1、Ensemble-level Power Management for Dense Blade Servers,Partha Ranganathan, Phil Leech Hewlett Packard David Irwin, Jeff Chase Duke University,HP Confidential,2,The problem,Power density key challenge in enterprise environments Blades increasing power density; Data center pushback on cooling,Increas
2、ed thermal-related failures if not addressedProblems exacerbated with data center consolidation,HP Confidential,3,Challenges with Traditional Solutions,Pure infrastructure solutions reaching limits Forced air cooling to liquid cooling? 60+Amps per rack?Large costs for power and cooling Capital costs
3、: E.g., 10MW data center, $2-$4 million for cooling equipment Recurring costs: At data center, 1W of cooling for 1W of power For 10MW data center, $4-$8 million for cooling powerCan we address this problem at system design level?,HP Confidential,4,This Talk: Contributions,Address power density at sy
4、stem levelEnsemble-level architecture for power management Manage power budget across collections of systems Recognize trends across multiple systems Address compounded overprovisioning inefficienciesPower trends from 130+ servers in real deployments Extract power efficiencies at larger scale Archit
5、ecture and implementation Simple hardware/software support; preemptive and reactive policies Prototype and simulation at blade enclosure level Significant power savings; no performance loss,HP Confidential,5,Workload Behavior Trends,Nominal different from peak (and nameplate),Data from ,HP Confident
6、ial,6,Workload Behavior Trends,Sum-of-peaks peak-of-sums (system-of-system) Non-synchronized burstiness across systems,Data from ,300,150,HP Confidential,7,Workload Behavior Trends,Similar trends on 132 servers in 9 different sitesWhat does this mean? Compounded inefficiencies Managing power budget
7、for individual peak 20W blades, 500W enclosures, 10KW racks, Managing power budget for ensemble typical-case 20W blades, 250W enclosures, 4KW racks, ,HP Confidential,8,Functional Architecture,Hardware-software coordination for power control Provision system for lower power budget Intelligent softwar
8、e agent Monitors power of individual blades Ensures that total power of enclosure not threshold Use power throttling hooks in system in rare case of violations,Application requirements,HP Confidential,9,Enclosure-level Implementation,* Initialization and setup * data gathering/heartbeat checking * E
9、vent response,HP Confidential,10,Implementation Choices,Selection of system power budget What value? Enforcement strictness? Thermal provisioning: relaxed Power provisioning: strict Power monitoring and control Power/Temp? Polling/interrupts? Components? P-states?,HP Confidential,11,Implementation C
10、hoices (2),Policies for power throttling Assigning power budgets Preemptive: “ask before you can use more power” Reactive: “use as much as you want until told you cant” Choice of servers to (un)throttle Round-robin, lowest-performance, highest-power, fair-share, Power level to (un)throttle Increment
11、al, deep, Resource estimation and polling heuristics,HP Confidential,12,Outline,Introduction Characterizing real-world power trends Architecture & Implementation Evaluation Conclusions,HP Confidential,13,Prototype Experiments,Experimental test bed with 8 proto blades 1 GHz TM8000, 256MB, 40GB, Windo
12、ws(533MHz/0.8V, 600MHz/.925V, 700MHz/1V, 833MHz/1.1V, 1000MHz/1.25V) Prior blade design + power monitoring support Firmware changes to BIOS and blade/enclosure controllersBenchmarks: VNCplay and batch simulationsMeasured power and performanceTradeoffs + Validates implementation + Actual performance
13、and power results - Hard to model real enterprise traces - Hard to do detailed design space exploration,HP Confidential,14,Simulator Experiments,High-level model of blade enclosure Input resource utilization traces Power/performance models Configurable architecture parameters Results validated on pr
14、ototypeBenchmarks 9 real enterprise site traces for 132 servers Synthetic utilization traces of varying concurrency, load, Metrics Total workload performance, per-server performance Changes in utilization, frequency, MIPS for peak/idle Usage of different P-states, impact of delays,HP Confidential,15
15、,Results,Significant enclosure power budget reductions 10-20% enclosure level, 25-50% processor level Higher savings possible with other P-state controls Marginal impact on performance (less than 5%) Preemptive competitive to reactive,HP Confidential,16,Interactive Applications,Minimal impact on lat
16、ency Vncplay interactive latency CDFs within measurement error,HP Confidential,17,Sensitivity Experiments,Other policy choices No impact on real workload traces Throttling few servers at high P-states preferable (vs. throttling many servers at low P-states),Sensitivity to workload characteristics,HP
17、 Confidential,18,Other Benefits,Beyond the enclosure Cascading benefits at rack, data center, etc. “Soft” component power budgets for lower cost e.g.,high-volume high-power vs high-cost low-power CPUAdaptive power budget control Heterogeneous power supplies for low-cost redundancyAverage power reduc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ENSEMBLELEVELPOWERMANAGEMENTFORDENSEBLADESERVERSPPT

链接地址:http://www.mydoc123.com/p-374442.html