TIA-902 BAAF-2003 Wideband Air Interface Mobility Management (MM) Layer Specification - Public Safety Wideband Data Standards Project Digital Radio Technical Standards《宽带空中接口移动性管理层.pdf
《TIA-902 BAAF-2003 Wideband Air Interface Mobility Management (MM) Layer Specification - Public Safety Wideband Data Standards Project Digital Radio Technical Standards《宽带空中接口移动性管理层.pdf》由会员分享,可在线阅读,更多相关《TIA-902 BAAF-2003 Wideband Air Interface Mobility Management (MM) Layer Specification - Public Safety Wideband Data Standards Project Digital Radio Technical Standards《宽带空中接口移动性管理层.pdf(88页珍藏版)》请在麦多课文档分享上搜索。
1、 TIA DOCUMENT Wideband Air Interface Mobility Management (MM) Layer Specification - Public Safety Wideband Data Standards Project Digital Radio Technical Standards TIA-902.BAAF MAY 2003 TELECOMMUNICATIONS INDUSTRY ASSOCIATION The Telecommunications Industry Association represents the communications
2、sector of Copyright Electronic Industries Alliance Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstanding
3、s between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Publications shall not in any respect preclude any member
4、 or non-member of TIA from manufacturing or selling products not conforming to such Publications. Neither shall the existence of such Documents preclude their voluntary use by non-TIA members, either domestically or internationally. TIA DOCUMENTS TIA Documents contain information deemed to be of tec
5、hnical value to the industry, and are published at the request of the originating Committee without necessarily following the rigorous public review and resolution of comments which is a procedural part of the development of a American National Standard (ANS). Further details of the development proc
6、ess are available in the TIA Engineering Manual, located at http:/www.tiaonline.org/standards/sfg/engineering_manual.cfm TIA Documents shall be reviewed on a five year cycle by the formulating Committee and a decision made on whether to reaffirm, revise, withdraw, or proceed to develop an American N
7、ational Standard on this subject. Suggestions for revision should be directed to: Standards however, a great deal of time and good faith effort has been invested in the preparation of this document to ensure the accuracy of the information it contains. While all reasonable efforts have been made to
8、ensure the accuracy of this document, it should be understood that significant work remains in fully developing the standard series and this document will be updated as necessary. Copyright Electronic Industries Alliance Provided by IHS under license with EIANot for ResaleNo reproduction or networki
9、ng permitted without license from IHS-,-,-TIA-902.BAAF WAI Mobility Management Layer Specification ii Patent Identification The readers attention is called to the possibility that compliance with this document may require the use of one or more inventions covered by patent rights. By publication of
10、this document, no position is taken with respect to the validity of those claims or any patent rights in connection therewith. The patent holders so far identified have, we believe, filed statements of willingness to grant licenses under those rights on reasonable and nondiscriminatory terms and con
11、ditions to applicants desiring to obtain such licenses. The following patent holders and patents have been identified in accordance with the TIA intellectual property rights policy: None currently identified TIA shall not be responsible for identifying patents for which licenses may be required by t
12、his document or for conducting inquiries into the legal validity or scope of those patents that are brought to its attention. Copyright Electronic Industries Alliance Provided by IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-WAI Mobility
