CONCRETE BLOCK AND BRICK MASONRY 15.1 DESCRIPTION Concrete block and brick masonry shall consist of con- crete blocks or brick laid in cement mortar and may be un- reinforced or reinforced with steel reinforcing. Block or brick pavements are not included under this designation. 15.2 MATER
2、IALS 15.2.1 Concrete Block Unless otherwise specified in the special provisions or approved in writing by the Engineer, all concrete block for masonry construction shall be Type I moisture controlled units (Grade N-I) that meet the requirements of ASTM C 90. The value off,!, shall be as shown on the
3、 plans or as specified in the special provisions. Concrete block units should be protected from rain, snow, or other moisture during storage on or off the job site to assure that they will meet the Type I moisture re- quirements at the time they are placed in the construction. 15.2.2 Brick Brick for
4、 masonry construction shall conform to the Specification for Building Brick (solid masonry units made from clay or shale) AASHTO M 114 (ASTM C 62), Concrete Building Brick (ASTM 55), or Solid Load-Bear- ing Concrete Masonry Units (ASTM 145). The type and grade of brick to be furnished shall be as sh
5、own on the plans or as specified in the special provisions. The bricks shall have a fine-grained uniform, and dense structure, free from lumps of lime, laminations, cracks, checks, soluble salts, or other defects which may in any way impair their strength, durability, appearance, or usefulness for t
6、he purpose intended. Bricks shall emit a clear, metallic ring when struck with a hammer. 15.2.3 Reinforcing Steel Reinforcing steel used in the construction of concrete block or brick masonry structures shall conform to the re- quirements for uncoated reinforcing in Section 9, “Rein- forcing Steel.”
7、 15.2.4 Mortar Mortar used shall conform, as regards materials, pro- portions and mixing, to the mortar specified in Articles 14.2.3 and 14.4.2. 15.2.5 Grout Grout for filling voids in hollow masonry units shall ei- ther conform to the requirements of ASTM C 476 or to the requirements of the followi
8、ng paragraph. As an alternative to the requirements of ASTM C 476, the materials for grout shall conform to the requirements of Section 8, “Concrete Structures,” for cement, aggre- gates, water and admixtures and to the requirements of Ar- ticle 14.2.3 for lime. Coarse aggregate shall be of either %
9、- inch or %-inch maximum gradation. For fine grout, if proportioned by volume, the cementitious materials shall consist of one part Portland cement to no more than %O part hydrated lime or lime putty and the aggregates shall con- sist of sand in the amount of 21/4 to 3 times the total volume of ceme
10、ntitious materials. For coarse grout, the propor- tions shall be the same as for fine grout except that coarse aggregate in the amount of 1 to 2 times the total volume of cementitious materials shall be added. If proportioned by weight, the weights used shall be equivalent to those which would be ob
11、tained by volumetric methods. Adjustments in mix proportions, within the limits al- lowed, shall be made as necessary to satisfy workability and strength requirements. Admixtures shall be used only when specified or ap- proved by the Engineer. 15.2.6 Sampling and Testing 15.2.6.1 Mortar Unless other
12、wise specified in the special provisions, mortar shall have a minimum 28-day compressive 603 604 HIGHWAY BRIDGES 15.2.6.1 strength of 1,800 psi based on the average of three spec- imens tested in accordance with the requirements of ASTM C 780. Field samples shall be obtained as follows: (a) Spread Y
13、2 inch or the thickness of the mortar joint of mortar on masonry units. (b) After 1 minute remove mortar and compress into 2 x 4 inch cylinder in two layers using flat end of a rod or fingers, being sure to see that mold is solidly filled. (c) Lightly tap cylinder immediately and maintain in damp co
14、ndition. (d) After 48 hours remove mold and store in fog room until testing. 15.2.6.2 Grout When required by the special provision or requested by the Engineer, the Contractor shall manufacture grout prisms for testing. Prisms shall be manufactured at the site during construction using the following
15、 procedure: (a) Place masonry units, having same moisture condi- tion as those being placed, on nonabsorptive base to form a void for a square prism with a height twice the side and a minimum side of 3 inches. (b) Line the side faces of the prism with permeable paper or porous separator to allow wat
16、er passage through liner into masonry units. (c) Fill prism with a fully representative grout sample in two layers. Puddle each layer to eliminate air voids. (d) Level off specimen and maintain in a damp condi- tion. (e) Remove prisms from masonry units after 48 hours and deliver to Engineer. Grout
17、prisms will be tested in accordance with the pro- visions of ASTM C 39. Grout shall have attained a com- pressive strength of 2,000 psi at 28 days unless otherwise specified in the special provisions. 15.3 CONSTRUCTION 15.3.1 Weather Conditions Block or brick masonry shall not be constructed in free
18、zing weather or when the block or brick contains frost, except by written permission of the Engineer and subject to such conditions as he or she may require. “shove-joint method; “buttered” or plastered joints will not be permitted. All clay or shale brick must be thor- oughly saturated with water b
19、efore being laid. Dampen- ing of concrete masonry units before or during construc- tion shall not be permitted unless approved by the Engineer. The arrangement of headers and stretchers shall be such as will thoroughly bond the mass and, unless oth- erwise specified, work shall be of alternate heade
20、rs and stretchers with consecutive courses breaking joints. Other types of bonding, as for ornamental work, shall be as specified on the plans. All joints shall be completely filled with mortar. They shall not be less than Y4 inch and not more than 5/s inch in thickness and the thickness shall be un
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC152002DIVISIONIICONSTRUCTIONCONCRETEBLOCKANDBRICKMASONRY 混凝土 砌块 砖砌体 PDF

链接地址:http://www.mydoc123.com/p-417581.html