1、CDM/Energy Efficiency Projects EGYPT : Group II,Ihab Elmassry, M. Sc., CEM, DGCP Energy Solutions Business Egypt & Middle East Cummins Power Generation - UK Mobile +(2) 012-312-5477, Fax +(202) 401-1202 Email: ,Discussion Points,Egypt Energy Outlook SS EE - CDM projects Plant Description Technology
2、Description Energy Consumption Sources of GHG BL & CERs Energy Efficiency Business in Egypt,1. Egypt Energy Outlook,Electricity Electricity Cons.(02/03) 81 TWh Installed Power 18 GW FuelNG 21 M TOEFuel #2 8.6 M TOEFuel #6 6 M TOE,Fuel Consumption in Egypt,110 Million ton (2002),Egypt CO2 Emissions,P
3、rojects to be presented,Cogeneration1.1 MWe Cogeneration Elnasr For Paper (PDD) 1.3 MWe Cogeneration Misr Elmonofia for textile (PIN)Fuel SwitchingFuel switching Glass for dyeing (PDD) Fuel switching clay bricks factories (PIN)Energy Management System (EMS)EMS Zenotex for dyeing (PIN),EE Definition,
4、There is no single definition, But ,Doing the same with less Energy efficiency measures are designed to reduce the amount of fuel/energy consumed without losing any of the value of the product or process. Improving energy efficiency is a technological means to reduce emissions of greenhouse gases wi
5、thout increasing production costs. http:/ Cogeneration Projects,Small Scale CDM projectsPlant namesElnasr for paper & Carton (PDD) Misr Elmnofia for textile (PIN),Technology,Cogeneration is the simultaneous generation of usable heat and power, usually electricity, in a single process from the same f
6、uel.CHP is not a new technology Used in Thomas Edisons first electric generating plant in 1891,Fuel + air,Losses,Steam,Electricity,Losses,Fuel + air,Losses,Cost of Electricity + Heat,Cogeneration Vs Conventional System,Cogeneration Vs Conventional System,Benefits of Cogeneration,Energy efficientRedu
7、ction in kWh and heat costsReduction in air emissions,1. Elnasrs Project Summary,Plant Name Elnasr Company for Paper Location Alexandria, Egypt PDD Draft version has been issued Technology NG-Based Cogeneration Package Size 1.1 MWe & 1 t/hr Sat. Steam Project cat. Small Scale, EEI - II-D Investment
8、$370,000 CO2 Reduction 2,500 ton/yr,Plant Background,Annual operating hrs 8760 hr Max. electrical demand 2000 kW Voltage level 11/0.38 KV Diesel engine 800 kW The plant cover its electric demand through utility grid and diesel gen-sets. Not synchronized in with the utility grid. NG availableTwo boil
9、ers exists one out of order. The on service boiler data is Rated pressure 25 barg Operating pressure 12.5 barg Process pressure 4 barg 2 burners 1 NG/Light oil & 1 heavy oil,900 MWh/mo,Elnasr Co. for Paper SLD,To 560 kW 6 kV motor,Feeder A,Feeder B,MV Bus bar,TR 2 1 MVA,0.4,kV,Low voltage loads,Low
10、voltage loads,TR 31 MVA,G2,380 V level,NC,TR 41 MVA,11 kV side,0.5 MVA,Change over switch,G1,1 MVA,TR 1 1 MVA,Other loads,Other loads,Possible Alternatives,Cogen scheme Gen-set-based / GT-based connectionIsolated mode Parallel mode (synchronized with utility),To 560 kW 6 kV motor,Feeder A,Feeder B,M
11、V Bus bar,TR 2 1 MVA,0.4,kV,Low voltage loads,Low voltage loads,TR 31 MVA,380 V level,NC,TR 41 MVA,11 kV side,TR 1 1 MVA,Supply steam base load 4barg,Supply electric base load 11 kV,Proposed SLD,Cummins QSk60 Gas-Gen Set,No kWh export,Sell Back price?,Baseline,Type II - D Energy Efficiency Improveme
12、ntBL emissions are the current emissions of the facility due to self-generation, kWh from utility grid & boiler.Cogen input fuel is pipeline NG and output is electricity (kWh) and heat (saturated steam). This will cover kWh & ton/hr base loads.,BL - Most Recent Central Power Station in Egypt,CO2 emi
13、ssions factor 525 kg CO2/MWh,IPCCC Emission Factors,Project Boundary,Elnasr Plant,Boiler,Electricity from public utility,NG,Steam,Elec. Power,G,Fuel #2,Plant site,Project site,Elnasr Plant,Boiler,NG,Steam,Elec. Power,NG,Cogen unit,Project boundary,Project & BL Emissions,CERs,Crediting Period: 10 yea
14、rs1st yr of the Crediting Period: 2006Baseline emissions 7,938 ton CO2 eq Project emissions 5,391 ton CO2 eq Emissions reductions 2,546 ton CO2 eq,Barriers,I. Investment/financial barrier A cogeneration project is relatively a capital intensive project. There is no clear financing mechanism for EE p
15、rojects. Banks and leasing companies interest rates are high. Subsidy that imposed on electricity and energy prices. Relatively high simple payback periods, in best cases it is not less than 7 years.,Barriers (Cont.),III. Institutional The reluctance of the utility to purchase the excess kWh. The la
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CDMENERGYEFFICIENCYPROJECTSEGYPTGROUPIIPPT