A Framework for Early Reliability Assessment.ppt
《A Framework for Early Reliability Assessment.ppt》由会员分享,可在线阅读,更多相关《A Framework for Early Reliability Assessment.ppt(28页珍藏版)》请在麦多课文档分享上搜索。
1、A Framework for Early Reliability Assessment,Bojan Cukic, Erdogan Gunel, Harshinder Singh, Lan Guo, Dejan Desovski West Virginia UniversityCarol Smidts, Ming Li University of Maryland,(WVU UI: Integrating Formal Methods and Testing in a Quantitative Software Reliability Assessment Framework 2003),2,
2、Overview,Introduction and Motivation. Software Reliability Corroboration Approach. Case Studies. Applying Dempster Shafer Inference to NASA datasets. Summary and Further Work.,3,Introduction,Quantification of the effects of V&V activities is always desirable. Is software reliability quantification p
3、ractical for safety/mission critical systems? Time and cost considerations may limit the appeal. Reliability growth applicable only to integration testing, the tail end of V&V. Estimation of operational usage profiles is rare.,4,Is SRE Impractical for NASA IV&V?,Most IV&V techniques are qualitative
4、in nature. Mature software reliability estimation methods based exclusively on testing. Can IV&V techniques be utilized for reliability? Requirements readings, inspections, problem reports and tracking, unit level tests,Req Design Code Test (Verification & Validation)Unit Integration Acceptance,Life
5、 cycle long IV&V Implementation,Traditional Software Reliability Assessment Techniques,5,Contribution,Develop software reliability assessment methods that build on: Stable and mature development environments. Lifecycle long IV&V activities. Utilize all relevant available information Static (SIAT), d
6、ynamic, requirements problems, severities. Qualitative (formal and informal) IV&V methods. Strengthening the case for IV&V across NASA enterprise. Accurate, stable reliability measurement and tracking. Available throughout the development lifecycle.,6,Assessment vs. Corroboration,Current thinking So
7、ftware reliability “tested into” the product through the integration and acceptance testing. Our thinking Why “waste” the results of all the qualitative IV&V activities. Testing should corroborate that the life-cycle long IV&V techniques are giving the “usual” results, that the project follows usual
8、 quality patterns.,7,Approach,Software quality Measures (SQM),Reliability Prediction Systems (RPS),RPS Combination Techniques,SW Reliability Corroboration Testing,SQM1,SQM3,SQM2,SQM4,SQM6,SQM5,SQMi,SQMj,RPS1,RPS2,RPSk,RPSm,. . .,RPS Combination (Experience, Learning, Dempster-Schafer),BHT software r
9、eliability corroboration,Null Hypothesis, H0 Alternative Hypothesis, Ha,Software Development Lifecycle,Trustworthy Software Reliability Measure,8,Software Quality Measures (roots),The following ones used in experiments. Lines of code Defect density No defect that remain unresolved after testing, div
10、ided by the LOC. Test coverage LOCtested / LOCtotal. Requirements traceability RT= #_requirements_implemented/#_original_requirements. Function points . . . In principle, any measures available could/should be taken into account. Defining appropriate Reliability Prediction Systems (RPS).,9,Reliabili
11、ty Prediction Systems,An RPS is a complete set of measures from which software reliability can be predicted. The bridge between an RPS and software reliability is a MODEL. Therefore, select (and collect) those measures that have the highest relevance to reliability. Relevance to reliability ranked f
12、rom expert opinions Smidts 2002.,10,RPS for Test Coverage,11,Approach,Software quality Measures (SQM),Reliability Prediction Systems (RPS),RPS Combination Techniques,SW Reliability Corroboration Testing,SQM1,SQM3,SQM2,SQM4,SQM6,SQM5,SQMi,SQMj,RPS1,RPS2,RPSk,RPSm,. . .,RPS Combination (Experience, Le
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AFRAMEWORKFOREARLYRELIABILITYASSESSMENTPPT
