Carbon DioxideFlooding in Central Kansas Reservoirs.ppt
《Carbon DioxideFlooding in Central Kansas Reservoirs.ppt》由会员分享,可在线阅读,更多相关《Carbon DioxideFlooding in Central Kansas Reservoirs.ppt(32页珍藏版)》请在麦多课文档分享上搜索。
1、Carbon Dioxide Flooding in Central Kansas Reservoirs,G. Paul Willhite Tertiary Oil Recovery Project,Tertiary Oil Recovery Advisory Board October 19-20,2001,Minimum Miscibility Pressure,Requirements for Carbon Dioxide Miscible Flooding,Minimum miscibility pressure must be determined for Kansas crude
2、oils Must be possible to re-pressure reservoir to reach MMP during the displacement process Carbon dioxide must be available at a price that will make the process economic,Tertiary Oil Recovery Project,Minimum Miscibility Pressure in Hall-Gurney LKC,Tertiary Oil Recovery Project,Outline of Presentat
3、ion,The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply New Partner Expanded DOE Project,Tertiary Oil Recovery Project,Outline of Presentation,The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply New P
4、artner Expanded DOE Project,Tertiary Oil Recovery Project,Central Kansas Initiative Overall Objective,Verify technical and economic viability of the application of CO2 miscible flooding to Central Kansas oil fieldsCritical element: Demonstrate sufficient field performance(oil in the tank) to justify
5、 the development of a carbon dioxide pipeline into Central Kansas,Tertiary Oil Recovery Project,Components of Carbon Dioxide Program,Phase I:Conduct a feasibility study on Arbuckle and Lansing Kansas City Reservoirs(KTEC Contract)Phase II: Select a site and design one or more field pilot CO2 miscibl
6、e floods(DOE Class Program Revisited),Tertiary Oil Recovery Project,Components of Carbon Dioxide Program(Continued),Phase III: Construct and operate the CO2 pilot(DOE Class Program Revisited)Phase IV: Evaluate technical and economic performance of pilot(DOE Class Program Revisited)Phase V: Build a C
7、O2 pipeline into Central Kansas(Kinder Morgan),Tertiary Oil Recovery Project,Outline of Presentation,The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply New Partner Expanded DOE Project,Tertiary Oil Recovery Project,Field Demonstration of CO2 Miscibl
8、e Flooding in the L-KC, Central Kansas,Class II Revisited DE-AC26-00BC15124,MV Energy LLC,March 7,2000,L-KC Recoveries in Hall-Gurney and Trapp, 8 MBO/acre,6-8 MBO/acre,4-6 MBO/acre,2-4 MBO/acre,Cumulative Production Primary + Secondary Lansing-Kansas City (Per Section Basis),Kansas Geological Surve
9、y,Project Economics,Total Project $5.4 million $2.0M CO2 Purchase, transport, recycling $1.5M Research, Technology Transfer $1.1M Capital Costs (wells, etc.) $0.8M Operations (6 years)Funding $2.4M Kinder-Morgan CO2 Co. LP and Murfin Drilling Company $1.9M U.S. Department of Energy $1.0M KGS and TOR
10、P $0.1M Kansas Department of Commerce,DOE Class Program Revisited,Central Kansas CO2 Demonstration ProjectPhase 1-Reservoir Characterization( 1 Year)Phase 2-Field Demonstration(4 years)Phase 3-Monitoring(1 year),Demonstration Design Summary,55 acre, nine-spot 2 CO2 injectors 7 Producers 5 Containmen
11、t Water Injectors 0.843 BCF CO2 injected-WAG 4.6 year operating life 80,000 BO estimated recovery during DOE 20,000 BO in 3 years after DOE Project,Outline of Presentation,The Central Kansas Initiative Field Demonstration Project Hall-Gurney Field The Carbon Dioxide Supply New Partner Expanded DOE P
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CARBONDIOXIDEFLOODINGINCENTRALKANSASRESERVOIRSPPT

链接地址:http://www.mydoc123.com/p-379316.html