IEEE 1590-2009 en Recommended Practice for the Electrical Protection of Communication Facilities Serving Electric Supply Locations Using Optical Fiber Systems《光.pdf
《IEEE 1590-2009 en Recommended Practice for the Electrical Protection of Communication Facilities Serving Electric Supply Locations Using Optical Fiber Systems《光.pdf》由会员分享,可在线阅读,更多相关《IEEE 1590-2009 en Recommended Practice for the Electrical Protection of Communication Facilities Serving Electric Supply Locations Using Optical Fiber Systems《光.pdf(47页珍藏版)》请在麦多课文档分享上搜索。
1、IEEE Std 1590-2009(Revision ofIEEE Std 1590-2003)IEEE Recommended Practice for theElectrical Protection ofCommunication Facilities ServingElectric Supply Locations UsingOptical Fiber SystemsIEEE3 Park Avenue New York, NY 10016-5997, USA26 June 2009IEEE Power +1 978 750 8400. Permission to photocopy
2、portions of any individual standard for educational classroom use can also be obtained through the Copyright Clearance Center. IntroductionThis introduction is not part of IEEE Std 1590-2009, IEEE Recommended Practice for the Electrical Protection of Communication Facilities Serving Electric Supply
3、Locations Using Optical Fiber Systems. Some electrical environments, collectively called electric supply locations, require the application of unique electrical protection techniques because of their special nature. One such environment is the electric power station or substation. Another is at, or
4、near, power line transmission and distribution structures such as towers or poles. Such structures often provide a convenient site for the location of wireless, personal communications service, and cellular antennas and their associated electronic equipment that is served by a link to the wired tele
5、communications network. IEEE Std 487-2007aprovides additional details on these locations. This recommended practice assumes that optical fiber cables are to be used to provide electrical isolation for telecommunications services to these electric supply locations. Refer to IEEE Std 367-1996 or IEEE
6、Std 487-2007. This recommended practice describes applications consisting entirely of fiber and applications where both metallic cables and fiber cables are used. In the latter case, i.e., hybrid applications, the user is referred to IEEE Std 487-2007 for the metallic portion of the application. Som
7、e delays in site activation often occur due to the time involved in obtaining electrical information data for most high-voltage tower or pole sites. The delays may be eliminated by using the fiber optical solutions described in this recommended practice. This recommended practice has been prepared b
8、y the Wireline Working Group of the Power System Communications Committee of the IEEE Power this overhead grounding system will reduce ground return current at individual towers and reduce clearing time of the fault by providing a more direct path to operate relays. These systems follow many differe
9、nt protection designs, from being grounded at each tower and the substations to being insulated with a 3 to 5 kV spark gap device at every tower or every fourth tower. They may be stopped two to four spans before the substation or extend from the substation three to four spans only to protect the su
10、bstation alone. In low lightning areas, they may not exist at all, and each tower is left to stand on its own. The net effect of the overhead grounding system is to reduce the ground return current at individual towers by providing multiple discharge paths. This, in turn, reduces the current flowing
11、 through the ground grid reduces clearing time, and lowers fault-produced GPR to manageable levels. Typical grounding requirements for BTS Several documents, such as R56B B32, are in general use in the wireless industry. These documents provide minimum grounding requirements, along with site prepara
12、tion recommendations, necessary to meet personnel safety and warranty conditions from the equipment vendors or manufacturers. These documents tend to recommend low ground impedances for 50 to 60 Hz power as well as lightning frequencies at the sites. When the sites are located at, or near, power lin
13、e transmission and distribution structures such as towers or poles, enhancements of the ground field may be necessary to meet these requirements to reduce step, touch, and mesh voltages. As a reminder, and for the purposes of this recommended practice, mesh voltage is the maximum touch voltage to be
14、 found within a mesh of a ground grid; step voltage is the difference in surface potential experienced by a person bridging a distance of 1 m (3 ft) with his or her feet without contacting any other grounded object; and touch voltage is the potential difference between the GPR and the surface potent
15、ial at the point where a person is standing, while at the same time having his or her hands in contact with a grounded structure.1313Taken from IEEE Std 80-2000. 16Copyright 2009 IEEE. All rights reserved. IEEE Std 1590-2009 IEEE Recommended Practice for the Electrical Protection of Communication Fa
16、cilities Serving Electric Supply Locations Using Optical Fiber Systems 8.6.4 Step, touch, and mesh voltages for BTSs located on power line transmission or distribution structures Lightning and 50 to 60 Hz fault currents for BTSs located on a high-voltage transmission structures can flow on three pre
17、dominant conducting paths back to their source(s) within the power grid. The first path is the tower sky wire system (when used) grounded to earth and near tower groundings in, on, or adjacent to the lines right of way (ROW). The second path is the tower and BTS combined grounding system. The third
18、path is through the local power system ground that provides power to the site. Figure 5 depicts these current distribution paths (see Grcev et al. B11 and B13). ACPOWERBTSRADIOSKYWIRESLIGHTNINGSTRIKENOTEReprinted with permission from Grcev et al. B11.Figure 5 Possible lightning current distributions
19、 for a BTS on a power tower The distribution, or current magnitude on the various paths, becomes a function of the path impedance at the various fault frequencies. The frequency and fault current path relationships are shown in Figure 6.According to Grcev et al. B11, B12, and B13, at the fundamental
20、 50 to 60 Hz power frequencies the sky wires conduct approximately 60% of the fault current while the tower/BTS grounding system conducts less that 10% to remote earth (low-frequency GPR). The remaining current follows the local ac power grounding network and distributes it throughout the community
21、(see Rajotte et al. B33). At lightning frequencies approaching 10 to 100 kHz, the inductive characteristic of the sky wires and local power present higher impedances, while the tower presents a lower impedance to ground and conducts over 90% of lightning fault currents (high-frequency GPR). 17Copyri
22、ght 2009 IEEE. All rights reserved. IEEE Std 1590-2009 IEEE Recommended Practice for the Electrical Protection of Communication Facilities Serving Electric Supply Locations Using Optical Fiber Systems MAGNITUDE OFCURRENT(%)FREQUENCY (Hz)1001008060402001k 10k 100k 1e+6SKY WIRESTOWERGROUNDSLV-MVPOWER5
23、0-60HzNOTEReprinted with permission from Grcev et al. B12.Figure 6 Current distribution between sky wires, tower grounds, and local power These current flow relationships present an abundance of step, touch, and mesh voltages at the site during low- and/or high-frequency fault conditions. To promote
24、 worker safety and to reduce equipment electrical failures, the recommendations of Figure 7 provide various means of reducing these hazardous voltage levels. 1PWRBTSOEI362POWERTRANSMISSIONTOWER7CONCRETE PAD,ELEVATEDMETALLICPLATFORM,OR STANDALONE BUILDING98ICEBRIDGE1114GATEWIRE MESHSAFETY MATSECURITY
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEE15902009ENRECOMMENDEDPRACTICEFORTHEELECTRICALPROTECTIONOFCOMMUNICATIONFACILITIESSERVINGELECTRICSUPPLYLOCATIONSUSINGOPTICALFIBERSYSTEMS

链接地址:http://www.mydoc123.com/p-1248315.html