13、 Management Layer Specification TIA-902.BAAF iii TABLE OF CONTENTS 1. SCOPE1 2. TERMS 2 3. GENERAL MM LAYER DES CRIPTION 3 3.1 NETWORK REGISTRATION 3 3.1.2 Unit Registration 5 3.1.3 Location Registration5 3.1.4 Location Area Paging5 3.1.5 Network Registration Sequence Example5 3.2 MRC AUTHENTICATION
14、 5 3.3 RADIO RESOURCE MANAGEMENT . 5 3.4 MRC NEGOTIATED ABSENCE . 6 3.5 INFORMATION FLOW INSIDE THE MM 6 3.6 INTERFACE TO MRC/FNE SERVICE USERS. 6 3.7 INTERFACE TO LLC LAYER 7 3.8 MRC INFORMATION STORAGE 8 4. MM OPERATION.9 4.1 MM STATE TRANSITION DIAGRAM. 9 4.1.1 Closed State.10 4.1.2 Channel Hunt
15、State (MRC Only).10 4.1.3 Camped State (MRC Only) .11 4.1.4 Unit Registration State11 4.1.5 Location Registration State11 4.1.6 Open State12 4.2 SYSTEM BROADCAST OPERATION . 13 4.2.1 Additional Channel Status Broadcast Procedures13 4.2.2 Adjacent Status Broadcast Procedures 13 4.2.3 Channel Identifi
16、er Update Broadcast Procedures.13 4.2.4 System Identification Broadcast Procedures.14 4.2.5 System Time and Data Broadcast Procedures.14 4.3 MRC CHANNEL ACQUISITION OPERATION 15 4.3.1 MRC Controlled (Type 1) Procedures15 4.3.2 FNE Controlled (Type 2) Procedures.17 4.4 MRC CONFIGURATION OPERATION. 19
17、 4.4.1 MRC Configuration Procedures19 4.5 MRC REGISTRATION OPERATION. 20 4.5.1 Overview.20 4.5.2 Unit Registration Procedures.20 4.5.3 Location Registration Procedures 22 4.5.4 Location Area Paging Procedures23 4.6 MRC AUTHENTICATION OPERATION 24 Copyright Electronic Industries Alliance Provided by
18、IHS under license with EIANot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TIA-902.BAAF WAI Mobility Management Layer Specification iv 4.6.1 Overview.24 4.6.2 Authentication Procedures.24 4.7 RADIO RESOURCE MANAGEMENT OPERATION. 26 4.7.1 Overview.26 4.7.2 MRC Initia
19、ted RRM Procedures 26 4.7.3 FNE Initiated RRM Procedures .27 4.8 MRC NEGOTIATED ABSENCE OPERATION. 29 4.8.1 Overview.29 4.8.2 Negotiated Absence Procedures29 4.8.3 Broadcast Information.30 4.8.4 Negotiated Absence State Transition Diagrams.30 4.8.5 Successful Example of Negotiated Absence Procedures
20、 .34 5. MM PDU FORMAT DEFINITION35 5.1 GENERAL MM PDU FORMAT 35 5.2 MM FORMAT SUMMARY 36 5.3 INBOUND FNE PDUS 37 5.3.1 Authentication Response (W_AUTH_RES)37 5.3.2 Channel Request (W_CHN_REQ) .38 5.3.3 Channel Signal Quality Indication (W_CSQ_IND).38 5.3.4 Configuration Request (W_CNF_REQ) .39 5.3.5
21、 Negotiated Absence Request (W_NEG_ABS_REQ) .39 5.3.6 Location Area Page Response (W_LA_PAGE_RES) .40 5.3.7 Location Registration Request (W_LOC_REG_REQ) .40 5.3.8 Unit Deregistration Command (W_U_DEREG_CMD)41 5.3.9 Unit Registration Request (W_U_REG_REQ).41 5.4 OUTBOUND FNE PDUS 43 5.4.1 Authentica
22、tion Command (W_AUTH_CMD) 43 5.4.2 Authentication Result (W_AUTH_RST)44 5.4.3 Channel Command (W_CHN_CMD) 44 5.4.4 Configuration Response (W_CNF_RES) .45 5.4.5 Channel Signal Quality Command (W_CSQ_CMD) .46 5.4.6 Location Area Page Request (W_LA_PAGE_REQ) .46 5.4.7 Location Registration Response (W_
23、LOC_REG_RES).47 5.4.8 Negotiated Absence Command (W_NEG_ABS_CMD)47 5.4.9 Unit Registration Command (W_U_REG_CMD) .48 5.4.10 Unit Registration Response (W_U_REG_RES) .48 5.5 FNE BROADCAST PDUS. 50 5.5.1 Adjacent Status Broadcast Type 1 (W_ADJ_STS1_BCST) .50 5.5.2 Adjacent Status Broadcast Type 2 (W_A
24、DJ_STS2_BCST) .51 5.5.3 Additional Channel Broadcast (W_ADC_STS_BCST) .52 5.5.4 Channel Identifier Update Broadcast PDU Type 1 (W_IDEN_UP1_BCST) .53 5.5.5 Channel Identifier Update Broadcast PDU Type 2 (W_IDEN_UP2_BCST) .54 5.5.6 System Identification Broadcast (W_SYS_ID_BCST) 55 5.5.7 Time and Date
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- TIA902BAAF2003WIDEBANDAIRINTERFACEMOBILITYMANAGEMENTMMLAYERSPECIFICATIONPUBLICSAFETYWIDEBANDDATASTANDARDSPROJECTDIGITALRADIOTECHNICALSTANDARDS

链接地址:http://www.mydoc123.com/p-1060917.html