CDM Potential in Animal Manure Management and .ppt
《CDM Potential in Animal Manure Management and .ppt》由会员分享,可在线阅读,更多相关《CDM Potential in Animal Manure Management and .ppt(28页珍藏版)》请在麦多课文档分享上搜索。
1、CDM Potential in Animal Manure Management and Estimation of Emission Reduction,April 9, 2007 Training for Carbon Finance Unit Flora Tao, Zijun Li, Zarina Azizova,Agenda,Potential AMMS CDM projects Applicable methodologies Rule-of-thumb for estimation of ER Key parameters to estimate ER Monitoring of
2、 AMMS Other issues related to large scale biogas plant,Potential AMMS CDM Project,Animal manure: methane and N2O emissions,Baseline: Manure storage methods: Solid, dry, liquid, pits, deep litter, open anaerobic lagoon,Project Scenario: Manure treatment system: Anaerobic treatment with methane recove
3、ry/utilization Combustion of manure Aerobic treatment,Transitions between these alternatives can reduce methane and N2O emissions.,Potential of carbon finance in AMMS project activities (cont),Biogas digester and power generation Minhe Chicken farms Biogas co-generation system project, ChinaCovered
4、lagoons + flaring with or without utilization of biogas Methane Recovery and Utilization Project, Mexico Combustion of chicken litter with or without power generation3 MW Poultry Litter Fueled Power Project, India,Case Study: Minhe Poultry Mature Biogas Project,Minhe Poultry Mature Biogas Project,To
5、tal chicken population: 3.6 million broiler and 1.4 million breederDaily fresh manure 500 tons with 20% of Total solidWaste water of 1000 ton from flushing the chicken barnCurrent practice of manure management: uncovered lagoonProposed project: Anaerobic Digester + Co-generationTotal Investment: 40.
6、7 million RMBO&M Cost: 5.5 million RMBRevenue w/o carbon: 7.6 million Revenue w/ carbon: 14.2 million,Combustion of poultry litter for power generation,Baseline: poultry litter disposed of in a landfill CDM Project: combustion of poultry litter to produce electricity and to avoid methane production.
7、 Manure should be dry ! Applicable methodology: AMS.III.E Costs: Installed costs per MW is in the range of 1.5 to 3 Mln USD. Rules of thumb: The poultry farm produces 100 tons of dry poultry litter per day which sustains 3MW power plant and reduces 65,000 tons of CERy (45k from metahne avoidance and
8、 20k from electricity displacement).,Methane recovery from covered lagoons,Baseline: open anaerobic lagoon CDM project: lined covered lagoon with HDPE geomembrane Applicable methodologies: ACM10 & AMS.III.D Installed costs: USD 150,000 (without power generator) Operational costs: USD 2500 Number of
9、heads: 73,000 swine Estimated ERs: 61k tons of CO2e per annum,Applicable approved methodologies,ACM0010 - GHG emission reductions from manure management systemsFor project with emission reductions below 60kt CO2e/yAMS.III.D methane recovery in agricultural and agro industrial activities AMS III.E av
10、oidance of methane production from biomass decay through controlled combustion,Rule of Thumb for ER Estimation (Annual Average Temperature = 10 C) ECH4,y = GWPCH4,y * DCH4 * MCFj * Bo,LT * N * VSLT,y * MS%Bl,j,Important factors to consider,Existing manure treatment system on livestock farms Methane
11、Conversion Factor (MCF)Pasture 1%-2%Daily spread 0.1%-1.0%Solid storage 2%-5%Dry lot 1%-2%Liquid/slurry 17%-80%Uncovered anaerobic lagoon (depth=1m2) 66%-80%Pit storage under animal confinements 17%-80%Anaerobic digester 0%-100%Aerobic treatment 0%,Important factors to consider (cont.),Climate: Annu
12、al average temperature in the baseline site should be higher than 5 CDepth of open lagoons in the baseline scenario: = 1 m2. The size of lagoon should be large enough to store at least one month output of manure.Livestock species: ACM0010 livestock definition: cattle, buffalo, swine, sheep, goats, a
13、nd poultryFarms livestock capacity:a. Static populationb. Growing population: AAP = Days_alive * NAPA/365AAP = annual average populationNAPA = number of animals produced annually,Animal,Population,(Layer, Broiler),Anaerobic,Digester System,Power,generation,system,Aerobic,lagoon,Project Boundary,Biog
14、as CH,4,Con.,Biogas flow,Rate 2,VS. N Con.,Sludge flow rate 5,Operation hours,Electricity,Meter 2,Electricity,Meter 3,Monitoring Plan,Grid,Electricity,Meter 1,by Grid,Company,Electricity,Consumption,Meter 4,Land,application,Biogas flow,Rate 1,VS. N. Con.,Effluent flow rate 2,VS. N Con.,Effluent flow
15、 rate 4,Gas tank,VS. N. Con.,Effluent flow rate3,VS. N. con,Manure flow rate 1,Flaring Tower,Other issues and benefits,Issues: If arsenic is added to the feedstock, ensure that the level of arsenic or other heavy metals in the feedstock are within permissible limits Measure the arsenic content of sl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CDMPOTENTIALINANIMALMANUREMANAGEMENTANDPPT
