ASTM F1460 F1460M-2018 Standard Practice for Calibrating Oil Spill Dispersant Application Equipment Boom and Nozzle Systems.pdf
《ASTM F1460 F1460M-2018 Standard Practice for Calibrating Oil Spill Dispersant Application Equipment Boom and Nozzle Systems.pdf》由会员分享,可在线阅读,更多相关《ASTM F1460 F1460M-2018 Standard Practice for Calibrating Oil Spill Dispersant Application Equipment Boom and Nozzle Systems.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F1460 07 (Reapproved 2013)F1460/F1460M 18Standard Practice forCalibrating Oil Spill Dispersant Application EquipmentBoom and Nozzle Systems1This standard is issued under the fixed designation F1460;F1460/F1460M; the number immediately following the designation indicatesthe year of origi
2、nal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers uniform procedures for determining and repo
3、rting the dosage rate of oil spill dispersant applicationequipment.1.2 This practice is applicable to spray systems employing booms and nozzles and is not fully applicable to other systems suchas fire monitors, sonic distributors, or fan-spray guns.1.3 This practice is applicable to systems for use
4、on ships or boats and helicopters or ships, boats, helicopters, or airplanes.1.4 This practice is one of four related to dispersant application systems using booms and nozzles. One is on design, one oncalibration, one on deposition, and one on the use of the systems. Familiarity with all four standa
5、rds is recommended.1.5 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in eachsystem may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from thetwo systems may result in
6、 non-conformance with the standard.1.6 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety safety, health, and healthenvironmental practices and determine theapplic
7、ability of regulatory limitations prior to use.1.7 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Principles for the Development of International Standards, Guides and Recommendations issuedby the Wo
8、rld Trade Organization Technical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2F1413 Guide for Oil Spill Dispersant Application Equipment: Boom and Nozzle Systems3. Significance and Use3.1 This practice will enable calibration of oil spill dispersant application equipm
9、ent and ensure a desired dosage and uniformityacross the swath width.3.2 The data provided by the methods described herein will permit the preparation of a chart relating delivery rate withapplication vehicle speed, flow meter reading or pump setting so that in actual application, the desired dosage
10、 will be achieved.3.3 This practice will ensure that a dispersant application system is functional, capable of delivering a specified dosage, and thatmajor components are operational. This will also ensure that the unit is functioning according to design specifications as detailedin Guide F1413.4. A
11、pparatus and Materials4.1 Pailsof capacity 7 to 20 L (22 to 5 U.S. gal)gal to catch the spray from the nozzles.1 This practice is under the jurisdiction ofASTM Committee F20 on Hazardous Substances and Oil Spill Response and is the direct responsibility of Subcommittee F20.13on Treatment.Current edi
12、tion approved April 1, 2013Oct. 1, 2018. Published July 2013December 2018. Originally approved in 1993. Last previous edition approved in 20072013 asF1460 07.07(2013). DOI: 10.1520/F1460-07R13.10.1520/F1460-18.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Custom
13、er Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the
14、previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright AST
15、M International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States14.2 Graduated Cylinderof capacity 7 to 20 L 2 to 5 U.S. gal or a scale having capacity of at least 20 kg (45 lbs)45 lbsto determine the amount of fluid in each pail. Commercial equipment with an accu
16、racy of at least 1 % is adequate.4.3 Stopwatch.4.4 Test FluidWater can be used as a test fluid if the viscosity of the dispersant to be used is not dissimilar to the viscosityof water. A surrogatetest fluid should be used if the viscosity difference is greater than approximately 100 times that of wa
17、ter. Thiscan occur with more viscous dispersants or at low temperatures. The surrogatetest fluid could be water with the appropriate amountof thickener.4.5 A continuing supply of water or test fluid, enough to run the system during the test period, must be available. Tank truckquantities may be requ
18、ired.4.6 Auxiliary Power Units, where required.4.7 Thermometer, to measure the temperature of test fluid.4.8 FlowmeterA flowmeter should be incorporated into the delivery system to measure the total flow out to the booms andnozzles.5. Calibration Procedure5.1 SynopsisThe calibration procedure is don
19、e in four steps. The first step is equipment inspection. Any defects are correctedbefore further calibration. The second step is the calibration of the flow meter. The third step is calibration of the unit by catchingwater spray from each nozzle. The fourth step is the preparation of a calibration c
20、urve.5.2 Equipment Setup Place the application equipment at a suitable outdoor location and close to a supply of water or test fluid.Set up the equipment in accordance with the manufacturers instructions and inspect visually. Start the unit. All nozzles shouldvisually be producing approximately the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF1460F1460M2018STANDARDPRACTICEFORCALIBRATINGOILSPILLDISPERSANTAPPLICATIONEQUIPMENTBOOMANDNOZZLESYSTEMSPDF

链接地址:http://www.mydoc123.com/p-1243923.html