1、PMP 资格认证考试-项目质量管理(一)及答案解析(总分:50.00,做题时间:90 分钟)一、单项选择题(总题数:50,分数:50.00)1.Checklists are completed in which process? A) Risk identification. B) Quality assurance. C) Quality planning. D) Quality control.(分数:1.00)A.B.C.D.2.An early version of one of W. Edward Demings 14 points encouraged companies to “
2、cease dependence on mass inspection by building quality into the product in the first place”. Deming stated that, typically, products are inspected as they come off the line or at major stages. Defective products are either thrown out or reworked. Both options are expensive. This approach, in effect
3、, meant that companies would pay workers to make defects and then correct them. Denting later recognized the value of inspections and revised the point to say that people should “understand the purpose of inspection. ” He said, “Inspections must be carried out in a professional way, not by lick-spit
4、 methods. ” This supports the PMBOK, which indicates that inspections can be used to determine whether results conform to requirements. Inspections also may be called _ . A) control tests B) walk-through C) statistical sampling D) checklists(分数:1.00)A.B.C.D.3.Investment in product quality improvemen
5、t, especially defect prevention and appraisal, can often be borne by _ . A) the organization B) the project management team C) executive management D) the project(分数:1.00)A.B.C.D.4.A project team is in the design stage of a new mountain bike prototype. The team is in the process of identifying which
6、 type of frame and material will provide high performance at a low cost. Which of the following is the MOST likely technique used to determine these variables? A) Benefit/cost analysis. B) Ishikawa diagram. C) Design of experiments. D) System flow chart.(分数:1.00)A.B.C.D.5.A team member notices the p
7、roject manager that a quality measurement for the project can not be met. What should the project manager do? A) Notify management. B) Hold a team meeting. C) Look for alternative ways to meet the quality level. D) Ask management tp come up with options.(分数:1.00)A.B.C.D.6.In your project, you are in
8、 the process of determining whether the activities being done as part of your project comply with organizational and project policies. This will be done as part of _ . A) inspection B) quality audit C) quality improvement D) trend analysis(分数:1.00)A.B.C.D.7.An outputs from the quality planning proce
9、ss is _ . A) quality improvements B) quality management plan C) acceptance decisions D) rework(分数:1.00)A.B.C.D.8.Quality costs include all of the following EXCEPT _ . A) appraisal B) prevention C) external failure D) computer operations(分数:1.00)A.B.C.D.9.Quality _ is the application of planned, syst
10、ematic quality activities to ensure that the project will employ all processes needed to meet requirements. A) planning B) assurance C) improvement D) benchmarking(分数:1.00)A.B.C.D.10.Since your quality process was not up to the four sigma requirements desired by your customer, some of your products
11、were rejected, and there is a potential that you would not get repeat business from the same customer. From a quality perspective. the costs associated with your products being rejected can also be categorized as _ . A) cost of conformance B) customer retention costs C) failure costs D) performance
12、cost(分数:1.00)A.B.C.D.11.Identifying which quality standards are relevant to the project and determining how to satisfy them should be addressed during _ . A) the conceptual phase B) the planning process C) project implementation D) risk identification(分数:1.00)A.B.C.D.12.You are the project manager f
13、or a manufacturing company involved with making components for Internal Combustion Engines required for the automobile industry. In the past couple of days, there have been too many defects, and you would like to find out whether unusual events are occurring in your manufacturing process whose cause
14、s must be identified and corrected. For this purpose, you should use _ . A) inspection B) Pareto charts C) statistical sampling D) control charts(分数:1.00)A.B.C.D.13.All of the following represent, or result from, the primary benefit of meeting quality requirements EXCEPT _ . A) less rework B) higher
15、 productivity C) lower costs D) fewer change orders(分数:1.00)A.B.C.D.14.The primary purpose of benchmarking is to _ . A) perform marketing research to forecast how well a particular product will sell B) measure products, services, and processes against those of other organizations C) understand and c
16、ollect data on customer requirements to focus attention on meeting customer needs D) determine performance targets(分数:1.00)A.B.C.D.15.You are trying to determine what cost and schedule trade-off will be most appropriate for your project. You have the option to select either a more experienced person
17、 at $120 per hour who can do the task in 45 days or a less experienced person at $80 per hour who can do the same task in 65 days. A tool you can use to facilitate making the decision is _ . A) cost of quality B) cause-and-effect diagram C) design of experiments D) network diagrams(分数:1.00)A.B.C.D.1
18、6.The primary driver behind the demand for continual quality improvement is _ . A) an increase in the number of the projects being worked B) widespread public interest in government cost improvement reports C) the prevalence of media reports on quality circles and other quality improvement D) the ne
19、ed to reduce the cost and ensure the performance of products(分数:1.00)A.B.C.D.17.According to the 80/20 rule, 80 percent of the problems are because of 20 percent of the causes. To facilitate finding out which are the most probable defects, and to evaluate nonconformities, you do a rank ordering of t
20、he defects using _ . A) statistical sampling B) control chart C) Pareto diagrams D) inspection(分数:1.00)A.B.C.D.18.Which of the following is not considered a cost of nonconformance to quality? A) Scrap. B) Rework. C) Expediting. D) Process control.(分数:1.00)A.B.C.D.19.Understanding, evaluating, defini
21、ng, and managing expectations are essential to satisfying _ . A) customer requirements B) the scope statement C) upper management D) functional requirements(分数:1.00)A.B.C.D.20.A fundamental tenet of modern quality management holds that quality is most likely to be achieved by _ . A) planning it into
22、 the project B) developing careful mechanisms to inspect for quality C) striving to do the best job possible D) conducting quality circle activities(分数:1.00)A.B.C.D.21.Learning curve theory emphasizes that in producing many goods, _ . A) cost decreases as production rates increase B) average unit co
23、st decreases as more units are produced C) materials become cheaper when they are purchased in bulk D) laborers become more productive because of technological advances(分数:1.00)A.B.C.D.22.The required testing for a specific task has been completed and passed. The customer is not confident of the tes
24、t and requests an additional modified test, this situation indicates inadequate _ . A) control procedures B) audit review C) assurance funding D) quality plan development(分数:1.00)A.B.C.D.23.Quality control involves monitoring specific project results to determine if they comply with relevant quality
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 质量管理 答案 解析 DOC