VA 31 32 23-2006 PRESSURE GROUTING SOIL STABILIZATION.pdf
《VA 31 32 23-2006 PRESSURE GROUTING SOIL STABILIZATION.pdf》由会员分享,可在线阅读,更多相关《VA 31 32 23-2006 PRESSURE GROUTING SOIL STABILIZATION.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、10-06M 31 32 23 - 1 SECTION 31 32 23 PRESSURE GROUTING SOIL STABILIZATION SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section covers the app
2、lication of lime slurry into the ground at specified intervals /within 3000 mm (10 feet)/ on either side of the new road for the entire length of the new road./ 1.2 EQUIPMENT A. Equipment shall be suitable for the work, as approved by the testing lab. Equipment shall be constructed to provide a posi
3、tive seal for preventing the slurry from flowing out onto the ground and shall have controls and gauges for setting of pressure and determination of pressure. B. Packers of an acceptable type and length with a minimum diameter of 100 mm (4 in.) shall be utilized by the Contractor to prevent slurry f
4、rom flowing out onto the ground surface. C. Mixer tanks shall be approved by the testing lab and shall be continuously agitated to insure uniformity of mixture. 1.3 RELATED WORK: A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Safety require
5、ments: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION. C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01 00 00, GENERAL REQUIREMENTS. D. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PH
6、YSICAL DATA. 1.4 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. B. Texas Department of Transportation (TxDOT): English Specifications Book, Item 264 (1993: Lime and Lime Slurr
7、y) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 31 32 23 - 2 PART 2 - PRODUCT 2.1 LIME SLURRY A. The lime slurry shall be pumpable suspension of hydrated lime in water. The water or liquid portion of the slurry shall not contain dissolved m
8、aterial in sufficient quantity and/or nature injurious or objectionable for the purpose intended. The solids portion of the mixture, when considered on the basis of “solids contents“, shall consist principally of hydrated lime of a quality and fineness sufficient to meet TxDOT Item 264, Type A as to
9、 chemical composition and residue. B. Proportion lime slurry within the range of 300 to 350 kg/m3 (2-1/2 to 3 pounds per gallon) water of hydrated lime. Check specific gravity of slurry with Ertco Hydrometer No. 2545 or equivalent. Specific gravity readings shall range from 1.14 to 1.16. C. A surfac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3132232006PRESSUREGROUTINGSOILSTABILIZATIONPDF

链接地址:http://www.mydoc123.com/p-1075013.html