Transfer of TINA Results to Standards Bodies.ppt
《Transfer of TINA Results to Standards Bodies.ppt》由会员分享,可在线阅读,更多相关《Transfer of TINA Results to Standards Bodies.ppt(17页珍藏版)》请在麦多课文档分享上搜索。
1、Transfer of TINA Results to Standards Bodies,TINA2000 Paris, France, 13-15 September 2000,TINA Technical Architecture Board Vice Chair,KITAMI, Kenichi,OMG Board of Director SG11 WP1 Chair Chair, Technical Assembly of TTC, Japan,NTT Information Sharing Laboratory Group,Objectives of this Presentation
2、,Provide an Overview of TINA Results transferred to Standard Bodies Secure platform to keep TINA Specifications Ensure the effectiveness of TINA Technologies,Collaborating Standard Bodies,TINA-C has been contributing to many Leading Standard Bodies. They include:,The Object Management Group: OMGTINA
3、-C has Cross Membership with OMG. TeleManagement Forum: TMF The International Telecommunication Union-Telecommunication Sector: ITU-T Study Group 10: Telecommunication Languages and Software Study Group 11: Signalling 3rd Generation Partnership Project: 3GPP in collaboration with European Telecommun
4、ication Standard Institute:ETSI (SPAN3),Overview of the Achievement: OMG,TINA Access Session and Consumer-Retailer RfP Specifications have been reflected to an OMG Standard named as “Telecommunications Service Access and Subscription facility (TSAS)” developed by the Telecom Domain TF. Through the m
5、erging process for TSAS, TINA Results has also been reflected to the corresponding Parlay Specification. A White Paper for Open Services Marketplace (OSM) RFI was created reflecting TINA results by the active involvement of TINA-C members. TINA ODL highlighted the Telecom Requirements for the Object
6、 Interfaces, and they are reflected in CORBA Component Model (CCM) approved this year.,Press Release reporting approval of TSAS,Overview of the Achievement: ITU-T, Achievements in ITU-T SG10 SG10 approved in 1999 the Object Definition Language as Z.130, based on TINA-C ODL. SG10 will approve DPE Arc
7、hitecture as Z.600, based on the TINA DPE Architecture this November., Achievements in ITU-T SG11 SG11 approved two Supplements covering TINA Business Model, TINA-C Service Architecture, Ret specification in its Q.1 for “Signalling and Protocol Framework for Evolving Environment (SPFEE)”. SG11 also
8、approved a Supplement (TRQ.2001) including TINAs “session“ definitions and Business Model in its Q.6 for “B-ISDN Signaling Requirements”.,Business model in TRQ.2001 approved by SG11,Network connectivity provider,Retailer,Broker,Consumer,Service provider,Logical reference point designation: LRP-XY (b
9、etween domain “X” and domain “Y”),LRP-CC,LRP-SS,LRP-NN,LRP-RR,LRP-BB,LRP-SN,LRP-RN,LRP-NB,LRP-CN,LRP-SR,LRP-SB,LRP-CR,LRP-CB,LRP-CS,LRP-RB,TRQ.2001: GENERAL ASPECTS FOR THE DEVELOPMENT OF UNIFIED SIGNALLING REQUIREMENTS,Overview of the Achievement: 3GPP and TMF, Achievements in 3GPP 3GPP in cooperat
10、ion with ETSI SPAN3 approved Open Service Architecture (OSA) containing specification relevant to OMGs “Telecommunications Service Access and Subscription facility (TSAS)” which is reflecting TINA Access Session and Consumer-Retailer RfP specification., Achievement in TMF The collaboration work plan
11、 is in preparation, including mapping between TINA business model and TMF business process, connection mgmt and reference points, and IP control mgmt issues.,Ongoing Activities,OMG will continue to be a center of TINA-based Standard development in many areas including: TINA Service Architecture and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- TRANSFEROFTINARESULTSTOSTANDARDSBODIESPPT
