VA 09 97 33 10-2010 RESINOUS COATING SYSTEMS FOR WALLS AND CEILINGS (RES-W).pdf
《VA 09 97 33 10-2010 RESINOUS COATING SYSTEMS FOR WALLS AND CEILINGS (RES-W).pdf》由会员分享,可在线阅读,更多相关《VA 09 97 33 10-2010 RESINOUS COATING SYSTEMS FOR WALLS AND CEILINGS (RES-W).pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、11-10 09 97 33.10 - 1 SECTION 09 97 33.10 RESINOUS COATING SYSTEMS FOR WALLS AND CEILINGS (RES-W) SPEC WRITER NOTE: 1. Delete / _/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Identified as RES-W in for resinous w
2、all and ceiling application in VA Program Guide PG 18-14 “Room Finishes, Door address of installation, contact information at installation project site; and date of installation. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 09 97 33.10 - 3 3
3、. Installers Personnel: Employ persons trained for application of specified product. C. Source Limitations: 1. Obtain primary resinous coating materials including primers, resins, hardening agents, grouting coats and finish or sealing coats from a single manufacturer. 2. Provide secondary materials,
4、 including patching and fill material, joint sealant, and repair material of type and from source recommended by manufacturer of primary materials. D. Mockups: Apply mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and establish quality standards for mat
5、erials and execution. 1. Apply full-thickness mockups on 48 inch (1200 mm)square area (wall/ceiling) selected by VA Resident Engineer. 2. Test mock-up with anticipated chemicals to be used in the designated area. 3. Approved mockups not damaged during the testing may become part of the completed wor
6、k if undisturbed at time of Substantial Completion. 4. Sign off from VA Resident Engineer on texture must be complete before installation of wall/ceiling system. E. Pre-Installation Conference 1. Convene a meeting not less than thirty days prior to starting work. 2. Attendance: a. Contractor b. VA R
7、esident Engineer c. Manufacturer and Installers Representative 3. Review the following: a. Environmental requirements i) Air and surface temperature ii) Relative humidity iii) Ventilation iv) Dust and contaminates b. Protection of surfaces not scheduled to be coated c. Inspect and discus condition o
8、f substrate and other preparatory work performed d. Review and verify availability of material; installers personnel, equipment needed e. Design /and pattern/ /s/ and edge conditions. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 09 97 33.10
9、- 4 f. Performance of the coating with chemicals anticipated in the area receiving the resinous coating system g. Application and repair h. Field quality control i. Cleaning j. Protection of coating systems k. One-year inspection and maintenance l. Coordination with other work F. Manufacturers Field
10、 Services: Manufacturers representative shall provide technical assistance and guidance for surface preparation and application of coating systems. 1.5 MATERIAL PACKAGING DELIVERY AND STORAGE A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufact
11、urers name or brand, type and color, production run number, date of manufacture and mixing/thinning instructions. B. Protect materials from damage and contamination in s storage or delivery, including moisture, heat, cold, direct sunlight, etc. C. Maintain temperature of storage area between 60 and
12、80 degrees F (15 and 26 degrees C). D. Keep containers sealed until ready for use. E. Do not use materials beyond manufacturers shelf life limits. F. Package materials in factory pre-weighed and in single, easy to manage batches sized for ease of handling and mixing proportions from entire package o
13、r packages. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Comply with resinous wall/ceiling manufacturers written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting resinous wall/ceiling applications. 1. Maintain material and sub
14、strate temperature between 65 and 85 degrees F (18 and 30 degrees C) during resinous wall/ceiling application and for not less than 24 hours after application. B. Lighting: Provide permanent lighting or, if permanent lighting is not in place, simulate permanent lighting conditions during resinous wa
15、ll/ceiling application. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 09 97 33.10 - 5 C. Close spaces to traffic during resinous wall/ceiling application and for not less than 24 hours after application, unless manufacturer recommends a longe
16、r period. 1.7 WARRANTY A. Work subject to the terms of the Article “Warranty of Construction” FAR clause 52.246-21. B. Warranty: Manufacture shall furnish a single, written warranty covering the full assembly (including substrata) for both material and workmanship for a extended period of (3) full y
17、ears from date of installation, or provide a joint and several warranty signed on a single document by manufacturer and applicator jointly and severally warranting the materials and workmanship for a period of (3) full years from date of installation. A sample warranty letter must be included with b
18、id package or bid may be disqualified. SPEC WRITER NOTE: 1. Update and specify publications which apply to the project. 1.8 APPLICABLE PUBLICATIONS A. The publication listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic des
19、ignation only. B. ACI (American Concrete institute): Comm. 503.1-92 . Four Epoxy Specifications (Reapproved 2003). C. American Society for Testing and Materials (ASTM): D16-08 . Standard Terminology for Paint, Related Coatings, Materials, and Applications D4259-88(2006) . Standard Practice for Abrad
20、ing Concrete D4263-83(2005) . Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method F1869-09 . Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride C. International Concrete Repair Institute (ICRI) Guidel
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA099733102010RESINOUSCOATINGSYSTEMSFORWALLSANDCEILINGSRESWPDF

链接地址:http://www.mydoc123.com/p-1074795.html