UL SUBJECT 2748-2015 UL Outline for Investigation Arcing Fault Quenching Equipment (Issue 3)《电弧故障淬火设备调查大纲 (议题3)》.pdf
《UL SUBJECT 2748-2015 UL Outline for Investigation Arcing Fault Quenching Equipment (Issue 3)《电弧故障淬火设备调查大纲 (议题3)》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 2748-2015 UL Outline for Investigation Arcing Fault Quenching Equipment (Issue 3)《电弧故障淬火设备调查大纲 (议题3)》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNOVEMBER 3, 20151UL 2748Outline of Investigation for Arcing Fault Quenching EquipmentIssue Number 3November 3, 2015Summary of TopicsThis is the Third issue of the Outline of Investigation for Arc
2、ing FaultQuenching Equipment. These requirements cover devices intended toquench arcing faults by creating a lower impedance current path, locatedwithin a controlled compartment, to cause the arcing fault to transfer tothe new current path. The major revisions included in this issue include:1) Expla
3、nation of arc transfer times, including refinement of thetest methods to determine the actual arc transfer time(s),2) Clarify test methods for open type devices that are intended forinstallation in complete equipment, and3) Clarify that the internal arcing fault test and the arc transfer testcan be
4、combined into one test under certain conditions.ULs Outlines of Investigation are copyrighted by UL. Neither a printed norelectronic copy of an Outline of Investigation should be altered in any way. All ofULs Outlines of Investigation and all copyrights, ownerships, and rights regardingthose Outline
5、s of Investigation shall remain the sole and exclusive property of UL.COPYRIGHT 2015 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNOVEMBER 3, 2015UL 27482No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZ
6、ED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTRODUCTION1 Scope .42 Components 43 Units of Measurement .54 Undated References 55 Glossary .5CONSTRUCTION6 General 67 Enclosure 68 Primary or Power Carrying Circuits 69 Grounding 710 Control and Secondary Wiring .711 Cre
7、epage and Clearance Distance .712 Wiring 813 Operation .8RATINGS14 General .9MARKING15 General 10INSTRUCTIONS16 General 11PERFORMANCE17 General 1118 Continuous Current Test .1119 Power-Frequency Withstand Voltage Tests 1220 Maximum Arcing Fault Current Test .1221 Internal Arcing Fault Test 1322 Arc
8、Transfer Test .14NOVEMBER 3, 2015 UL 2748 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements cover equipment intended to quench arcing faults by creating a lower impedancecurrent path, located within a c
9、ontrolled compartment, to cause the arcing fault to transfer to the newcurrent path.1.2 These requirements cover equipment that may either be completely enclosed units or intended to beinstalled within power distribution equipment.1.3 These requirements cover equipment rated up to 38 kV ac maximum.1
10、.4 This outline does not include the requirements for sensors intended to detect arcing fault, devicesintended to trigger the functioning of the arc quenching equipment, or devices that are intended tointerrupt arcing fault currents.1.5 This outline does not include all the requirements for integrat
11、ion and testing of arc quenchingequipment within equipment it is intended to protect.2 Components2.1 Except as indicated in 2.2, a component of a product covered by this outline shall comply with therequirements for that component.2.2 A component is not required to comply with a specific requirement
12、 that:a) Involves a feature or characteristic not required in the application of the component in theproduct covered by this outline; orb) Is superseded by a requirement in this outline.2.3 A component shall be used in accordance with its rating established for the intended conditions ofuse.2.4 Spec
13、ific components are incomplete in construction features or restricted in performance capabilities.Such components are intended for use only under limited conditions, such as certain temperatures notexceeding specified limits, and shall be used only under those specific conditions.NOVEMBER 3, 2015UL
14、27484UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL3 Units of Measurement3.1 Values stated without parentheses are the requirement. Values in parentheses are explanatory orapproximate information.4 Undated References4.1 Any undated reference
15、 to a code or standard appearing in the requirements of this outline shall beinterpreted as referring to the latest edition of that code or standard.5 Glossary5.1 For the purpose of this outline, the following definitions apply.5.2 ARCING FAULT A non-intentional discharge of electrical energy in air
16、 or other gas, includingdischarges across the surface of an insulating material.5.3 ARC TRANSFER TIME The interval between triggering of the arc quenching device and thequenching of the arc.5.4 CONTROLLED COMPARTMENT A portion of equipment, intended to enclose the new currentpath when an arcing faul
17、t is transferred. This compartment may be provided with openings or flaps forpressure relief.5.5 LOW VOLTAGE A voltage of 1000 V ac or less.5.6 MEDIUM VOLTAGE A voltage of greater than 1000 V ac, up to 38 kV ac.5.7 POLLUTION DEGREE 2 MICROENVIRONMENT An area where normally, only nonconductivepolluti
18、on occurs, but where occasional, temporary conductivity may be expected. Typical constructionsthat reduce the possibilities of conductive pollution and condensation or high humidity are;a) Un-ventilated enclosures that are provided with continuous application of heat through theuse of heaters or thr
19、ough continuous energization of the equipment, with interruptions such thatcooling to the point of condensation does not occur orb) The use of ventilated enclosures where all openings are provided with filters.5.8 QUENCHING DEVICE Equipment that is used to extinguish or redirect an arcing fault.NOVE
20、MBER 3, 2015 UL 2748 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONSTRUCTION6 General6.1 Where referenced in this outline of investigation, requirements contained in the Standard forMetal-Enclosed Low-Voltage Power Circuit Breaker Switch
21、gear, UL 1558, are applicable to low voltagequenching devices, and the requirements contained in the Standard for Metal-Enclosed Switchgear,ANSI/IEEE C37.20.3 are applicable to medium voltage quenching devices.7 Enclosure7.1 Other than as noted in 7.2, quenching devices shall comply with the require
22、ments of 7.3 7.6.7.2 Devices covered by this outline of investigation that are intended for installation completely within theenclosure of other equipment need not be provided with an enclosure.7.3 Low voltage devices provided with complete enclosures shall comply with the enclosure requirementsof t
23、he Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear, UL 1558, ANSIC37.20.1. Medium voltage devices provided with complete enclosures shall comply with the enclosurerequirements of the Standard for Metal-Enclosed Interrupter Switchgear, ANSI/IEEE C37.20.3.7.4 Where a portion o
24、f the quenching device is intended to fill or protrude through an opening, orotherwise form a portion of the enclosure of the overall equipment, it shall be investigated in accordancewith the enclosure requirements of the standard for the overall equipment.7.5 Devices described in 7.3 and 7.4 may be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT27482015ULOUTLINEFORINVESTIGATIONARCINGFAULTQUENCHINGEQUIPMENTISSUE3 电弧 故障 淬火 设备 调查 大纲 议题 PDF

链接地址:http://www.mydoc123.com/p-1069340.html