1、10-06M 31 63 16 - 1 SECTION 31 63 16 AUGER CAST GROUT PILES SPEC WRITER NOTE: Delete between / -/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies excavation and co
2、ncrete required for construction of auger-placed concrete piles. 1.2 DEFINITION Auger-placed concrete pile (ACP): Pile formed by rotation of a continuous flight hollow-shaft pile augured into the ground to the indicated depth. Grout is injected through auger shaft as auger is being withdrawn in such
3、 a way as to exert removing pressure on withdrawing earth-filled auger as well as lateral pressure on soil surrounding hole. 1.3 RELATED WORK A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Concrete: Section 03 30 00, CAST-IN-PLACE CONCRETE.
4、 SPEC WRITER NOTE: Make Testing Laboratory services agree with applicable requirements specified in referenced Applicable Publications. Update and specify only that which applies to the project. C. Subsurface investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL DATA. 1.4 CONTRACT
5、 BASIS A. Contract price for ACPs will be based upon total length of piles shown on the Contract Documents. Length of piles will be measured as shown. 1. Adjustment of contract price shall be based upon total length of piles placed, and not on length of individual piles placed. When total length of
6、completed piles is greater or less than length shown, contract price adjustment will be made in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicable. Provided by IHSNot for ResaleNo reproduction or networking permitted without li
7、cense from IHS-,-,-10-06M 31 63 16 - 2 2. Contract price and time will be adjusted in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicable when artificial materials that are not shown are encountered. 1.5 CONTRACTOR QUALIFICATION
8、S A. Approval by Contracting Officer is required of service of proposed Contractor and will be based upon submission by Contractor of certification that: 1. Contractor has technical qualifications, experience, trained personnel and facilities to install auger placed concrete piles as specified. Appr
9、oval will not be given, however, where an experience record is one of unsatisfactory performance. 2. Contractor has installed ACPs on three installations similar and equivalent to this project for 5 years. Submit list of installations. 1.6 TOLERANCES Install piling with a maximum variation of 75 mm
10、(3 inches) of center of any pile from the location shown. Piles shall not be out of plumb more than 2 percent. (Checked by using a hand level prior to the start of drilling). 1.7 DESIGN MODIFICATIONS A. Where piles are installed exceeding specified tolerances for plumb or location, the foundation de
11、sign will be analyzed by / the Resident Engineer / Government / and if necessary redesigned by / Resident Engineer / Government /. Costs for analysis, redesign, and remediation shall be responsibility of Contractor. B. Additional piles and pile cap modifications necessitated by redesign shall be fur
12、nished and installed, at no additional cost to the Government. 1.8 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Certification to Examination of Site and Records: Before proceeding with the Work, submit copy of certification in acceptable form
13、 signed by the Contractor, stating that careful examination has been made of the site, existing structures, and records of utility lines, test boring records, soil samples, and subsurface exploration reports by the Owners Geotechnical Engineer, Drawings, and Specifications. Provided by IHSNot for Re
14、saleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 63 16 - 3 C. Shop Drawings and Miscellaneous Submittals: 1. Description of pile drilling equipment. 2. Description of grout pump and pressure gage calibration reports. 3. Pile Installation Recorder (PIR) calibration r
15、eports. 4. Complete description of method for ACP pile installation with a pile layout plan referenced to the structural plans, including a numbering system capable of identifying each individual pile, pile sizes, including pile length and tip elevations, reinforcing steel, and waterproofing details
16、. In addition, furnish a detailed description of construction procedures, including steel shells, if used, and auguring methods. 5. Steel Reinforcement Shop Drawings: Comply with ACI 315. Furnish shop drawings prepared by a Professional Engineer licensed in the state of installation that include pla
17、cing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement. a. Prior to fa
18、brication: Indicate steel grades, sizes, bending details, protective coatings, spacing, placement and supports. b. Supplementary Product Literature: Furnish manufacturers literature describing general properties of each product to be used in the Work. c. Certifications: Furnish manufacturers certifi
19、ed reports of mill tests for reinforcing steel and anchorage devices, including physical and chemical analysis. 6. Pile Installation records for all ACPs. D. Reports: 1. Installation of each pile 2. Pile location and plumbness 3. Total quantity of grout placed 4. Load Test E. Product Data: Submit co
20、pies of manufacturers specifications for the following products, including copies of laboratory test reports and other data as may be required to show compliance with these specifications. 1. Fly Ash or Ground Granulated Blast Furnace Slag: ASTM C618, Class C or F and ASTM C989, Grade 100 or 120, re
21、spectively. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 63 16 - 4 2. Plasticizing admixture: ASTM C1017/C1017M, Type II. 3. Grout Fluidifier: ASTM C937 4. Aggregate sieve analysis: ASTM C33. 5. Aggregate sodium sulfate soundness tests:
22、ASTM C88. 6. Portland cement: ASTM C150, Type I, Test Piles Type III. 7. Reinforcing Steel: ASTM A615/A615M, Grade 60 / ASTM A722/A722M, Type II, Thread Bar Type F. Certificates: Contractors qualifications as specified: Experienced specialty piling subcontractor having a minimum of 5 years successfu
23、l experience installing Work of same type required for this project, and evidence of satisfactory completion of at least ten ACP installations comparable in scope of the Work and subsurface conditions. Employ only skilled tradesmen who are thoroughly experienced with the materials and equipment to b
24、e used in the Work. G. Contractors Concrete Testing: Submit 3 copies of the laboratory testing reports to the Resident Engineer, the owners Geotechnical Consultant, and other pertinent parties. 1. Submit report and certification of aggregate. 2. Laboratory Test Reports: Submit for evaluation grout m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3163162006AUGERCASTGROUTPILESPDF