Basic ConceptsJiwei Ma.ppt
《Basic ConceptsJiwei Ma.ppt》由会员分享,可在线阅读,更多相关《Basic ConceptsJiwei Ma.ppt(46页珍藏版)》请在麦多课文档分享上搜索。
1、Basic ConceptsJiwei Ma,Project Management,Basic Concepts,Concept of projectProject as a systemWork Breakdown Structure (WBS)Project Management,What Is A Project?,Organize 2008 Olympic game Develop a software product Write software program Hire an accountant Interview applicants for the accountant po
2、sition Purchase a house Purchase gasoline for your car Organize a conference Set up a weekly meeting,Concept of Project,Main features of a project One-time, non-repetitive One of the kind Constrained by resources and environmental conditions Certain lifecycle,Concept of Project,Project is a one-time
3、 effort with clear objectives for the accomplishment of certain specific product or service,One-time Definite and clear starting/ending point Effort Number of personnel and various resources involved Objective Requirement of certain quality standard with limited time and money Specific Different fro
4、m all previous product or service,Concept of Project,Project objectives Quality The desired function or required standard Cost The monetary resource needed to accomplish the project Time The specified length of the project course,Project Triangle,Scope,Cost,Quality,Time,Relations among Project Objec
5、tives,Reduce time - Improve cost-effectiveness,Reduce time - Increase cost,Higher quality Less time,Less time More quality defects,Improved quality Reduce maintenance cost,Increase investment Improve Quality,Cost,Time,Quality,Objective Triangle,Concept of Project,Project components the essential ele
6、ments of a project which serve the main purpose or carry out the major designed functions of the project Subprojects Functional subsystems Single objects A hierarchical structure - Project structure - can be used as a tool to illustrate project components,Project Components Project Structure,Project
7、,Subproject 1,Subproject 2,Subproject 3,Subproject ,Subsystem 22,Subsystem 21,Subsystem ,Object 221,Object 222,Object 223,Object ,Concept of Project,Project Process the major periods needed to go through to accomplish the project Decision making Design/Planning Execution Operation Closeout A network
8、 diagram or bar chart will be used to illustrate activities as well as their inter-relationship and inter-dependency,Construction Project Phasing,Design Preparation,Design,Construction,Operation,Closeout,Decision Making,Project Proposal,Feasibility Study,Design Specification,Preliminary Design,Desig
9、n Development,Construction Document,Construction,Acceptance,Start up,Network Diagram,Concept of Project,Functional works the major functions needed to be performed to jointly or consecutively accomplish the project, Fund raising Administration/management Planning Procurement Controlling Coordination
10、/collaboration Communication and information management Inspection and acceptance Operation Project closeout,Concept of Project,Project Participants the personnel or the parties who perform various functional works, Investor Developer Planner Purchasing personnel Controller Inspector Operation perso
11、nnel A chart called project organization structure is often used to illustrate project participants and their inter-relationship within a project system,Project Owner,Construction Project Participants,Project As a System,System definition Any group of entities which are functionally interdependent c
12、an be called a system Any group of entities which are interrelated so as to perform some function, or reach some goal, can be seen to be acting as a system Focus of system theory Sub-system Interrelated in the pursuit of goals or objectives Primary task of the system The things the organization must
13、 to do to survive,Project As a System,Important Concepts Large system comprise smaller sub-systems which share the goals or primary task of larger system Sub-systems are independently work together towards the common goal Sub-systems form a hierarchy of systems System interacts with its environment,
14、 and affected by environmental constraints or influences The environment is not part of the system it does not share the goals of the system,Project As a System,Important Concepts The system receives inputs from and exports outputs to the environment through sort of internal conversion process A per
15、meable boundary exists between the system and its environment “Boundary Management” is a key system concept Part of the outputs is fed back to become an input and thus to establish a cycle of events which enable the system to monitor it own behavior,Construction System Model,Construction Production
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BASICCONCEPTSJIWEIMAPPT