1、ACI 336.1-01 supersedes ACI 336.1-98 and became effective October 31, 2001.Copyright 2001, American Concrete Institute.All rights reserved including rights of reproduction and use in any form or by anymeans, including the making of copies by any photo process, or by electronic ormechanical device, p
2、rinted, written, or oral, or recording for sound or visual reproduc-tion or for use in any knowledge or retrieval system or device, unless permission inwriting is obtained from the copyright proprietors.336.1-1Specification for the Constructionof Drilled PiersACI 336.1-01This specification covers re
3、quirements for drilled pier construction. Itincludes delivery, handling, and storage of the casing, excavation, soil test-ing, placing of concrete and reinforcing steel, and inspection. Drilled piersare sometimes called drilled shafts, caissons, or bored piles.Keywords: bored pile; caisson; concrete
4、; drilled pier; foundation; placing;reinforced concrete; reinforcement; slurry; soil; specification; test; tolerance.FOREWORDF1. This foreword is included for explanatory purposesonly. It does not form a part of Specification ACI 336.1.F2. ACI Specification ACI 336.1 is a Reference Specifica-tion to
5、 be used by incorporation in its entirety in the projectspecifications. Individual sections, articles, or paragraphsshall not be copied into the Project Specifications, becausetaking them out of context may change their meanings. Ifsections or parts of ACI Specification 336.1 are copied intoproject
6、specifications or any other document, they shall notbe referred to as ACI Specifications, because the specifica-tion has been altered.F3. A statement such as the following will serve to makeACI Specification 336.1 a part of the Project Specifications:Work on (Project Title) shall conform to all requ
7、irementsof ACI 336.1-00 published by the American Concrete Insti-tute, Farmington Hills, Mich., except as modified by theseContract Documents.F4. Responsibilities for project participants must be de-fined in the project specifications. ACI Specification 336.1defines responsibilities solely for the C
8、ontractor and definesspecific conditions when the Contractor is to take directionfrom the Owners Representative-Geotechnical Engineer.F5. Each technical section of ACI Specification 336.1 iswritten in the Three-Part Section Format of the ConstructionSpecifications Institute, as adapted for ACI requi
9、rements.The language is imperative and terse.F6. Checklists do not form a part of ReferenceSpecification ACI 336.1. Checklists are to assist the specifierin properly choosing and specifying any necessaryrequirements for the Project Specifications.CONTENTSForeword, p. 336.1-1Section 1General requirem
10、ents, p. 336.1-21.1Scope1.2Definitions1.3Reference standards 1.4Standards-producing organizations 1.5Standard units1.6Project conditions1.7Quality assurance1.8Submittals by the ContractorSection 2Products, p. 336.1-42.1General2.2Steel casing and liner2.3Reinforcing steel2.4Concrete2.5Sand-cement gro
11、ut2.6Controlled slurrySection 3Execution, p. 336.1-53.1Tolerances3.2Dry method3.3Steel casing and liner3.4Reinforcing steel3.5Concrete3.6Casing withdrawal3.7Slurry displacement method3.8Placement of anchorage embedmentsReported by ACI Committee 336Clyde N. Baker, Jr. Shraddhakar Harsh John F. Seiden
12、stickerPrabodh V. Banavalkar Edward S. Hoffman Bryan P. SweeneyJoseph A. Bohinsky Javier F. Horvilleur Dan R. StoppenhagenM. T. Davisson Rodrigo Salgado Samuel S. WhiteRonald W. Harris Harold R. Sandberg Edward J. Ulrich, Jr.ChairmanHugh S. LacySecretaryACI STANDARD 336.1-2Preface to specification c
13、hecklists, p. 336.1-9Mandatory requirements checklist, p. 336.1-10Optional requirements checklist, p. 336.1-11Submittal checklist, p. 336.1-22SECTION 1GENERAL REQUIREMENTS1.1Scope1.1.1 This Reference Specification covers requirements fordrilled pier construction and applies to drilled piers of 30 in
14、.(750 mm) diameter and larger. The Contractor shall submitproposed installation methods to the Owners Representa-tive-Geotechnical Engineer. Methods compatible with thedesign intent, as determined by the Owners Representative-Geotechnical Engineer, will be accepted. Methods that arenot compatible wi
15、th the design intent will be rejected.1.1.2 The provisions of this Specification shall govern, un-less otherwise specified in the Contract Documents. In caseof conflicting requirements, the Contract Documents shallgovern. Conflicting requirements shall be submitted to theOwners Representative for re
16、solution.1.2DefinitionsThe following definitions cover the meanings of certainwords and terms used in this Reference Specification.Accept, accepted, acceptable, acceptabilityAdequateor satisfactory as determined by the Owners Representativeor Owners Representative-Geotechnical Engineer.Anchorage emb
17、edmentEmbedment of the anchoragesystem, such as anchor bolts or threaded rods, used to fastenstructural components to the piers.Bearing stratumThe soil or rock stratum that carriesthe load transferred to it by a drilled pier.BellAn enlargement at the bottom of the pier for thepurpose of spreading th
18、e load over a larger area.CasingA permanent or temporary steel cylinder used toresist earth and water pressures, to serve as a concrete form,and to protect personnel.Contract DocumentsDocuments, including theProject Drawings and Project Specifications, covering therequired Work.ContractorThe person,
19、 firm, or corporation with whomthe Owner enters into an agreement for construction of theWork.Controlled slurrySlurry that is controlled to conformto specified properties.Cut-offThe top of a pier, a level surface at the elevationshown on the Contract Drawings.Drilled pierA foundation element, with o
20、r without anenlarged bearing area, extended downward by drillingthrough earth materials, water, or both, to an acceptable de-sign depth and filled with structural concrete.Dry methodMethod of pier installation in which con-crete is placed in the dry and where casing may be used tomaintain sidewall s
21、tability.End bearingWhere load is supported at the bottom ofthe pier.InspectionObservation of construction, equipment, andmaterials used therein, and actual subsurface conditions that,along with related construction engineering decisions madeby the Owners Representative-Geotechnical Engineer, en-abl
22、es the Owners Representative-Geotechnical Engineer torender a professional opinion on expected foundation perfor-mance and the Contractors conformance with the ContractDocuments.LinerA cylindrical form of pier design diameter havingthe tensile strength to withstand internal concrete pressuresand not
23、 designed for external earth and water pressures; usedinside an oversized temporary casing to prevent possibleconcrete contamination when temporary casing is removed.OwnerCorporation, association, partnership, individu-al, public body, or authority with whom the Contractor en-ters into agreement and
24、 for whom the Work is provided. Owners RepresentativeArchitect, Structural Engi-neer, or Geotechnical Engineer authorized to act on behalf ofthe Owner.Owners Representative-Geotechnical EngineerGeotechnical engineer specifically authorized to carry outthe responsibilities defined in this Reference S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI33612001SPECIFICATIONFORTHECONSTRUCTIONOFDRILLEDPIERS 钻孔 桥墩 施工 规范 PDF

链接地址:http://www.mydoc123.com/p-1242782.html