1、This document has been approved for use by agen- cies of the Department of Defense and for listing in the DoD Index of Specifications and Standards. 306.1 -90 (Reapproved 2002) Standard Specification forcold Weather Concreting (306.1-90) Reported by AC1 Committee 306 Nicholas J. Carino, Chairman* Fr
2、ed Anderson* Peter Antonich George R. U. Burg Oleh B. Ciuk Douglas J. Haavik* Gilbert Haddad Jules Houde David A. Hunt Robert A. Kelsey Albert W. Knott Charles J. Korhonen William Perenchio* John M. Scanlon This Standard Specification gives requirements for cold weather con- creting. It includes col
3、d weather requirements for preparations prior to placement of concrete, and protection of concrete. Keywords: accelerating admixtures; cold weather; compressive strength; con- struction; curing; formwork; freezing; heating; insulation; maturity; protec- tion; temperature. FOREWORD F1. This foreword
4、is included for explanatory pur- poses only; it does not form a part of the Standard Specification AC1 306.1. F2. Standard Specifications AC1 306.1 is a Reference Standard which the Archtect/Engineer may cite in the Project Specifications for any building project, to- gether with supplementary requi
5、rements for the spe- cific project. F3. Each technical section of Standard Specification AC1 306.1 is written in the Three-Part Section Format of the Construction Specifications Institute, as adapted by AC1 and modified to AC1 requirements. The lan- guage is generally imperative and terse. F4. Check
6、lists do not form a part of Standard Spec- ification AC1 306.1. Checklists are to assist the Archi- tect/Engineer in properly choosing and specif$ng any necessary requirements for the Project Specifications. PREFACE TO SPECIFICATION CHECKLIST P1. Standard Specification AC1 306.1 is intended to be us
7、ed by reference or incorporation in its entirety in the Project Specifications. Individual sections, articles, or paragraphs shall not be copied into the Project Specifications, since tahg them out of context may change their meaning. *Task force for revision. Supercedes AC1 306.1-87. Revised by the
8、 Expedited Standardization Proce- dure, effective July 1, 1990. In 1990, the format was revised. The Foreword, Preface, and Specification Checklist were revised. Reference Standards were updated and the sections on Materials and Execution were rewritten and re- numbered. Michael Shydlowski Bmce A. S
9、uprenant J. Derle Thorpe Valery Tokar Lewis H. Tuthill* Harold B. Wenzel Arthur T. Winters P2. If sections or parts of Standard Specification AC1 306.1 are edited into project specifications or any other document, they shall not be referred to as AC1 Standards, since the Standard Specification has b
10、een altered. P3. Building codes set minimum requirements neces- sary to protect the public. This Standard Specifica- tion may stipulate requirements more restrictive than the minimum. Adjustments to the needs of a particular project shall be made by the Architect/Engineer by re- viewing each of the
11、items in the Specification Check- list and then including the Archtect/Engineers deci- sion on each item as a mandatory requirement in the Project Specifications. P4. These mandatory requirements designate the specific qualities, procedures, materials, and perfor- mance criteria for which alternativ
12、es are permitted or for which provisions were not made in the Standard Specification. Exceptions to the Standard Specifica- tion shall be made in the Project Specifications, if re- quired. P5. A statement such as the following will serve to make Standard Specification AC1 306.1 a part of the Project
13、 Specifications. Work on shall conform to all requirements of AC1 306.1, Standard Spec- ification for Cold Weather Concreting, published by the American Concrete Institute, Detroit, Michigan, except as modified by the requirements of these Contract Documents. P6. The Standard Specification Checklist
14、 identifies Architect/Engineer choices and alternatives. The checklist identifies the sections, parts, and articles of the Standard Specification and the action required by the Archtect/Engineer. Copyright 0 2002, American Concrete Institute. All rights reserved includ- ing rights of reproduction an
15、d use in any form or by any means, including the making of copies by any photo process or by any electronic or mechanical de- vice, printed or written or oral or recording for sound or visual reproduction or for use in any knowledge or retrieval system or device, unless permission in writing is obta
16、ined from the copyright proprietors. 306.1-1 306.1-2 AC1 STANDARD SPECIFICATION CHECKLIST M. MANDATORY REQUIREMENTS Section/Par/Article of AC1 306.1 Notes to the ArchitectEngineer 1.4 Reference standards 3.1 Preparation before concreting Review applicability of the cited references and take exceptio
17、n if required If the temperature of massive embedments, such as heavy steel de rails or channels and steel grate frames or ducts, is lower than 32 F, concrete cast around them will be gaged b freezing. IdentiSi in the Contract Documents massive embedments which must be at a temperature above Zeezing
18、 prior to placement of con- crete. A frozen subgrade can lead to freezing of newly-placed concrete or foundation settlement upon subse uent thawing of the subgrade. SpeciSi in the Contract Documents the depth to which frozen subgrade shojd be thawed prior to placement of concrete. Specify procedure
19、to verify that subgrade has been thawed to specified depth. 3.2.2 Protection temperature Speci the frequency for recording the temperature but do not use a frequency lower than twice per 24-hr pe- riod. 3.4.5 Protection for structural safety Indicate in the Contract Documents the concrete strength r
20、equired for each structural member before form re- moval or continued construction, or both. O. OPTIONAL REQUIREMENTS Section/Par/Article of AC1 306.1 Notes to the ArchitectEngineer 1.5.1 Detailed procedures Indicate in the Contract Documents whether submittal, review, and acceptance of procedure is
21、 required. Des- ignate degree of detail required in any submittal procedure. 3.3 Curing concrete Strength gain may not continue after removal of the protection because of rapid drying in regions where there are periods of cold, dry, wind weather. Therefore, under these conditions, consideration shou
22、ld be given to extending the protection peno1 in order to facilitate moist curing. Spec* the minimum protection temperature if different than Column 2 of Td ., .c.:. . : h4.* 1 B km p. sub. 9 -4, ., y . 3.1 - Preparation before concreting 3.2 - Concrete temperature 3.3 - Curing of concrete 3.4 - Pro
23、tection of concrete 1 -GENERAL 1.1 - Scope 1.1.1 This Standard Specification covers require- ments for cold weather concreting and protection of concrete fi-om freezing during the specified protection period. 1.1.2 The provision of this Standard Specification shall govern unless otherwise specified
24、in the Contract Documents. 1.2. - Definitions These defmitions are to assist in interpreting the pro- visions of this specification. Accepted - Accepted by or acceptable to the Archi- tecthgineer. ArchitedEngineer -The architect, engineer, archi- tectural firm, engineering firm, or architectural and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI30611990STANDARDSPECIFICATIONFORCOLDWEATHERCONCRETING 冷天 混凝土 浇筑 标准规范 PDF

链接地址:http://www.mydoc123.com/p-401150.html